Project Review Comments
- Project Name
- 5810 OMAHA BLVD Dutch Bros Coffee Shop
- Description
- minor SDP for dutch bros coffee shop
- Location
- Parcels
- 5406304025 5406304025
- Applicant
-
Barghausen Consulting Engineers, Inc.
Brianna Uy ( buy@Barghausen.com ) Brianna Uy ( buy@Barghausen.com ) - EA Number
- EA23114
- File Number
- PPR2413
- Project Manager
- Lacey Dean
- Status
- Closed
- Created
- 11/27/2023 9:17:03 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
9/18/2024 9:27:31 AM |
Planning Review 5 comments have been RESOLVED on the following documents: - Site Development Plan No additional Planning review is required. Please resubmit the GEC plan with full size cover sheet, per Bret's email. Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com 719-520-7943 |
9/18/2024 9:27:31 AM | |
Cherokee Metro Dist
9/13/2024 12:35:08 PM |
All changes specified on 04September2024 response letter for Cherokee Metropolitan have been made on the utility plan. | 9/13/2024 12:35:08 PM | |
PCD Engineering Division
9/12/2024 3:08:28 PM |
Engineering Review 5 comments have been resolved on the following documents: - Grading Plan No additional engineering review is required. Reviewed by: Bret Dilts, PE bretdilts@elpasoco.com 719-339-5062 |
9/12/2024 3:08:28 PM | |
Cherokee Metro Dist
9/3/2024 2:22:36 PM |
Refer to sheet 11 for these notes. on water construction note 3, add water meter on other side of wall at that location. on sanitary note 4, looks close but refer to CSU water-LESS drawing D1-4 for the mandatory 2-way cleanout located 2 feet outside of building's foundation. For utility crossings, the sewer needs to be 1.5 feet above or below the domestic water. If closer than 1.5 feet then plans must specify that there is secondary containment. CSU water-LESS drawing A7-1 outlines these crossings. Grease Interceptor looks good, within the standards quantity range. |
9/3/2024 2:22:36 PM | |
View |
PCD Project Manager
8/21/2024 6:30:35 PM |
Review 4: Planning has minor comments on the Site Development Plan. Please revise and resubmit for final review and approval. Reviewed by: Lacey Dean laceydean2@elpasoco.com |
8/21/2024 6:30:35 PM |
View |
PCD Engineering Division
8/21/2024 1:29:07 PM |
Grading Plan | 8/21/2024 1:29:07 PM |
PCD Engineering Division
8/21/2024 1:27:17 PM |
Engineering Review 4 comments have been provided on the following documents: - Grading Plan Please provide the following documents with owners and developers signature in the next submittal. - Drainage Report - Traffic Impact Study - Grading Plan Reviewed by: Bret Dilts, PE bretdilts@elpasoco.com 719-339-5062 |
8/21/2024 1:27:17 PM | |
View |
Cherokee Metro Dist
7/30/2024 11:19:21 AM |
On page 11 of "grading plan", your Utility plan needs the following changes for final approval: under sanitary sewer construction notes, the sanitary sewer cleanout needs to specify that it will in in accordance with Cherokee standard as well. Our standards are mostly in line with CSU water/wastewater Line extension service standards. On the Utility crossing table, your electrical clearance with the domestic water is correct, however, your sewer and potable-water need to have 18" of vertical separation at the crossings per Cherokee Metropolitan District standard. Other than those changes, the utility plan is good. attached is a written-on Utility plan with these needed changes marked |
7/30/2024 11:19:21 AM |
View |
Colorado Department of Transportation - Pueblo Office
7/25/2024 3:42:26 PM |
7/25/2024 3:42:26 PM | |
PCD Project Manager
7/17/2024 2:12:09 PM |
Review 3: EPC Planning has no additional comments. Reviewed by: Lacey Dean, Associate Planner laceydean2@elpasoco.com |
7/17/2024 2:12:09 PM | |
View |
PCD Engineering Division
7/17/2024 2:08:51 PM |
V3_Grading Plan | 7/17/2024 2:08:51 PM |
PCD Engineering Division
7/17/2024 2:04:20 PM |
Engineering Review 3 comments have been provided on the following documents (to be uploaded by the Project Manager): - Grading Plan The following documents do not need any additional review. - Drainage Report Reviewed by: Bret Dilts, PE bretdilts@elpasoco.com 719-339-5062 |
7/17/2024 2:04:20 PM | |
Cherokee Metro Dist
7/12/2024 4:27:18 PM |
Add Utility Plans for Cherokee Metro District to review | 7/12/2024 4:27:18 PM | |
Colorado Department of Transportation - Pueblo Office
7/9/2024 8:18:07 AM |
