Project Review Comments

Back to List


Project Name
Windermere SDP
Description
Location
Parcels
5329416011 5329416011
Applicant
Kimley-Horn
Noah Brehmer ( noah.brehmer@kimley-horn.com ) Noah Brehmer ( noah.brehmer@kimley-horn.com )
EA Number
EA21172
File Number
PPR2442
Project Manager
Kylie Bagley
Status
Active
Created
7/2/2024 8:41:49 AM

View: Project Documents



Review Comments (19)

Link Agency Comment
View EPC Health Department
1/12/2025 5:58:54 PM
1/12/2025 5:58:54 PM
Cherokee Metro Dist
1/9/2025 4:58:36 PM
This Review needs a tentative water and sewer plan and profile drawing/design that shows tie into Cherokee Metropolitan District's existing infrastructure to be reviewed for approval. 1/9/2025 4:58:36 PM
View PCD Engineering Division
1/6/2025 2:50:48 PM
Letter of Intent Comments 1/6/2025 2:50:48 PM
View PCD Engineering Division
1/6/2025 2:49:39 PM
PBMP Applicability Form Comments 1/6/2025 2:49:39 PM
View PCD Engineering Division
1/6/2025 2:49:05 PM
Grading & Erosion Control checklist Comments 1/6/2025 2:49:05 PM
View PCD Engineering Division
1/6/2025 2:48:39 PM
Grading & Erosion Control Plan Comments 1/6/2025 2:48:39 PM
View PCD Engineering Division
1/6/2025 2:45:46 PM
Traffic Impact Study Comments 1/6/2025 2:45:46 PM
View PCD Engineering Division
1/6/2025 2:45:14 PM
Site Development Plan Comments 1/6/2025 2:45:14 PM
View PCD Engineering Division
1/6/2025 2:44:40 PM
Financial Assurance Forms Comments 1/6/2025 2:44:40 PM
View PCD Engineering Division
1/6/2025 2:44:03 PM
Drainage Report Comments 1/6/2025 2:44:03 PM
PCD Engineering Division
1/6/2025 2:41:39 PM
Engineering Review 1:

Applicant Notes:
1. Due to the nature and volume of comments provided, additional comments may be expected with the second review.
2. Site Development Plan will not be approved until Final Plat application is submitted and approved.
3. If the water commitment letter for SP223 is uploaded and the documents are approved for that project, the signed and approved preliminary drainage report should replace the draft report that is currently attached as an appendix to the Final Drainage Report.
4. Deviations and waivers are not required for the internal driveways.

Engineering comments have been made on the following documents:
- Letter of Intent
- Site Development Plan
- Final Drainage Report
- Traffic Impact Study (Only the cover sheet was submitted)
- Financial Assurance Form

Project Manager Notes:
1. Additional review time requested for the next submittal due to the nature and volume of comments provided and an incomplete submittal of the Traffic Impact Study

Reviewed by:

Joe Sandstrom
josephsandstrom@elpasoco.com
(719)520-6314

Charlene Durham
charlenedurham@elpasoco.com
(719)520-7951
1/6/2025 2:41:39 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/31/2024 9:14:14 AM
See attached CSU 1st review with comments to be addressed.
Best,
Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
12/31/2024 9:14:14 AM
View Mountain View Electric Association, Inc.
12/31/2024 7:40:01 AM
See attached comments 12/31/2024 7:40:01 AM
EPC Stormwater Review
12/30/2024 2:12:22 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following documents (to be uploaded by Project Manager):
- Drainage Report
- GEC Plan
- GEC Checklist
- PBMP Applicability Form

Please submit the following documents with the next submittal for review:
- ESQCP
- SWMP

Reviewed by:
Christina Prete, P.E.
Stormwater Manager
719.520.6877
ChristinaPrete@elpasoco.com
12/30/2024 2:12:22 PM
View PCD Project Manager
12/23/2024 3:13:09 PM
Lighting Plan Comments 12/23/2024 3:13:09 PM
PCD Project Manager
12/23/2024 3:12:29 PM
Planning Department has outstanding comments on the following documents:

-Lighting Plan
-Site Plan (to be uploaded by Engineering)

Project manager will return from vacation on January 2, submission request will be sent out on January 2.
12/23/2024 3:12:29 PM
View Falcon Fire Protection District
12/23/2024 11:37:51 AM
12/23/2024 11:37:51 AM
Falcon School District 49
12/23/2024 8:37:45 AM
District 49 has reviewed the file PPR2442 on behalf of the Windermere project. No comments at this time. 12/23/2024 8:37:45 AM
Pikes Peak Regional Building Department
12/19/2024 11:30:43 AM
1. Townhomes do not require secondary addressing(unit numbers). Since each living space is on it’s own lot a single address will be assigned to each lot.
2. I believe only two new street names should be provided for this development. An email from Justin Annan jannan@eptc911.org; or Glenn West gwest@eptc911.org; with El Paso-Teller County E-9-1-1 Authority, reserving the street names is required to be emailed to the Enumerations department. Amy Vanderbeek Amy@pprbd.org; Brent Johnson Brent@pprbd.org; or Becky Allen BeckyA@pprbd.org
3. Once the street names are in place you are welcome to request addressing from Enumerations. Contact me directly. Amy@pprbd.org
4. If you know the locations of the irrigation meter, mail kiosk, retaining walls, mark those locations as well when submitting for addressing.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
12/19/2024 11:30:43 AM