Project Review Comments
- Project Name
- Latigo Trails Fil. No 10
- Description
- Latigo Trails Preliminary Plan (SP-01-011) was previously approved with significant constraints depicted. CSG and USFWS review required. No expiration on prelim plan very rare.
- Location
- Parcels
- 4200000352 4200000352
- Applicant
-
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219 Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219 - EA Number
- EA20184
- File Number
- SF2421
- Project Manager
- Ashlyn Mathy
- Status
- Active
- Created
- 2/29/2024 1:37:11 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
Colorado Division of Water Resources
12/11/2024 3:41:31 PM |
12/11/2024 3:41:31 PM | |
County Attorney - Water
12/6/2024 1:27:01 PM |
The letter dated October 9, 2024, from the Colorado Division of Water Resources requests additional information before they can make a finding of sufficiency. Please follow up on those items. | 12/6/2024 1:27:01 PM | |
View |
County Attorney - Development Review
12/6/2024 1:17:18 PM |
See attached edits to SIA. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com, 719-520-7013. |
12/6/2024 1:17:18 PM |
View |
County Attorney - Development Review
12/6/2024 1:16:50 PM |
See attached edits to DMA. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com, 719-520-7013. |
12/6/2024 1:16:50 PM |
View |
PCD Engineering Division
12/4/2024 8:42:00 PM |
FAE comments | 12/4/2024 8:42:00 PM |
View |
PCD Engineering Division
12/4/2024 8:41:33 PM |
SWMP checklist comments | 12/4/2024 8:41:33 PM |
View |
PCD Engineering Division
12/4/2024 8:41:00 PM |
SWMP comments | 12/4/2024 8:41:00 PM |
View |
PCD Engineering Division
12/4/2024 8:39:58 PM |
Detention Maintenance Agreement comments | 12/4/2024 8:39:58 PM |
View |
PCD Engineering Division
12/4/2024 8:39:26 PM |
GEC Plan comments | 12/4/2024 8:39:26 PM |
View |
PCD Engineering Division
12/5/2024 2:46:47 PM |
Construction Drawings (CDs) comments | 12/5/2024 2:46:47 PM |
View |
PCD Engineering Division
12/5/2024 2:45:54 PM |
Final Drainage Report comments | 12/5/2024 2:45:54 PM |
View |
PCD Engineering Division
12/5/2024 2:47:06 PM |
TIS comments | 12/5/2024 2:47:06 PM |
View |
PCD Engineering Division
12/4/2024 8:33:54 PM |
Final Plat w/ engineering and planning comments | 12/4/2024 8:33:54 PM |
View |
PCD Project Manager
12/4/2024 2:17:48 PM |
Plat comments | 12/4/2024 2:17:48 PM |
View |
PCD Project Manager
12/4/2024 2:17:19 PM |
LOI comments | 12/4/2024 2:17:19 PM |
PCD Project Manager
12/4/2024 2:16:31 PM |
Planning comments are on the LOI and Plat. Engineering and Stormwater documents will be uploaded by Engineering staff at a later date. -Ashlyn Mathy |
12/4/2024 2:16:31 PM | |
View |
Falcon Fire Protection District
12/4/2024 1:14:19 PM |
12/4/2024 1:14:19 PM | |
EPC Stormwater Review
12/2/2024 3:20:13 PM |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - Drainage Report - GEC Plan - Private Detention Basin / Stormwater Quality BMP Maintenance Agreement - SWMP - SWMP Checklist Unresolved previous comment: please provide the following documents upon resubmittal (the planner will send an upload request): - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal only) EPC DPW Stormwater comments have been resolved on the following documents: - CDs - ESQCP - FAE - Final Plat - GEC Checklist - O&M Manual - PBMP Applicability Form All EPC DPW Stormwater comments have been addressed. Please address any remaining outstanding comments from other agencies and then upload the final signed/stamped and dated documents for approval. SW Docs that still need to be signed include: - ESQCP Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719.675.2654 GlennReese@elpasoco.com |
12/2/2024 3:20:13 PM | |
View |
Meridian Ranch/Meridian Service Metro Dist.
