Project Review Comments

Back to List


Project Name
Mayberry Filing No 1
Description
Review associated engineering drawings and reaffirm water finding associated with an extension of a final plat (SF-06-012)
Location
Parcels
3400000259 3400000259 3400000260 3400000260 3400000345 3400000345 3400000346 3400000346
Applicant
JPS Engineering, Inc.
John Schwab ( john@jpsengr.com )
(719) 477-9429
John Schwab ( john@jpsengr.com )
(719) 477-9429
File Number
ASB2324
Project Manager
Stormwater Glenn Reese
Status
Active
Created
12/5/2023 2:34:09 PM

View: Project Documents



Review Comments (4)

Link Agency Comment
EPC Stormwater Review
2/17/2025 11:58:41 AM
Review 2: EPC DPW Stormwater comments have been resolved on the following document(s):
- Pond Cert Letter

EPC DPW Stormwater has no further comments. If/once Lupe's comments have also been resolved, this ASB review process will be deemed complete. At that time, this ASB file will be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Thanks.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
719.675.2654
GlennReese@elpasoco.com
2/17/2025 11:58:41 AM
View EPC Stormwater Review
2/2/2024 1:49:34 PM
Pond Certification Letter_v1 2/2/2024 1:49:34 PM
EPC Stormwater Review
2/2/2024 1:48:52 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Pond Certification Letter

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
2/2/2024 1:48:52 PM
PCD Engineering Division
1/25/2024 3:39:26 PM
Review 1 comments are as follows:

Submit updated as builts that show the two small roundabouts were removed from the plans.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
1/25/2024 3:39:26 PM