Project Review Comments
- Project Name
- Owl Marketplace Early Grading
- Description
- Final plat replat of one (1) residential lot into five (5) commercial lots
- Location
- Parcels
- 5301001015 5301001015
- Applicant
-
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219 Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219 - EA Number
- EA21191
- File Number
- CDR247
- Project Manager
- Kylie Bagley
- Status
- Closed
- Created
- 7/12/2024 10:55:34 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
9/6/2024 2:17:14 PM |
EPC Engineering has no additional comments. The project manager will upload the approved files. Reviewed by: Hao Vo, PE haovo@elpasoco.com |
9/6/2024 2:17:14 PM | |
PCD Project Manager
9/4/2024 4:14:35 PM |
No Planning Comments | 9/4/2024 4:14:35 PM | |
View |
PCD Engineering Division
9/4/2024 4:06:13 PM |
Final Drainage Report Comments | 9/4/2024 4:06:13 PM |
View |
PCD Engineering Division
9/4/2024 4:05:32 PM |
Engineering Review Ver. 2 Engineering comments on the following documents: -Final Drainage Report -Construction Drawings NOTE: GEC Plan & Construction Drawings require PE stamp and signature on every page. All documents to be uploaded with this comment Reviewed by: Joe Sandstrom josephsandstrom@elpasoco.com Hao Vo haovo@elpasoco.com |
9/4/2024 4:05:32 PM |
EPC Stormwater Review
9/3/2024 12:22:47 PM |
Review 2: EPC DPW Stormwater comments have been resolved on the following documents: - Drainage Report - GEC Plan - GEC Checklist - SWMP Checklist EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
9/3/2024 12:22:47 PM | |
PCD Project Manager
8/19/2024 9:45:19 AM |
no comments | 8/19/2024 9:45:19 AM | |
View |
PCD Engineering Division
8/15/2024 3:33:12 PM |
V1_Grading & Erosion Control Plan_Comments | 8/15/2024 3:33:12 PM |
View |
PCD Engineering Division
8/15/2024 3:32:48 PM |
V1_Utility plans_Comments | 8/15/2024 3:32:48 PM |
View |
PCD Engineering Division
8/15/2024 3:32:27 PM |
V1_Pre-Subdivision Site Grading Acknowledgement and Right of Access Form_Comments | 8/15/2024 3:32:27 PM |
View |
PCD Engineering Division
8/15/2024 3:31:47 PM |
V1_Financial Assurance Forms_Comments | 8/15/2024 3:31:47 PM |
View |
PCD Engineering Division
8/15/2024 3:31:21 PM |
V1_Construction Drawings (Plans-Profiles)_Comments | 8/15/2024 3:31:21 PM |
View |
PCD Engineering Division
8/15/2024 3:30:57 PM |
V1_Final Drainage Report - Comments | 8/15/2024 3:30:57 PM |
PCD Engineering Division
8/15/2024 3:34:24 PM |
Review 1 - EPC Engineering Comments have been provided on the following documents: -CDs -Final Drainage Report -FAE -Utility Plans -Grading Erosion Control Plan - Pre-Subdivision Site Grading Acknowledgement and Right of Access Form All Documents are uploaded within this comment. Reviewed by: Hao Vo haovo@elpasoco.com (719) 520-7550 Joseph Sandstrom josephsandstrom@elpasoco.com Daniel Torres danieltorres@elpasoco.com |
8/15/2024 3:34:24 PM | |
Mountain View Electric Association, Inc.
8/13/2024 9:21:05 AM |
MVEA has no comment on the early grading application | 8/13/2024 9:21:05 AM | |
EPC Stormwater Review
8/13/2024 2:06:09 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...(to be uploaded with Development Services comments) - GEC Plan.............(to be uploaded with Development Services comments) Please provide the following documents listed below upon resubmittal (the planner will send an upload request). Similar to what you did with the PBMP Applicability Form, just upload a copy of the approved version of these two checklists from VR2321. - GEC Checklist - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
8/13/2024 2:06:09 PM |