- Project Name
- 2725 Akers Dr - Addition
- Description
- Addition to existing building on Lot 1 Sedar Sub
- Location
- Parcels
- 5332414003 5332414003
- Applicant
-
Bucher Design Studio, Inc.
Nick Sallecchia ( nick@bucherdesign.com )
(719) 484-0480 Nick Sallecchia ( nick@bucherdesign.com )
(719) 484-0480 - File Number
- PPR255
- Project Manager
- Lacey Dean
- Status
- Active
- Created
- 7/19/2024 12:10:16 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC Stormwater Review
2/19/2025 11:52:46 AM |
FAE (uploaded with DS Engineering Comments) | 2/19/2025 11:52:46 AM |
View |
EPC Stormwater Review
2/19/2025 11:52:17 AM |
SWMP Checklist | 2/19/2025 11:52:17 AM |
View |
EPC Stormwater Review
2/19/2025 11:52:03 AM |
SWMP | 2/19/2025 11:52:03 AM |
View |
EPC Stormwater Review
2/19/2025 11:51:45 AM |
PBMP Applicability Form | 2/19/2025 11:51:45 AM |
View |
EPC Stormwater Review
2/19/2025 11:48:22 AM |
GEC Checklist | 2/19/2025 11:48:22 AM |
View |
EPC Stormwater Review
2/19/2025 11:47:48 AM |
GEC Plan | 2/19/2025 11:47:48 AM |
View |
EPC Stormwater Review
2/19/2025 11:46:47 AM |
Drainage Report | 2/19/2025 11:46:47 AM |
View |
EPC Stormwater Review
2/19/2025 8:36:52 AM |
ESQCP | 2/19/2025 8:36:52 AM |
View |
PCD Project Manager
2/18/2025 5:22:26 PM |
V1_Site Development Plan_comments | 2/18/2025 5:22:26 PM |
View |
PCD Project Manager
2/18/2025 5:22:10 PM |
V1_Landscape Plan drawings_comments | 2/18/2025 5:22:10 PM |
View |
PCD Project Manager
2/18/2025 5:21:49 PM |
V1_Elevation Plans_comments | 2/18/2025 5:21:49 PM |
View |
PCD Project Manager
2/18/2025 5:21:31 PM |
V1_Lighting Plan_comments | 2/18/2025 5:21:31 PM |
View |
PCD Project Manager
2/18/2025 5:20:58 PM |
V1_Letter of Intent_comments | 2/18/2025 5:20:58 PM |
PCD Project Manager
2/18/2025 5:20:28 PM |
Review 1: EPC Planning Division has comments in green text boxes on the following documents: - Letter of Intent - Lighting Plan - Elevation Drawings - Landscape Plan Drawings - Site Development Plan Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com |
2/18/2025 5:20:28 PM | |
PCD Engineering Division
2/18/2025 5:38:18 PM |
Engineering Review Ver.1 Please see engineering review comments on the following documents: -LOI_V1 Uploaded by PCD -SDP_V1 Uploaded by PCD -FDR_V1 To be uploaded by SW Dept once their review is complete. -ESQCP_V1 To be uploaded by SW Dept once their review is complete. -PBMP_V1 To be uploaded by SW Dept once their review is complete. -FAE_V1 To be uploaded by SW Dept once their review is complete. -ESQCP_V1 To be uploaded by SW Dept once their review is complete. -GEC Plan_V1 To be uploaded by SW Dept once their review is complete. EPC Road Impact fees will be due at time of building permit. See comments in LOI concerning type use. General Commerical is applicable for type use. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
2/18/2025 5:38:18 PM | |
EPC Stormwater Review
2/19/2025 11:46:19 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s): - Drainage Report - ESQCP - GEC Plan - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
2/19/2025 11:46:19 AM | |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
2/18/2025 10:29:26 AM |
Good morning Lacey, CSU has three (3) outstanding comments to be addressed: Action Item: Gas meter locations on plan view and building elevations must be shown and labeled. Action Item: Add note " Gas meters must be a minimum of 3-feet from doors, operable windows, or any vents or openings in walls." Action Item: Add note “CSU Field Engineer to determine final gas meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) with any questions.” Best, Matthew Alcuran, MPA| Engineering Support Specialist Sr. Colorado Springs Utilities | Utilities Development Services 1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903 O: 719-668-8261 |malcuran@csu.org |
2/18/2025 10:29:26 AM |
View |
EPC Health Department
2/14/2025 3:48:42 PM |
2/14/2025 3:48:42 PM | |
Pikes Peak Regional Building Department
2/13/2025 4:15:26 PM |
Enumerations has no comment or objection to this project. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
2/13/2025 4:15:26 PM | |
County Attorney - Development Review
2/13/2025 9:19:53 AM |
No comments at this time. Lori Seago Sr. County Attorney loriseago@elpasoco.com |
2/13/2025 9:19:53 AM | |
View |
Falcon Fire Protection District
2/12/2025 9:39:42 AM |
2/12/2025 9:39:42 AM |