Project Review Comments

Back to List


Project Name
Kum & Go at Main St. & Security
Description
Site development plan for new Kum & Go gas station
Location
Parcels
6511415042 6511415042
Applicant
Kum & Go LC
Krysta Houtchens ( krysta.houtchens@ees.us.com )
(970) 380-7054
Krysta Houtchens ( krysta.houtchens@ees.us.com )
(970) 380-7054
File Number
ASB2422
Project Manager
Brad Walters
Status
Active
Created
5/13/2024 8:19:08 AM

View: Project Documents



Review Comments (4)

Link Agency Comment
PCD Engineering Division
6/3/2024 1:02:26 PM
There are no comments relating to drainage or transportation.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
6/3/2024 1:02:26 PM
View EPC Stormwater Review
5/29/2024 8:50:19 AM
As-Built Construction Drawing 5/29/2024 8:50:19 AM
EPC Stormwater Review
5/28/2024 7:34:29 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document:
- As-Built Construction Drawing

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
5/28/2024 7:34:29 AM
PCD Engineering Inspections
5/21/2024 8:00:24 AM
Inspections doesn't have any commits 5/21/2024 8:00:24 AM