Project Review Comments

Back to List


Project Name
Woodmoor WSD South Tank Project
Description
The project includes constructing a 0.65-million-gallon (MG) finished water storage tank at the District’s South Booster Pump Station (SBPS) site. The tank will provide redundancy to the existing 1-MG potable water storage tank and will allow the existing tank to be taken offline for maintenance. Improvements will include minor site piping to interconnect the tanks and SPBS and tank appurtenances. The proposed tank is sized to meet operational, emergency, and fire flow needs for existing customers.
Location
Parcels
7113401040 7113401040
Applicant
JVA Inc.
Richard Hood ( rhood@jvajva.com )
(303) 565-4901
Richard Hood ( rhood@jvajva.com )
(303) 565-4901
File Number
PPR2431
Project Manager
Scott Weeks
Status
Closed
Created
3/27/2024 2:46:40 PM

View: Project Documents



Review Comments (15)

Link Agency Comment
EPC Stormwater Review
10/30/2024 9:09:05 AM
Review 2: EPC DPW Stormwater comments have been resolved on the following documents:
- Letter of Intent
- PBMP Applicability Form

EPC DPW Stormwater has no further comments. Planner: no re-review necessary.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
10/30/2024 9:09:05 AM
PCD Engineering Division
10/30/2024 7:25:58 AM
Engineering Review 2:

All engineering comments have been addressed.

Reviewed by:
Joe Sandstrom
josephsandstrom@elpasoco.com
(719) 520-6314
10/30/2024 7:25:58 AM
PCD Project Manager
10/25/2024 3:08:20 PM
Staff agrees that no additional landscaping is required given amount of existing landscaping on and off site to visually lessen the impact of the tower on surrounding neighborhoods.

All planning comments have been addressed.
10/25/2024 3:08:20 PM
View EPC Health Department
10/13/2024 1:12:49 PM
10/13/2024 1:12:49 PM
Tri-Lakes-Monument Fire Protection District
10/1/2024 11:16:51 AM
The fire department has no comment on this project 10/1/2024 11:16:51 AM
View PCD Project Manager
9/24/2024 4:10:26 PM
9/24/2024 4:10:26 PM
View PCD Project Manager
9/24/2024 4:09:28 PM
9/24/2024 4:09:28 PM
View PCD Project Manager
9/24/2024 4:08:56 PM
9/24/2024 4:08:56 PM
View PCD Project Manager
9/24/2024 4:07:58 PM
Please see planning comments on the following documents:
- Site Development Plan
- Letter of Intent
- Landscape plan drawings
- Lighting Plan
9/24/2024 4:07:58 PM
View EPC Stormwater Review
9/24/2024 2:08:40 PM
PBMP Applicability Form 9/24/2024 2:08:40 PM
EPC Stormwater Review
9/24/2024 2:07:08 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Letter of Intent.......(to be uploaded by Planner)
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
9/24/2024 2:07:08 PM
View Mountain View Electric Association, Inc.
9/24/2024 1:45:54 PM
See attached comments 9/24/2024 1:45:54 PM
PCD Engineering Division
9/23/2024 12:50:10 PM
Engineering Review 1:

Engineering comments have been made on the following documents (to be uploaded by Planner):
- Letter of Intent
- Site Development Plan

Reviewed by:
Joe Sandstrom
Email: josephsandstrom@elpasoco.com
Office: (719) 520-6314
9/23/2024 12:50:10 PM
Pikes Peak Regional Building Department
9/23/2024 8:32:15 AM
Enumerations has the following comments:

1. Enumerations has assigned the address of 234 Jack Boot Way for this new storage tank. Building plans submitted for permitting should use this address.

Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
9/23/2024 8:32:15 AM
Woodmoor Water and Sanitation District
9/16/2024 8:08:03 AM
No comments at this time 9/16/2024 8:08:03 AM