Project Review Comments

Back to List


Project Name
The Ridge at Lorson Ranch Fil No. 2
Description
277 Single-Family Lots & 7 tracts with public ROW 57.89 acres
Location
Parcels
5500000367 5500000367 5500000371 5500000371
Applicant
Core Engineering Group
Richard Schindler ( rich@ceg1.com )
(719) 659-7800
Richard Schindler ( rich@ceg1.com )
(719) 659-7800
File Number
ASB2430
Project Manager
Stormwater Glenn Reese
Status
Closed
Created
7/31/2024 2:43:03 PM

View: Project Documents



Review Comments (5)

Link Agency Comment
EPC Stormwater Review
3/24/2025 8:49:40 AM
Review 2: EPC DPW Stormwater comments have been resolved on the following document(s):
- Pond Certification Letter

EPC DPW Stormwater has no further comments. This ASB review process is now complete. At that time, this ASB file will be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Thank you.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
3/24/2025 8:49:40 AM
PCD Engineering Inspections
1/28/2025 5:09:00 PM
No comments for inspections 1/28/2025 5:09:00 PM
PCD Engineering Division
1/27/2025 9:49:16 AM
There are no comments relating to drainage or transportation.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
1/27/2025 9:49:16 AM
View EPC Stormwater Review
1/20/2025 3:44:16 PM
Pond Certification Letter 1/20/2025 3:44:16 PM
EPC Stormwater Review
1/20/2025 3:43:27 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Pond Certification Letter

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
1/20/2025 3:43:27 PM