Project Review Comments
- Project Name
- Buc'ees Palmer Lake Nos.1-6 Annexation
- Description
- See the attached documents for the Buc'ees Palmer Lake Nos 1-6 annexation map.
- Location
- Parcels
- 7102200014 7102200014 7102200015 7102200015
- Applicant
-
Town of Palmer Lake
Dawn Collins ( dawn@palmer-lake.org )
(719) 481-2953 Dawn Collins ( dawn@palmer-lake.org )
(719) 481-2953 - File Number
- ANX2411
- Project Manager
- Joe Letke
- Status
- Active
- Created
- 11/4/2024 4:04:43 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
12/5/2024 11:10:24 AM |
The annexation impact report will be presented before the Board of County Commissioners. At present, there is no certain date for the BoCC hearing. Joe Letke Planner joeletke@elpasoco.com |
12/5/2024 11:10:24 AM | |
PCD Engineering Division
12/2/2024 9:44:50 PM |
Previous comments provided still apply. Previous comments have been copied below. A traffic study nor drainage report has provided for review. As development plans are submitted to the Town of Palmer Lake, please provide the traffic impact study and drainage report for review and comments by County staff. Development of the annexation areas will need to address any drainage and traffic impacts to unincorporated areas and any necessary improvements. Maintenance of County Line Road and Beacon Lite Road within this annexation area will be the responsibility of the Town of Palmer Lake. Any maintenance agreement(s) between El Paso County and Douglas County for County Line Road should be transferred to the Town of Palmer Lake. reviewed by: Daniel Torres danieltorres@elpasoco.com 719-520-6305 |
12/2/2024 9:44:50 PM | |
EPC Stormwater Review
12/2/2024 5:31:57 PM |
Review 2: Engineering design documents have not been provided at this time with the annexation application. As development proceeds and plans are submitted to the Town of Palmer Lake, please provide construction drawings and drainage report for review and comments by County staff. Future development of this parcel will need to address any water quality impacts to the County. Planner: no re-review necessary. Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
12/2/2024 5:31:57 PM | |
View |
PCD Project Manager
11/18/2024 5:20:03 PM |
See attached Annexation Review letter date 11/18/24. This letter was emailed to Dawn Collins of Palmer Lake on 11/18/24. Joe Letke Planner joeletke@elpasoco.com |
11/18/2024 5:20:03 PM |
PCD Engineering Division
11/18/2024 4:29:14 PM |
Review #1 comments: A traffic study nor drainage report has provided for review. As development plans are submitted to the Town of Palmer Lake, please provide the traffic impact study and drainage report for review and comments by County staff. Development of the annexation areas will need to address any drainage and traffic impacts to unincorporated areas and any necessary improvements. Maintenance of County Line Road and Beacon Lite Road within this annexation area will be the responsibility of the Town of Palmer Lake. Any maintenance agreement(s) between El Paso County and Douglas County for County Line Road should be transferred to the Town of Palmer Lake. reviewed by: Daniel Torres danieltorres@elpasoco.com 719-520-6305 |
11/18/2024 4:29:14 PM | |
EPC Stormwater Review
11/18/2024 9:39:53 AM |
Review 1: EPC DPW Stormwater has no comments. This annexation is not resulting in soil disturbance. Planner: no re-review necessary. Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
11/18/2024 9:39:53 AM |