Project Review Comments
- Project Name
- Woodmen Hills Metro – Wastewater Storage Facility Site Development Plan
- Description
- Proposing a 50' x 140' storage building for the existing wastewater treatment center. The purpose of the storage building is to add additional space for equipment and vehicles needed for operational purposes of the wastewater treatment facility.
- Location
- Parcels
- 4230312001 4230312001
- Applicant
-
Matrix Design Group, Inc.
Mark Ferrarase ( mark.ferrarese@matrixdesigngroup.com ) Mark Ferrarase ( mark.ferrarese@matrixdesigngroup.com ) - File Number
- PPR2520
- Project Manager
- Joe Letke
- Status
- Active
- Created
- 4/8/2024 11:55:33 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
EPC Health Department
7/11/2025 6:37:42 PM |
7/11/2025 6:37:42 PM | |
Upper Black Squirrel Creek GWMD
7/2/2025 4:46:42 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. | 7/2/2025 4:46:42 PM | |
View |
Mountain View Electric Association, Inc.
7/2/2025 4:25:29 PM |
See attached comment | 7/2/2025 4:25:29 PM |
View |
PCD Project Manager
7/2/2025 11:24:37 AM |
-LOI | 7/2/2025 11:24:37 AM |
View |
PCD Project Manager
7/2/2025 11:24:15 AM |
-Elevation Plans | 7/2/2025 11:24:15 AM |
View |
PCD Project Manager
7/2/2025 11:23:53 AM |
-Drainage Letter | 7/2/2025 11:23:53 AM |
View |
PCD Project Manager
7/2/2025 11:23:17 AM |
-Site Development Plan | 7/2/2025 11:23:17 AM |
View |
PCD Project Manager
7/2/2025 11:23:04 AM |
-Landscape Plan | 7/2/2025 11:23:04 AM |
View |
PCD Project Manager
7/2/2025 11:22:33 AM |
-Lighting Plan | 7/2/2025 11:22:33 AM |
View |
PCD Project Manager
7/2/2025 11:22:06 AM |
-PBMP Applicability Form | 7/2/2025 11:22:06 AM |
View |
PCD Project Manager
7/2/2025 11:21:05 AM |
-Construction Drawings | 7/2/2025 11:21:05 AM |
View |
PCD Project Manager
7/2/2025 11:20:42 AM |
-Application Form | 7/2/2025 11:20:42 AM |
PCD Engineering Division
7/2/2025 8:15:59 AM |
Engineering Review 1. Engineering comments provided on the following documents (to be uploaded by project manager): - Letter of Intent - Drainage Letter - Construction Drawings - Site Development Plan Note to Applicant: Comments on Construction Drawings were provided as their are differences between the CDs and the Drainage letter, however, CDs are not required for this project and do not need to be resubmitted. Relevant comments from the CDs were added to the SDP as well and can be addressed there. Note to Project Manager: No resubmission request needed for the Construction Drawings. Reviewed by: Joe Sandstrom, EI, Associate Engineer josephsandstrom@elpasoco.com (719) 520-6314 |
7/2/2025 8:15:59 AM | |
EPC Fire and Wildfire Program Manager
6/27/2025 11:49:07 AM |
Fire comments added to the following: Construction Drawings Letter of Intent |
6/27/2025 11:49:07 AM | |
Pikes Peak Regional Building Department
6/27/2025 8:31:28 AM |
The address for the new storage building is 9501 Meridian Ranch Blvd. Please use this address when submitting plans for permit. No further comment. Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
6/27/2025 8:31:28 AM | |
PCD Project Manager
7/2/2025 11:20:20 AM |
Planning has comments on the following version 1 documents: -Application Form -Letter of Intent -Lighting Plan -Landscape Plan -Site Development Plan -Elevation Plans Joe Letke Planner joeletke@elpasoco.com |
7/2/2025 11:20:20 AM | |
EPC Stormwater Review
6/26/2025 4:49:12 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (To be uploaded by project manager): - PCM Applicability Form - Drainage Letter Reviewed by: Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com |
6/26/2025 4:49:12 PM | |
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
6/24/2025 8:13:24 AM |
The U.S. Fish and Wildlife Service has reviewed the documents associated with this Project and has no concerns with the Project resulting in impacts to species listed as endangered, threatened, or candidate or species proposed for listing. | 6/24/2025 8:13:24 AM | |
View |
Falcon Fire Protection District
6/20/2025 12:42:34 PM |
6/20/2025 12:42:34 PM | |
View |
Meridian Ranch/Meridian Service Metro Dist.
6/19/2025 3:14:12 PM |
Application Comment | 6/19/2025 3:14:12 PM |
View |
Meridian Ranch/Meridian Service Metro Dist.
6/19/2025 3:13:44 PM |
Construction Drawing Comment | 6/19/2025 3:13:44 PM |
View |
Meridian Ranch/Meridian Service Metro Dist.
6/19/2025 3:13:14 PM |
Letter of Intent Comment | 6/19/2025 3:13:14 PM |
EPC Parks Department
6/19/2025 1:29:35 PM |
El Paso County Parks Department: The 2022 El Paso County Parks Master Plan shows no impacts to existing or proposed parks, trails, or open space. No regional or urban park fees are necessary for this type of site development application, and El Paso County Parks does not object to the construction of the storage facility at this location. | 6/19/2025 1:29:35 PM | |
View |
EPC Environmental Services
6/19/2025 9:25:48 AM |
6/19/2025 9:25:48 AM |