Project Review Comments
- Project Name
- Fountain Valley Salvation Army CDR & Site Plan
- Description
- Applicant plans to pave a parking lot and build a stormwater feature. The applicant is not changing any lighting, landscaping, or use.
- Location
- Parcels
- 6511101016 6511101016
- Applicant
-
R&R Engineers - Surveyors, Inc.
Tim Stackhouse ( tstackhouse@rrengineers.com )
(303) 753-6730 Tim Stackhouse ( tstackhouse@rrengineers.com )
(303) 753-6730 - File Number
- CDR242
- Project Manager
- Bret Dilts
- Status
- Active
- Created
- 1/2/2024 8:21:49 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Engineering Division
12/19/2024 1:35:04 PM |
Engineering Review has comments on - Drainage Report Review by: Bret Dilts, PE bretdilts@elpasoco.com 719-520-6864 |
12/19/2024 1:35:04 PM | |
View |
EPC Stormwater Review
12/19/2024 11:32:22 AM |
GEC Plan | 12/19/2024 11:32:22 AM |
View |
EPC Stormwater Review
12/19/2024 11:30:43 AM |
Drainage Report | 12/19/2024 11:30:43 AM |
EPC Stormwater Review
12/19/2024 11:33:29 AM |
Review 4: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - GEC Plan EPC DPW Stormwater comments have been resolved on the following documents: - O&M Manual. SW Docs that still need to be signed and resubmitted include: - GEC Plan - GEC Checklist - PBMP Applicability Form - SDP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
12/19/2024 11:33:29 AM | |
View |
PCD Engineering Division
12/2/2024 9:19:55 AM |
O&M Manual | 12/2/2024 9:19:55 AM |
View |
PCD Engineering Division
12/2/2024 9:19:36 AM |
GEC Plan | 12/2/2024 9:19:36 AM |
View |
PCD Engineering Division
12/2/2024 9:18:55 AM |
Final Drainage Report | 12/2/2024 9:18:55 AM |
PCD Engineering Division
12/2/2024 9:20:11 AM |
Review 3 Engineering Comments have been resolved on the following documents: - Site Development Plan - Final Drainage Report - Financial Assurance Forms - Grading and Erosion Control Plan Stormwater comments remain on the following documents - Final Drainage Report - GEC Plan - O&M Manual Engineering Review by Bret Dilts, PE bretdilts@elpasoco.com 719-520-6864 Stormwater review by Glenn Reese, PE 719-675-2654 |
12/2/2024 9:20:11 AM | |
View |
EPC Stormwater Review
11/21/2024 5:17:02 PM |
O&M Manual | 11/21/2024 5:17:02 PM |
View |
EPC Stormwater Review
11/21/2024 5:11:22 PM |
GEC Plan | 11/21/2024 5:11:22 PM |
View |
EPC Stormwater Review
11/21/2024 5:08:07 PM |
Drainage Report | 11/21/2024 5:08:07 PM |
EPC Stormwater Review
11/21/2024 9:21:06 AM |
Review 3: Thanks for providing comment responses, very helpful! EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - GEC Plan - O&M Manual EPC DPW Stormwater comments have been resolved on the following documents: - GEC Checklist - FAE - PBMP Applicability Form - Site Plan - SWMP SW Docs that still need to be signed and resubmitted include: - GEC Plan - GEC Checklist - PBMP Applicability Form - SDP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
11/21/2024 9:21:06 AM | |
View |
PCD Engineering Division
9/26/2024 5:47:45 PM |
FDR_V2 | 9/26/2024 5:47:45 PM |
View |
PCD Engineering Division
9/26/2024 5:47:18 PM |
FAE_V2 | 9/26/2024 5:47:18 PM |
View |
PCD Engineering Division
9/26/2024 5:46:19 PM |
GEC PLAN_V2 | 9/26/2024 5:46:19 PM |
View |
PCD Engineering Division
9/26/2024 5:45:23 PM |
SDP_V2 | 9/26/2024 5:45:23 PM |
PCD Engineering Division
9/26/2024 5:49:15 PM |
Engineering Review Ver.2 Please see engineering comments on the following documents Site Dev Plan_V2 GEC Plan_V2 FAE_V2 FDR_V2 EPC Road Impact Fees are not applicable. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
9/26/2024 5:49:15 PM | |
PCD Project Manager
9/26/2024 7:58:54 AM |
Planning has no comments. Joe Letke Planner 719-520-7964 |
9/26/2024 7:58:54 AM | |
View |
