Project Review Comments

Back to List


File Number
CDR2613
Project Name
Widefield Water and Sanitation District Jimmy Camp Lift Station Force Main Extension CDR
Description
Extending an existing wastewater force main pipeline to the District's Wastewater Treatment Facility. The existing force main is a 12" diameter pipeline that conveys wastewater from the existing Jimmy Camp Lift Station (“Lift Station”) to the existing gravity sanitary sewer system. The proposed force main extension is a 16" diameter pipe that will connect to the existing 12" force main then route approximately 2.1-miles to the Wastewater Treatment Facility, allowing for wastewater to be pumped from the Lift Station directly to the Wastewater Treatment Facility
Parcels
5522312004 5522312004 5527003001 5527003001
Applicant
Garver
Wastewater Department Manager Mike Morgan ( mike@wwsdonline.com )
(719) 654-0323
Wastewater Department Manager Mike Morgan ( mike@wwsdonline.com )
(719) 654-0323
File Number
CDR2613
Project Manager
Stormwater Mikayla Hartford
Status
Active
Created
7/24/2024 4:02:45 PM

View: Project Documents



Review Comments (2)

Link Agency Review # Comment
PCD Engineering Division
10/8/2026 9:55:29 AM
1 No development services engineering comments. FAE not required.

Reviewed by:
Joe Sandstrom, EIT, CFM
Associate Engineer
Department of Public Works
O: 719-520-6314
M: 719-505-0516
josephsandstrom@elpasoco.com
10/8/2026 9:55:29 AM
Mountain View Electric Association, Inc.
10/6/2026 12:58:57 PM
1 project not within MVEA Territory 10/6/2026 12:58:57 PM