Project Review Comments
- File Number
- CDR2613
- Project Name
- Widefield Water and Sanitation District Jimmy Camp Lift Station Force Main Extension CDR
- Description
- Extending an existing wastewater force main pipeline to the District's Wastewater Treatment Facility. The existing force main is a 12" diameter pipeline that conveys wastewater from the existing Jimmy Camp Lift Station (“Lift Station”) to the existing gravity sanitary sewer system. The proposed force main extension is a 16" diameter pipe that will connect to the existing 12" force main then route approximately 2.1-miles to the Wastewater Treatment Facility, allowing for wastewater to be pumped from the Lift Station directly to the Wastewater Treatment Facility
- Parcels
- 5522312004 5522312004 5527003001 5527003001
- Applicant
-
Garver
Wastewater Department Manager Mike Morgan ( mike@wwsdonline.com )
(719) 654-0323 Wastewater Department Manager Mike Morgan ( mike@wwsdonline.com )
(719) 654-0323 - File Number
- CDR2613
- Project Manager
- Stormwater Mikayla Hartford
- Status
- Active
- Created
- 7/24/2024 4:02:45 PM
View: Project Documents
| Agency | Review # | Comment | ||
|---|---|---|---|---|
|
PCD Engineering Division
10/8/2026 9:55:29 AM |
1 |
No development services engineering comments. FAE not required. Reviewed by: Joe Sandstrom, EIT, CFM Associate Engineer Department of Public Works O: 719-520-6314 M: 719-505-0516 josephsandstrom@elpasoco.com |
10/8/2026 9:55:29 AM | |
|
Mountain View Electric Association, Inc.
10/6/2026 12:58:57 PM |
1 | project not within MVEA Territory | 10/6/2026 12:58:57 PM |
EDARP