Project Review Comments

Back to List


Project Name
Claremont Business Park 2 Filing 1, Lot 1
Description
Location
Parcels
5408101057 5408101057
Applicant
Hammers Construction
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
Lisa Peterson ( lpeterson@hammersconstruction.com )
(719) 570-1599 x105
File Number
ASB2418
Project Manager
Brad Walters
Status
Active
Created
4/17/2024 8:22:34 AM

View: Project Documents



Review Comments (4)

Link Agency Comment
EPC Stormwater Review
9/25/2024 10:04:05 AM
Review 2: EPC DPW Stormwater comments have been resolved on the following documents:
- As-Built Construction Drawing
- BMP Certification

EPC DPW Stormwater has no further comments. Planner

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
9/25/2024 10:04:05 AM
View EPC Stormwater Review
6/24/2024 2:01:48 PM
CAD Files 6/24/2024 2:01:48 PM
View EPC Stormwater Review
6/24/2024 2:00:57 PM
As Built Construction Drawing 6/24/2024 2:00:57 PM
EPC Stormwater Review
6/24/2024 2:02:56 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As Built Construction Drawing
- CAD Files (that's the name of the file that was uploaded, but it is really the Pond Cert Letter and As-Built CDs and Calcs dated from 2021).

Per my phone call with Lisa Peterson on 6/18/2024 please do the following with the next submittal:
- Pond Certification Letter: in this file slot upload what was previously uploaded under the "CAD Files" slot to override the PPR192 docs that were accidentally uploaded as Pond Certification Letter.
- CAD Files: in this file slot upload a blank 1 page document that explains why CAD files are not being uploaded (only needs to be 1 or 2 sentences).

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
6/24/2024 2:02:56 PM