Project Review Comments
- Project Name
- Ellicott School Addition 2 bldgs
- Description
- The District is going to add a Class Room building (Free Standing Structure - 120’ x 165’ +/-) in about the middle of the site. The District is also adding a Votec building (Free Standing Structure – 100’ x 120’ +/-) to the northern portion of the site. We will be connecting internal potable water & sanitary sewer service lines
- Location
- Parcels
- 2418000019 2418000019
- Applicant
-
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736 David Gorman ( daveg@mvecivil.com )
(719) 635-5736 - File Number
- ASB2429
- Project Manager
- Stormwater Glenn Reese
- Status
- Closed
- Created
- 7/11/2024 10:17:10 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
2/20/2025 3:32:14 PM |
Review 3: EPC DPW Stormwater comments have been resolved on the following document(s): - As-Built Drawings - Pond Certification Letter EPC DPW Stormwater has no further comments. At this time, this ASB file will be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
2/20/2025 3:32:14 PM | |
View |
EPC Stormwater Review
2/3/2025 10:34:52 AM |
Pond Certification Letter | 2/3/2025 10:34:52 AM |
View |
EPC Stormwater Review
2/3/2025 10:34:31 AM |
As-Built Drawings | 2/3/2025 10:34:31 AM |
EPC Stormwater Review
2/3/2025 10:34:09 AM |
Review 2: Thanks for providing all of the information that was requested. All of my comments were resolved, I just had a few minor follow-up comments on the following uploaded documents: - As-Built Drawings - Pond Certification Letter Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
2/3/2025 10:34:09 AM | |
PCD Engineering Inspections
8/28/2024 7:52:52 AM |
No comments from inspections | 8/28/2024 7:52:52 AM | |
PCD Engineering Inspections
8/21/2024 10:32:29 AM |
No commits from inspections | 8/21/2024 10:32:29 AM | |
PCD Engineering Division
8/21/2024 9:32:13 AM |
There are no comments relating to drainage or transportation. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
8/21/2024 9:32:13 AM | |
View |
EPC Stormwater Review
8/19/2024 7:16:15 AM |
Pond Certification Letter | 8/19/2024 7:16:15 AM |
View |
EPC Stormwater Review
8/19/2024 7:16:03 AM |
As-Built Drawings | 8/19/2024 7:16:03 AM |
EPC Stormwater Review
8/19/2024 7:15:43 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - As-Built Drawings - Pond Certification Letter Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
8/19/2024 7:15:43 AM |