11/25/2024 11:45:45 AM |
MSMD Road Plan Review - Show steel sleeves in storm drain profiles. show proper watermain location in typical street section. | 11/25/2024 11:45:45 AM |
View |
Meridian Ranch/Meridian Service Metro Dist.
11/25/2024 11:44:12 AM |
MSMD Water Plan Review - Address comment regarding fire hydrant details and typical locations. Verify with FFPD hydrant spacings. | 11/25/2024 11:44:12 AM |
View |
Meridian Ranch/Meridian Service Metro Dist.
11/25/2024 11:42:29 AM |
MSMD Final Plat Review - Add signature block for MSMD | 11/25/2024 11:42:29 AM |
PCD Engineering Division
12/4/2024 8:36:56 PM |
Review 2 comments on the following documents will be uploaded: - Final Plat with engineering comments - TIS - Final Drainage Report - CDs - GEC Plan - Detention Maintenance Agreement - SWMP - SWMP Checklist - FAE reviewed by: Daniel Torres danieltorres@elpasoco.com 719-520-6305 & Joe Sandstrom josephsandtrom@elpasoco.com |
12/4/2024 8:36:56 PM | |
View |
EPC Health Department
11/8/2024 10:28:13 AM |
11/8/2024 10:28:13 AM | |
View |
EPC Health Department
11/1/2024 3:38:39 PM |
11/1/2024 3:38:39 PM | |
US Postal Service
10/30/2024 10:48:55 AM |
Please contact Angela Connell, angela.d.connell@usps.gov – (Peyton/Falcon) directly to review this development for mail service. To establish mail delivery and kiosk locations an appointment will be required with USPS to determine final locations. Information required for this establishment include proposed locations, type of mail receptacle, final plat with addresses, type of development (residential/commercial) and date of first occupancy. | 10/30/2024 10:48:55 AM | |
Falcon School District 49
10/15/2024 2:49:56 PM |
District 49 has no comments or concerns with this development | 10/15/2024 2:49:56 PM | |
Black Forest Land Use Committee
10/14/2024 7:39:46 PM |
The Black Forest Land Use Committee has no objections to this proposal. | 10/14/2024 7:39:46 PM | |
View |
PCD Project Manager
10/11/2024 2:55:18 PM |
GEC Checklist comments | 10/11/2024 2:55:18 PM |
View |
PCD Engineering Division
10/11/2024 11:05:06 AM |
Detention Maintenance Agreement-Comments | 10/11/2024 11:05:06 AM |
View |
PCD Engineering Division
10/11/2024 11:01:01 AM |
GEC-Comments | 10/11/2024 11:01:01 AM |
View |
PCD Engineering Division
10/11/2024 11:00:24 AM |
Financial Assurance Forms_comments | 10/11/2024 11:00:24 AM |
View |
PCD Engineering Division
10/11/2024 10:58:40 AM |
Final Plat-Comments | 10/11/2024 10:58:40 AM |
View |
PCD Engineering Division
10/11/2024 10:58:07 AM |
CD_comments | 10/11/2024 10:58:07 AM |
View |
PCD Engineering Division
10/11/2024 10:57:12 AM |
FDR_comments | 10/11/2024 10:57:12 AM |
View |
PCD Engineering Division
10/11/2024 11:03:39 AM |
Review 1 - EPC Engineering Comments have been provided on the following documents: - TIS - Final Drainage Report - Final Plat - CD -GEC -Detention Maintenance Agreement Hao Vo, PE haovo@elpasoco.com |
10/11/2024 11:03:39 AM |
Meadow Lake Airport Association
10/10/2024 8:08:52 PM |
This sub-division appears to be outside the Part 77 Airport Influence Area of Meadow Lake Airport. | 10/10/2024 8:08:52 PM | |
View |
Parks Advisory Board
10/10/2024 4:03:45 PM |
El Paso County Parks and Community Services Department, Final Comments - Please See Attached Documentation (Administratively approved on 10/10/2024 due to cancelled Park Advisory Board) | 10/10/2024 4:03:45 PM |
View |
PCD Project Manager
