Project Review Comments
- Project Name
- 2850 S Meridian Rd - Special Use ALQ
- Description
- Special use for permanent occupancy to convert ADD22864 to an ALQ for permanent occupancy.
- Location
- Parcels
- 5436001012 5436001012
- Applicant
-
Sharon Brown
Sharon Brown ( sharonlynnbr@gmail.com )
(805) 340-8220 Sharon Brown ( sharonlynnbr@gmail.com )
(805) 340-8220 - File Number
- AL246
- Project Manager
- Ryan Howser
- Status
- Closed
- Created
- 5/6/2024 9:19:05 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
8/9/2024 8:38:19 AM |
EPC Engineering has no additional comments. Reviewed by: Hao Vo, PE haovo@elpasoco.com |
8/9/2024 8:38:19 AM | |
PCD Project Manager
8/8/2024 3:28:21 PM |
Review 2: PCD Planning Division has no further comments at this time. | 8/8/2024 3:28:21 PM | |
View |
EPC Health Department
7/19/2024 2:32:49 PM |
7/19/2024 2:32:49 PM | |
PCD Administrative Notice
6/5/2024 11:32:17 AM |
On 6/4/2024, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (12 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $7.68. MM | 6/5/2024 11:32:17 AM | |
PCD Engineering Division
5/30/2024 9:15:01 AM |
Review 1 - EPC Engineering Comments have been provided on the following documents: - Letter of Intent (Uploaded with this comment) - Site Plan Drawing (Uploaded with this comment) Reviewed by: Hao Vo, PE haovo@elpasoco.com |
5/30/2024 9:15:01 AM | |
View |
PCD Engineering Division
5/30/2024 9:14:34 AM |
Site Plan Drawing_comments | 5/30/2024 9:14:34 AM |
View |
PCD Engineering Division
5/30/2024 9:13:20 AM |
Letter of Intent_comments | 5/30/2024 9:13:20 AM |
PCD Project Manager
5/30/2024 7:21:31 AM |
Review 1: PCD Planning Division comments have been provided (in green) on the following uploaded documents: - Letter of Intent - Site Plan Drawing Documents will be uploaded by Engineering. |
5/30/2024 7:21:31 AM | |
EPC Stormwater Review
5/29/2024 8:14:22 AM |
Review 1: EPC DPW Stormwater does not have comments on any of the submitted documents. Thanks. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
5/29/2024 8:14:22 AM | |
View |
Widefield SD 3
5/28/2024 2:49:38 PM |
5/28/2024 2:49:38 PM | |
Ellicott Fire Protection District
5/14/2024 6:36:22 PM |
The Ellicott Fire Department has no objections to this request as discribed. Mark Stanwood Fire Marshal. | 5/14/2024 6:36:22 PM |