Project Review Comments

Back to List


Project Name
I68 Training Facility Special Use
Description
Special use for an outdoor shooting range in the A-35 zoning district.
Location
Parcels
1300000712 1300000712
Applicant
I68 Consulting Group, LLC
Kennieth Fitzwater ( marc@i68consulting.com )
(719) 243-9168
Kennieth Fitzwater ( marc@i68consulting.com )
(719) 243-9168
EA Number
EA2462
File Number
AL249
Project Manager
Ryan Howser
Status
Closed
Created
5/17/2024 3:56:28 PM

View: Project Documents



Review Comments (14)

Link Agency Comment
Upper Black Squirrel Creek GWMD
8/8/2024 4:16:39 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 8/8/2024 4:16:39 PM
PCD Project Manager
8/8/2024 7:04:37 AM
No further comments. Special use is pending approval. 8/8/2024 7:04:37 AM
PCD Engineering Division
8/7/2024 2:30:02 PM
Engineering Review Ver.2


A TIS Memo will be required with the SDP submission.
Note engineer & stormwater drainage and grading submittals will be required with Phase #1 as part of the site development plan submission.
A driveway access permit will be required with the SDP prior to site development work. Submit application online via EDARP.

EPC Road Impact Fees are applicable with review and approval of the SDP.

Thank you.

Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
8/7/2024 2:30:02 PM
View PCD Project Manager
8/7/2024 2:20:36 PM
Review 2: PCD Planning Division has minor comments on the Letter of Intent (attached). No re-review is necessary; if you resubmit and make the changes, we will proceed to approval process for the special use. 8/7/2024 2:20:36 PM
View EPC Health Department
8/2/2024 1:57:29 PM
8/2/2024 1:57:29 PM
PCD Administrative Notice
7/11/2024 2:48:15 PM
On 7/11/2024, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (4 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $2.56. MB 7/11/2024 2:48:15 PM
View PCD Project Manager
7/10/2024 1:23:54 PM
V1: Traffic memo comments (engineering only) 7/10/2024 1:23:54 PM
View PCD Project Manager
7/10/2024 1:23:35 PM
V1: Site plan drawing comments (includes engineering) 7/10/2024 1:23:35 PM
View PCD Project Manager
7/10/2024 1:23:15 PM
V1: Letter of Intent comments (includes engineering) 7/10/2024 1:23:15 PM
PCD Project Manager
7/10/2024 1:22:44 PM
Review 1: PCD Planning Division comments have been provided (in green) on the following uploaded documents:
- Letter of Intent
- Site Plan Drawing
7/10/2024 1:22:44 PM
PCD Engineering Division
7/10/2024 8:03:02 AM
Engineering Review Ver.1

Please see engineering review comments on the following documents

LOI_V1
SDP_V1
TIS Memo_V1

A TIS Memo will be required with the SDP submission.
Note engineer & stormwater drainage and grading submittals will be required with Phase #1 as part of the site development plan submission.
A driveway access permit will be required with the SDP prior to site development work. Submit application online via EDARP.
EPC Road Impact Fees are applicable with approval of the SDP.

Thank you.

Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
7/10/2024 8:03:02 AM
EPC Stormwater Review
7/9/2024 10:28:00 AM
Review 1: EPC DPW Stormwater has no comments on this special use project. Planner: no re-review necessary.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
7/9/2024 10:28:00 AM
View Mountain View Electric Association, Inc.
7/8/2024 11:42:48 AM
See attached comments 7/8/2024 11:42:48 AM
EPC Code Enforcement
7/3/2024 10:14:45 AM
No Code Enforcement review needed. 7/3/2024 10:14:45 AM