10/10/2024 3:40:10 PM |
v1_SWMP checklist | 10/10/2024 3:40:10 PM |
View |
PCD Project Manager
10/10/2024 3:39:50 PM |
v1_Storm Water Management Plan (SWMP) | 10/10/2024 3:39:50 PM |
View |
PCD Project Manager
10/10/2024 3:39:25 PM |
v1_PDBBMP Operations & Maintenance Manual | 10/10/2024 3:39:25 PM |
View |
PCD Project Manager
10/10/2024 3:39:06 PM |
v1_PBMP Applicability Form | 10/10/2024 3:39:06 PM |
View |
PCD Project Manager
10/10/2024 3:38:46 PM |
v1_Erosion and Stormwater Quality Control Permit (ESQCP) | 10/10/2024 3:38:46 PM |
View |
PCD Project Manager
10/10/2024 3:37:33 PM |
v1_Water Supply Information Summary | 10/10/2024 3:37:33 PM |
View |
PCD Project Manager
10/10/2024 3:37:02 PM |
v1_Water Supply Information Summary | 10/10/2024 3:37:02 PM |
View |
PCD Project Manager
10/10/2024 3:35:32 PM |
v1_Water Resources Report | 10/10/2024 3:35:32 PM |
View |
PCD Project Manager
10/10/2024 3:35:14 PM |
v1_Letter of Intent | 10/10/2024 3:35:14 PM |
View |
PCD Project Manager
10/10/2024 3:34:52 PM |
v1_Impact Identification Statement | 10/10/2024 3:34:52 PM |
View |
PCD Project Manager
10/10/2024 3:34:34 PM |
v1_Fire Protection Report Please clarify if hydrants or cisterns will be used at this filing |
10/10/2024 3:34:34 PM |
View |
PCD Project Manager
10/10/2024 3:33:51 PM |
v1_ApplicationPetition Form | 10/10/2024 3:33:51 PM |
PCD Project Manager
10/10/2024 3:40:48 PM |
Due to the volume and complexity of comments, subsequent reviews may have additional comments and requested revisions. Engineering documents and the final plat will be uploaded by the Engineer on this project. -Ashlyn Mathy |
10/10/2024 3:40:48 PM | |
Colorado Springs Airport Advisory Commission
10/10/2024 10:19:12 AM |
No Comments - Outside of Airport Overlay | 10/10/2024 10:19:12 AM | |
Colorado Springs Airport Advisory Commission
10/10/2024 10:17:59 AM |
No Comments - Outside of Airport Overlay | 10/10/2024 10:17:59 AM | |
EPC Stormwater Review
10/10/2024 8:11:06 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - CDs - Drainage Report - ESQCP - Final Plat - FAE - GEC Plan - GEC Checklist - PBMP Applicability Form - O&M Manual - Private Detention Basin / Stormwater Quality BMP Maintenance Agreement - SWMP - SWMP Checklist Please provide the following documents upon resubmittal (the planner will send an upload request): - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal only) Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
10/10/2024 8:11:06 AM | |
EPC Stormwater Review
10/10/2024 8:10:25 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - CDs - Drainage Report - ESQCP - Final Plat - FAE - GEC Plan - GEC Checklist - PBMP Applicability Form - O&M Manual - Private Detention Basin / Stormwater Quality BMP Maintenance Agreement - SWMP - SWMP Checklist Please provide the following documents upon resubmittal (the planner will send an upload request): - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal only) Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
10/10/2024 8:10:25 AM | |
Colorado Division of Water Resources
10/9/2024 3:44:56 PM |
Duplicate entry | 10/9/2024 3:44:56 PM | |
View |
Colorado Division of Water Resources
10/9/2024 3:44:13 PM |
10/9/2024 3:44:13 PM | |
Colorado Geological Survey
10/9/2024 12:27:36 PM |