EPC Stormwater Review
9/24/2024 1:33:02 PM |
SWMP | 9/24/2024 1:33:02 PM |
View |
EPC Stormwater Review
9/24/2024 1:32:38 PM |
PBMP Applicability Form | 9/24/2024 1:32:38 PM |
View |
EPC Stormwater Review
9/24/2024 1:32:23 PM |
O&M Manual | 9/24/2024 1:32:23 PM |
View |
EPC Stormwater Review
9/24/2024 1:32:03 PM |
GEC Checklist | 9/24/2024 1:32:03 PM |
EPC Stormwater Review
9/24/2024 1:20:03 PM |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report....(to be uploaded with Development Services comments) - FAE........................(to be uploaded with Development Services comments) - GEC Plan...............(to be uploaded with Development Services comments) - GEC Checklist - O&M Manual - PBMP Applicability Form - Site Plan...............(to be uploaded with Development Services comments) - SWMP EPC DPW Stormwater comments have been resolved on the following documents: - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
9/24/2024 1:20:03 PM | |
View |
PCD Project Manager
3/18/2024 4:36:40 PM |
-GEC Plan | 3/18/2024 4:36:40 PM |
View |
PCD Project Manager
3/18/2024 4:34:37 PM |
-Financial Assurance Estimate | 3/18/2024 4:34:37 PM |
View |
PCD Project Manager
3/18/2024 4:33:26 PM |
-Drainage Report | 3/18/2024 4:33:26 PM |
View |
PCD Project Manager
3/18/2024 4:31:42 PM |
-Site Plan | 3/18/2024 4:31:42 PM |
View |
PCD Project Manager
3/18/2024 4:31:12 PM |
-Letter of Intent | 3/18/2024 4:31:12 PM |
PCD Project Manager
3/18/2024 4:29:26 PM |
Planning has comments on the following documents: -Letter of Intent -Site Plan Joe Letke Planner II 719-520-7964 |
3/18/2024 4:29:26 PM | |
View |
EPC Stormwater Review
3/18/2024 4:23:07 PM |
SWMP Checklist | 3/18/2024 4:23:07 PM |
View |
EPC Stormwater Review
3/18/2024 4:22:26 PM |
SWMP | 3/18/2024 4:22:26 PM |
View |
EPC Stormwater Review
3/18/2024 4:19:44 PM |
PBMP Applicability Form | 3/18/2024 4:19:44 PM |
View |
EPC Stormwater Review
3/18/2024 4:19:28 PM |
O&M Manual | 3/18/2024 4:19:28 PM |
View |
EPC Stormwater Review
3/18/2024 4:19:06 PM |
GEC Checklist | 3/18/2024 4:19:06 PM |
EPC Stormwater Review
3/18/2024 4:16:52 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report....(to be uploaded with Development Services comments) - FAE........................(to be uploaded with Development Services comments) - GEC Plan...............(to be uploaded with Development Services comments) - GEC Checklist - O&M Manual - PBMP Applicability Form - Site Plan...............(to be uploaded with Development Services comments) - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
3/18/2024 4:16:52 PM | |
PCD Engineering Division
3/18/2024 8:46:14 AM |
Engineering Review Ver.1 Please see engineering comments on the following documents PBMP Form_V1 Site Dev Plan_V1 GEC Plan_V1 LOI_V1 FAE_V1 FDR_V1 A to be recorded Right of Way license Maintenance Agreement will be required for the sidewalk chase. A to be recorded drainage easement and maintenance agreement will be required for the stormwater pipe traversing 406 LETA Dr. A work in the ROW permit and PRECON meeting will be required. Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
3/18/2024 8:46:14 AM | |
EPC Parks Department
3/1/2024 9:47:39 AM |
El Paso County Parks and Community Services has reviewed the construction documents and site development plan for the Fountain Valley Salvation Army parking lot improvement project and has found no impacts to existing or proposed EPC Parks parks, trails, or open space facilities. No additional comments or recommendations are required for this application. | 3/1/2024 9:47:39 AM | |
Security Fire Protection District
2/29/2024 9:44:18 AM |
The Security Fire Department has no objections to the CDR & Site Plan as described. Mark Stanwood for SFD. | 2/29/2024 9:44:18 AM |