Project Name
RV Storage Project on Tamlin Road
Description
Expansion of the Tamlin Road RV Storage Project (PCD File No.: PPR1945) on the west side of the site. Adding additonal parking spaces for RV's and addional full-spectrum EDB to treat developed flows.
Location
Parcels
5321002001 5321002001
Applicant
JR Engineering
Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241
Glenn Ellis ( gellis@jrengineering.com )
(303) 267-6241
EA Number
EA2454
File Number
PPR2437
Project Manager
Joe Letke
Status
Active
Created
5/6/2024 9:02:33 AM

View: Project Documents



Review Comments (42)

Link Agency Comment
View PCD Engineering Division
1/28/2025 5:30:30 PM
TIS_V2 1/28/2025 5:30:30 PM
View PCD Engineering Division
1/28/2025 5:29:58 PM
GEC Plan_V2 1/28/2025 5:29:58 PM
View PCD Engineering Division
1/28/2025 5:29:36 PM
FAE_V2 1/28/2025 5:29:36 PM
View PCD Engineering Division
1/28/2025 5:28:57 PM
FDR_V2 1/28/2025 5:28:57 PM
View PCD Project Manager
1/28/2025 5:18:03 PM
-Lighting Plan 1/28/2025 5:18:03 PM
View PCD Project Manager
1/28/2025 5:17:44 PM
-Site Development Plan 1/28/2025 5:17:44 PM
View PCD Project Manager
1/28/2025 5:17:28 PM
-Letter of Intent 1/28/2025 5:17:28 PM
View EPC Stormwater Review
1/28/2025 4:52:19 PM
O&M Manual 1/28/2025 4:52:19 PM
View EPC Stormwater Review
1/28/2025 4:50:49 PM
PBMP Applicability Form 1/28/2025 4:50:49 PM
View EPC Stormwater Review
1/28/2025 4:48:30 PM
ESQCP 1/28/2025 4:48:30 PM
PCD Engineering Division
1/28/2025 5:31:03 PM
Engineering Review Ver.2

Please see engineering review comments on the following documents

ESQCP_V2 Owner signature needed.
FDR_V2
FAE_V2
GEC Plan_V2
LOI_V2
SDP_V2
TIS_V2

Note:
Road Impact fees will be due in 2025 for the expanded area at the updated rate of $447/1000sqft.
SDP PPR1945 has not paid Road Impact Fee to date for 183K sqft. This with the new rate would be $81,801 for PPR1945. This fee must still be paid.

Property in the unincorporated area of the county that receives a Land Use Approval either in a public hearing or administratively, is subject to the payment of Road Impact Fees. After December 31, 2024, the fee is paid for new residential and non-residential uses and structures and expansions of non-residential uses and structures.

Thank you

Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
1/28/2025 5:31:03 PM
PCD Project Manager
1/28/2025 8:00:20 AM
Planning has comments on the following documents:

-Site Development Plan. Please address V1's comments.
-Lighting Plan. Please contact joeletke@elpasoco.com regarding comments

Joe Letke
Planner
joeletke@elpasoco.com
1/28/2025 8:00:20 AM
EPC Stormwater Review
1/28/2025 4:53:20 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report....(to be uploaded with Development Services comments)
- ESQCP
- GEC Plan...............(to be uploaded with Development Services comments)
- O&M Manual
- PBMP Applicability Form

EPC DPW Stormwater comments have been resolved on the following document(s):
- GEC Checklist
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal (the planner will send an upload request):
- Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal only)

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
1/28/2025 4:53:20 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/27/2025 12:36:54 PM
**All Springs Utilities comments have been addressed for this proposed plot plan review application.
Best,
Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Colorado Springs Utilities | Utilities Development Services
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
1/27/2025 12:36:54 PM
Falcon Fire Protection District
1/21/2025 1:12:55 PM
No changes from the first comments on 10/24. 1/21/2025 1:12:55 PM
View Cherokee Metro Dist
1/15/2025 2:08:53 PM
When emplacing the trees and shrubbery for the site plan, the root structures cannot come within 5 feet plan view of the existing water line on the dirt access road between the proposed RV storage and the existing RV storage. The same applies to the east/west portion of the line on the south side of your proposed storage lot. I have attached a GIS snapshot to give reference. 1/15/2025 2:08:53 PM
View EPC Health Department
11/22/2024 6:20:07 PM
11/22/2024 6:20:07 PM
View County Attorney - Development Review
10/31/2024 9:25:24 AM
See edits to DMA.

Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com, 719-520-7013.
10/31/2024 9:25:24 AM
View Mountain View Electric Association, Inc.
10/24/2024 12:53:17 PM
See attached comments 10/24/2024 12:53:17 PM
View EPC Stormwater Review
10/23/2024 1:54:30 PM
SWMP Checklist 10/23/2024 1:54:30 PM
View EPC Stormwater Review
10/23/2024 1:54:12 PM
SWMP 10/23/2024 1:54:12 PM
View EPC Stormwater Review
10/23/2024 1:52:58 PM
PBMP Applicability Form 10/23/2024 1:52:58 PM
View EPC Stormwater Review
10/23/2024 1:52:36 PM
O&M Manual 10/23/2024 1:52:36 PM
View EPC Stormwater Review
10/23/2024 1:52:12 PM
GEC Checklist 10/23/2024 1:52:12 PM
View EPC Stormwater Review
10/23/2024 1:51:56 PM
GEC Plan 10/23/2024 1:51:56 PM
View EPC Stormwater Review
10/23/2024 1:51:19 PM
Drainage Report 10/23/2024 1:51:19 PM
View PCD Engineering Division
10/23/2024 11:30:50 AM
TIS_V1 10/23/2024 11:30:50 AM
View PCD Engineering Division
10/23/2024 11:18:38 AM
Soils Report_V1 10/23/2024 11:18:38 AM
View PCD Engineering Division
10/23/2024 11:16:30 AM
SDP_V1 10/23/2024 11:16:30 AM
View PCD Engineering Division
10/23/2024 11:13:21 AM
LOI_V1 10/23/2024 11:13:21 AM
View PCD Engineering Division
10/23/2024 11:12:29 AM
FAE_V1 10/23/2024 11:12:29 AM
View PCD Engineering Division
10/23/2024 11:10:41 AM
ESQCP_V1 10/23/2024 11:10:41 AM
View Cherokee Metro Dist
10/23/2024 9:51:43 AM
Cherokee Metropolitan District has a 10-foot-wide easement for a 20" Ductile Iron pipe that runs on the south side of your development. Attached is a GIS image of the 20" DIP along with said easement respective to it.

On page 3 of your "Site Plan", on the South side of the development, the proposed Austrian Black Pines will eventually infringe on this easement via their root structures and potentially will endanger our main northern line into our District.

Suggest those trees either do not go in or are moved more inward of your development.
10/23/2024 9:51:43 AM
View PCD Project Manager
10/23/2024 8:40:22 AM
10/23/2024 8:40:22 AM
PCD Engineering Division
10/23/2024 11:50:03 AM
Engineering Review Ver.1

Please see engineering review comments on the following documents

ESQCP_V1
PDR_V1 This should be a Final Drainage Report. To be uploaded by SW
FAE_V1
GEC Plan_V1 Full Pond designs are required. To be uploaded by SW
LOI_V1
SDP_V1
Soils Report_V1 Update to reflect current project area
TIS_V1

Note:
Road Impact fees will not be applicable with this submittal.

Thank you

Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
10/23/2024 11:50:03 AM
EPC Stormwater Review
10/23/2024 1:22:02 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report
- ESQCP.......................(uploaded by development services engineer)
- GEC Plan
- GEC Checklist
- O&M Manual
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal (the planner will send an upload request):
- Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal only)

Note:
Stormwater does not have comments on the Detention Maintenance Agreement, but the County Attorney may and those comments will need to be addressed.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
10/23/2024 1:22:02 PM
View PCD Project Manager
10/22/2024 11:26:30 AM
Planning has comments to the following documents:
- Site Development Plan
- Letter of Intent
- Landscape drawings
- Lighting Plan
- Grading and Erosion Control Plan
10/22/2024 11:26:30 AM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/21/2024 9:52:44 AM
Good morning Scott,
Please see the attached CSU 1st review for PPR2437. Five (5) comments have been requested.
Best,
Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
10/21/2024 9:52:44 AM
Falcon School District 49
10/17/2024 9:01:40 AM
District 49 has no comment at this time. 10/17/2024 9:01:40 AM
Colorado Springs Planning & Community Development
10/16/2024 4:14:59 PM
Are there public improvements along Tamlin through this section? 10/16/2024 4:14:59 PM
View Falcon Fire Protection District
10/11/2024 9:44:11 AM
10/11/2024 9:44:11 AM
Pikes Peak Regional Building Department
10/10/2024 1:20:28 PM
Enumerations has no comment.

Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
10/10/2024 1:20:28 PM