Note 22 of the final plat (Drexel, Barrell & Co., August 29, 2024) references CTL Thompson’s August 3, 2021 report and states, “There are no geological hazards precluding the development.” The referral documents, however, now include a report prepared by Entech Engineering, Inc., dated May 7, 2024, for Filing No. 10. This report should be referenced in the final plat. As stated in Entech’s report (page 8), “The constraints affecting development will be those associated with the artificial fill, potentially expansive soils, shallow bedrock, potentially seasonal shallow groundwater and seasonally shallow groundwater areas, and the potential for elevated radon levels…” and on page 7, “Most of the drainages and ponds on the site area located within drainage easements and will be avoided by the proposed residential development.” Provided the hazards/constraints with mitigation measures are included in the final plat, CGS has no objection to approval. Submitted 10/9/2024 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu) |
10/9/2024 12:27:36 PM | |
Colorado Geological Survey
10/9/2024 12:25:43 PM |
Note 22 of the final plat (Drexel, Barrell & Co., August 29, 2024) references CTL Thompson’s August 3, 2021 report and states, “There are no geological hazards precluding the development.” The referral documents, however, now includes a report prepared by Entech Engineering, Inc., dated May 7, 2024 for Filing No. 10. This report should be referenced in the final plat. As stated in Entech’s report (page 8), “The constraints affecting development will be those associated with the artificial fill, potentially expansive soils, shallow bedrock, potentially seasonal shallow groundwater and seasonally shallow groundwater areas, and the potential for elevated radon levels…” and on page 7, “Most of the drainages and ponds on the site area located within drainage easements and will be avoided by the proposed residential development.” Provided the hazards/constraints with mitigation measures are included in the final plat, CGS has no objection to approval. Submitted 10/9/2024 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu) |
10/9/2024 12:25:43 PM | |
EPC Stormwater Review
10/9/2024 4:41:29 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the Project Manager): - CDs - Drainage Report - ESQCP - Final Plat - FAE - GEC Plan - GEC Checklist - PBMP Applicability Form - O&M Manual - Private Detention Basin / Stormwater Quality BMP Maintenance Agreement - SWMP - SWMP Checklist Please provide the following documents upon resubmittal (the planner will send an upload request): - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal only) Reviewed by: Mikayla Hartford Stormwater Engineer I 719.339.5053 MikaylaHartford@elpasoco.com |
10/9/2024 4:41:29 PM | |
View |
Mountain View Electric Association, Inc.
10/8/2024 10:54:54 AM |
See attached comments | 10/8/2024 10:54:54 AM |
View |
Mountain View Electric Association, Inc.
10/8/2024 10:50:58 AM |
See attached comments | 10/8/2024 10:50:58 AM |
View |
County Attorney - Development Review
10/8/2024 9:42:14 AM |
Please see attached DMA. Reviewed by: Erika Keech, Senior County Attorney, erikakeech2@elpasoco.com, 719-520-7013 |
10/8/2024 9:42:14 AM |
View |
Meridian Ranch/Meridian Service Metro Dist.
10/4/2024 9:23:24 AM |
10/4/2024 9:23:24 AM | |
View |
Meridian Ranch/Meridian Service Metro Dist.
10/4/2024 9:23:02 AM |
10/4/2024 9:23:02 AM | |
View |
Meridian Ranch/Meridian Service Metro Dist.
10/4/2024 9:22:36 AM |
10/4/2024 9:22:36 AM | |
View |
Meridian Ranch/Meridian Service Metro Dist.
