Project Review Comments
- Project Name
- Kinch Subdivision
- Description
- Minor subdivision for 4 lots
- Location
- Parcels
- 6224000011 6224000011
- Applicant
- 
            Kinch
                
 Paul and Amy Kinch ( panakinch@msn.com )
 (719) 244-5846 Paul and Amy Kinch ( panakinch@msn.com )
 (719) 244-5846
- File Number
- ASB2425
- Project Manager
- Stormwater Glenn Reese
- Status
- Active
- Created
- 6/3/2024 3:33:23 PM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
| EPC DPW Asset Management 9/8/2025 10:01:26 AM | Please update the CAD so it’s in Colorado State Plane Central zone and include horizontal control points. Reviewed by: Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com | 9/8/2025 10:01:26 AM | |
| View | EPC Stormwater Review 11/18/2024 10:07:35 AM | Pond Certification Letter | 11/18/2024 10:07:35 AM | 
| View | EPC Stormwater Review 11/18/2024 10:07:23 AM | As-Built Drawings | 11/18/2024 10:07:23 AM | 
| EPC Stormwater Review 11/18/2024 10:06:50 AM | Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - As-Built Drawings - Pond Certification Letter Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com | 11/18/2024 10:06:50 AM | |
| PCD Engineering Inspections 10/30/2024 2:38:52 PM | No comments from Inspections. | 10/30/2024 2:38:52 PM | |
| PCD Engineering Division 10/30/2024 9:26:00 AM | There are no comments relating to drainage or transportation. Reviewed By: Lupe Packman lupepackman@elpasoco.com | 10/30/2024 9:26:00 AM | 
 EDARP
                    EDARP