Project Review Comments
- Project Name
- Crossroads Mixed Use Filing No. 3, Lot 1
- Description
- Site development plan for Lot 1, Crossroads Mixed Use Filing 3 SF_____
- Location
- Parcels
- 5408305008 5408305008
- Applicant
-
Kimley-Horn
Deirdre Aden-Smith ( deirdre@theequitygroup.net )
(719) 448-4025 Deirdre Aden-Smith ( deirdre@theequitygroup.net )
(719) 448-4025 - EA Number
- EA2055
- File Number
- PPR2445
- Project Manager
- Lacey Dean
- Status
- Active
- Created
- 8/2/2024 4:21:56 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
1/16/2025 11:29:54 AM |
Review 1: See SF2432 for uploaded comments. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
1/16/2025 11:29:54 AM | |
Pikes Peak Regional Building Department
1/14/2025 9:19:34 AM |
My apologies that somehow my comments to the DP for Lot 3 of this development were added to the file for the final plat in EDARP. My comments on this file will be for the final plat. 1. The current address of 7337 Central Rail Pt. is too close to the address of the neighboring parcel. The address for proposed Lot 1 will be 7351 Central Rail Pt. This address needs to be shown on the plat where 7337 is currently shown. 2. The address for proposed Tract B of 755 Pacific Rail Pt. is acceptable and need to remain on the final plat. 3. Enumerations will review the mylar prior to recording for addressing, title block, and street names. An Enumerations fee of $10 will be due at the time of mylar review. 4. Enumerations will not approve any building plans submitted for this project without a copy of the final recorded plat in our records. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
1/14/2025 9:19:34 AM | |
Mountain View Electric Association, Inc.
1/13/2025 4:08:49 PM |
This property is Not within MVEA territory | 1/13/2025 4:08:49 PM | |
Cherokee Metro Dist
1/13/2025 2:31:11 PM |
ensure that cover depth from top of water and sewer pipes to proposed final grade is no less than 5'. Maintain the 10' horizontal distance for all lines with one another outside of crossings where 18" in vertical separation is required. | 1/13/2025 2:31:11 PM | |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/3/2025 10:04:48 AM |
Good morning Lacey, Please see the attached CSU 1st review of PPR2445. Three (3) comments have been requested to be addressed. Best, Matthew Alcuran, MPA| Engineering Support Specialist Sr. Utilities Development Services | Colorado Springs Utilities 1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903 O: 719-668-8261 |malcuran@csu.org |
1/3/2025 10:04:48 AM |