10/4/2024 9:22:07 AM |
10/4/2024 9:22:07 AM | |
Colorado Parks and Wildlife
10/2/2024 7:38:10 PM |
Colorado Parks and Wildlife (CPW) has reviewed the plans for the Latigo Trails Fil. No 10 in El Paso County. CPW is familiar with the site, and has commented on the overall Latigo Trails project area in the past. CPW would defer to those previous comments. Based on the location and proposed actions, CPW anticipates that this project's impacts on the wildlife resource would be negligible if our previous comments are considered. We appreciate being allowed to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us |
10/2/2024 7:38:10 PM | |
Colorado Parks and Wildlife
10/2/2024 7:36:26 PM |
Colorado Parks and Wildlife (CPW) has reviewed the plans for the Latigo Trails Fil. No 10 in El Paso County. Colorado Parks and Wildlife (CPW) is familiar with the site, and has commented on the overall Latigo Trails project area in the past. CPW would defer to those previous comments. Based on the location and proposed actions, CPW anticipates that this project's impacts on the wildlife resource would be negligible if our previous comments are considered. We appreciate being allowed to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us |
10/2/2024 7:36:26 PM | |
Pikes Peak Regional Building Department
10/2/2024 12:49:55 PM |
1. Provide a large scale copy of the overall site plan of the area, so that I am not piecing these filings together. 2. Standard Final Plat comments: a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block. b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
10/2/2024 12:49:55 PM | |
View |
Falcon Fire Protection District
10/1/2024 7:52:10 AM |
10/1/2024 7:52:10 AM | |
View |
Falcon Fire Protection District
10/1/2024 7:49:05 AM |
10/1/2024 7:49:05 AM | |
View |
Falcon Fire Protection District
9/30/2024 12:35:22 PM |
9/30/2024 12:35:22 PM | |
Pikes Peak Regional Building Department
9/30/2024 8:41:12 AM |
SUBMITTED TOO MANY TIMES | 9/30/2024 8:41:12 AM | |
View |
EPC Parks Department
9/27/2024 3:20:58 PM |
El Paso County Parks and Community Services Department, Preliminary Comments - Please See Attached Documentation (To be presented to the Park Advisory Board for endorsement on October 9, 2024) | 9/27/2024 3:20:58 PM |
View |
EPC Parks Department
9/27/2024 3:19:30 PM |
El Paso County Parks and Community Services Department, Preliminary Comments - Please See Attached Documentation (To be presented to the Park Advisory Board for endorsement on October 9, 2024) | 9/27/2024 3:19:30 PM |
View |
EPC Environmental Services
9/26/2024 1:16:17 PM |
9/26/2024 1:16:17 PM | |
County Attorney - Water
9/25/2024 9:18:06 AM |
County Attorney’s Office will review for water sufficiency following receipt of findings from the Colorado Division of Water Resources. Thank you. | 9/25/2024 9:18:06 AM | |
Colorado State Forest Service
9/25/2024 8:19:51 AM |
The primary wildland fuel type for this proposal is grassland with scattered trees having a low to moderate wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. | 9/25/2024 8:19:51 AM | |
Colorado State Forest Service
9/25/2024 8:18:53 AM |
The primary wildland fuel type for this proposal is grassland with scattered trees having a low to moderate wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. | 9/25/2024 8:18:53 AM | |
Colorado State Forest Service
9/25/2024 8:18:02 AM |
The primary wildland fuel type for this proposal is grassland with scattered trees having a low to moderate wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. | 9/25/2024 8:18:02 AM | |
Colorado State Forest Service
9/25/2024 8:16:53 AM |
The primary wildland fuel type for this proposal is grassland with scattered trees having a low to moderate wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. | 9/25/2024 8:16:53 AM | |
Black Forest Fire Protection District
9/25/2024 5:56:15 AM |
This project does not fall with the boundaries of BFFRPD (Black Forest Fire Rescue Protection District). Refer to Falcon Fire Department | 9/25/2024 5:56:15 AM | |
Black Forest Fire Protection District
9/25/2024 5:55:47 AM |
This project does not fall with the boundaries of BFFRPD (Black Forest Fire Rescue Protection District). Refer to Falcon Fire Department | 9/25/2024 5:55:47 AM | |
Black Forest Fire Protection District
9/25/2024 5:55:23 AM |
This project does not fall with the boundaries of BFFRPD (Black Forest Fire Rescue Protection District). Refer to Falcon Fire Department | 9/25/2024 5:55:23 AM | |
Black Forest Fire Protection District
9/25/2024 5:54:55 AM |
This project does not fall with the boundaries of BFFRPD (Black Forest Fire Rescue Protection District). Refer to Falcon Fire Department | 9/25/2024 5:54:55 AM | |
Black Forest Fire Protection District
9/24/2024 10:39:08 PM |
This project does not fall with the boundaries of BFFRPD (Black Forest Fire Rescue Protection District). Refer to Falcon Fire Department | 9/24/2024 10:39:08 PM | |
Colorado Springs Airport Advisory Commission
9/21/2024 8:55:42 AM |
Airport has no comments this parcel is outside the Airport Overlay. | 9/21/2024 8:55:42 AM | |
View |
El Paso County Conservation Dist
9/20/2024 3:14:26 PM |
Please see attached .PDF for brief comments. Thanks! | 9/20/2024 3:14:26 PM |
911 Authority - El Paso/Teller County
9/20/2024 10:27:04 AM |
Comments for E911 as follows: Conestoga Trail South – Logical extension of existing road Buffalo River Trail – Logical extension of existing road. Irish Hunter Trl is an existing road leading into Filing 9 of this development. I do not see the connection from Filing 9 down to Filing 10, is this intended to curve down into this filing? Is there a site plan that depicts this layout. Thank you Justin |
9/20/2024 10:27:04 AM | |
911 Authority - El Paso/Teller County
9/20/2024 10:23:43 AM |
Comments for E911 as follows: Conestoga Trail South – Logical extension of existing road Buffalo River Trail – Logical extension of existing road. Irish Hunter Trl is an existing road leading into Filing 9 of this development. I do not see the connection from Filing 9 down to Filing 10, is this intended to curve down into this filing? Is there a site plan that depicts this layout. Thank you Justin |
9/20/2024 10:23:43 AM | |
911 Authority - El Paso/Teller County
9/20/2024 10:22:25 AM |
Comments for E911 as follows: Conestoga Trail South – Logical extension of existing road Buffalo River Trail – Logical extension of existing road. Irish Hunter Trl is an existing road leading into Filing 9 of this development. I do not see the connection from Filing 9 down to Filing 10, is this intended to curve down into this filing? Is there a site plan that depicts this layout. Thank you Justin |
9/20/2024 10:22:25 AM | |
911 Authority - El Paso/Teller County
9/20/2024 10:19:33 AM |
Comments for E911 as follows: Conestoga Trail South – Logical extension of existing road Buffalo River Trail – Logical extension of existing road. Irish Hunter Trl is an existing road leading into Filing 9 of this development. I do not see the connection from Filing 9 down to Filing 10, is this intended to curve down into this filing? Is there a site plan that depicts this layout. Thank you Justin |
9/20/2024 10:19:33 AM | |
US Postal Service
9/20/2024 8:33:57 AM |
Please contact Angela Connell, angela.d.connell@usps.gov – (Peyton/Falcon) directly to review this development for mail service. To establish mail delivery and kiosk locations an appointment will be required with USPS to determine final locations. Information required for this establishment include proposed locations, type of mail receptacle, final plat with addresses, type of development (residential/commercial) and date of first occupancy. | 9/20/2024 8:33:57 AM | |
RBD Floodplain
9/19/2024 3:30:18 PM |
no comment | 9/19/2024 3:30:18 PM | |
Road Impact Fee Administrator
9/19/2024 3:07:17 PM |
It does not appear that there is anything to review for the Road Impact Fee. Please contact me directly if this is not the case. victoriachavez@elpasoco.com |
9/19/2024 3:07:17 PM | |
Road Impact Fee Administrator
9/19/2024 3:06:09 PM |
It does not appear that there is anything to review for the Road Impact Fee. Please contact me directly if this is not the case. victoriachavez@elpasoco.com |
9/19/2024 3:06:09 PM | |
Road Impact Fee Administrator
9/19/2024 3:04:07 PM |
It does not appear there is anything to review for the Road Impact Fee program. Please contact me directly if this is not the case. Victoriachavez@elpasoco.com |
9/19/2024 3:04:07 PM |