CDOT formal comments pending. Preliminary comments as follows: The applicant should be aware that the intersection of Palmer Park / Access Road will not remain a full movement signalized access. With the development north of Palmer Park, the intersection will initially be converted to a right in/out when Wynoka Rd is extended to its platted location. The extension of Wynoka Rd to Palmer will likely require signalization of the intersection. Timing is unknown. |
7/9/2024 8:18:07 AM | |
View |
PCD Project Manager
6/19/2024 4:11:07 PM |
V2_Grading Plan | 6/19/2024 4:11:07 PM |
View |
PCD Project Manager
6/19/2024 4:10:48 PM |
V2_Drainage Report | 6/19/2024 4:10:48 PM |
PCD Project Manager
6/19/2024 2:16:45 PM |
Review 2: EPC Planning comments have been RESOLVED on the following documents: - Application/Petition Form - Landscape Plan Drawings - Lighting Plan - Sign Plan - Site Development Plan - Floor Plans - Elevation Plans No further comments. Reviewed by: Lacey Dean Planner I laceydean2@elpasoco.com |
6/19/2024 2:16:45 PM | |
PCD Engineering Division
6/18/2024 4:43:11 PM |
Engineering Review 2 comments have been provided on the following documents (to be uploaded by the Project Manager): - Grading Plan - Drainage Report The following documents do not need any additional review. - TIS (unlocked version) - Site Development Plan Reviewed by: Bret Dilts, PE Engineer III bretdilts@elpasoco.com |
6/18/2024 4:43:11 PM | |
EPC Stormwater Review
6/17/2024 5:47:46 PM |
Review 1: EPC DPW Stormwater comments have been resolved on the following documents: - Drainage Report - Grading Plan - PBMP Applicability Form EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
6/17/2024 5:47:46 PM | |
View |
Colorado Department of Transportation - Pueblo Office
5/28/2024 10:01:37 AM |
5/28/2024 10:01:37 AM | |
View |
Colorado Springs Airport Advisory Commission
5/23/2024 1:55:48 PM |
This item was reviewed and approved by the Airport Advisory Commission with the below comments on 5/22/2024: Airport staff recommends no objection with the following conditions: • Avigation Easement: An avigation easement is requested or provide proof of previous recording (book/page or reception number) please add on plat. • FAA Form 7460-1: Based on elevation data and distance to runway, the applicant will need to file Federal Aviation Administration (FAA) Form 7460-1 “Notice of Proposed Construction or Alteration” for any new vertical development at this site, including temporary construction equipment, and provide FAA documentation to the Airport before the commencement of construction activities; FAA’s website (https://oeaaa.faa.gov/oeaaa/external/portal.jsp). |
5/23/2024 1:55:48 PM |
View |
Cherokee Metro Dist
5/6/2024 12:00:29 PM |
- Notes for Sheet 2 "General notes" need to explicitly state that CSU 2023 standards with Cherokee additions (can be found on cherokeemetro.org) - Any valves emplaced must open with a left turn. - on page 10, symbology for existing water line is inconsistent with legend. - on page 10 water and sewer entrance and exit are within 10 ft in a parallel formation. Secondary containment needs to be specified on the sewer line. - The Grease interceptor needs to be a minimum of 325 gallons. Provide more detailed schematic |
5/6/2024 12:00:29 PM |
View |
El Paso County Conservation Dist
5/1/2024 3:36:12 PM |
Please see attached .PDF with brief comments. Thanks! | 5/1/2024 3:36:12 PM |
View |
PCD Project Manager
4/30/2024 4:27:13 PM |
PBMP Applicability Form | 4/30/2024 4:27:13 PM |
View |
PCD Project Manager
4/30/2024 4:26:40 PM |
Grading Plan | 4/30/2024 4:26:40 PM |
View |
PCD Project Manager
4/30/2024 4:26:21 PM |
Drainage Report | 4/30/2024 4:26:21 PM |
View |
PCD Project Manager
4/30/2024 4:24:50 PM |
TIS (unlocked version) | 4/30/2024 4:24:50 PM |
PCD Engineering Division
4/30/2024 4:07:05 PM |
Engineering Review 1 comments have been provided on the following documents (to be uploaded by the Project Manager): - TIS (unlocked version) - Site Development Plan - Grading Plan - Drainage Report Reviewed by: Bret Dilts, PE Engineer III bretdilts@elpasoco.com |
4/30/2024 4:07:05 PM | |
View |
PCD Project Manager
4/30/2024 3:58:03 PM |
Elevation Plans | 4/30/2024 3:58:03 PM |
View |
PCD Project Manager
4/30/2024 3:57:45 PM |
Floor Plans | 4/30/2024 3:57:45 PM |
View |
PCD Project Manager
4/30/2024 3:57:18 PM |
Site Development Plan | 4/30/2024 3:57:18 PM |
View |
PCD Project Manager
4/30/2024 3:56:55 PM |
Sign Plan | 4/30/2024 3:56:55 PM |
View |
PCD Project Manager
4/30/2024 3:56:22 PM |
Lighting Plan | 4/30/2024 3:56:22 PM |
View |
PCD Project Manager
4/30/2024 3:55:47 PM |
Landscape Plan Drawings | 4/30/2024 3:55:47 PM |
View |
PCD Project Manager
4/30/2024 3:55:17 PM |
Application/Petition Form | 4/30/2024 3:55:17 PM |
PCD Project Manager
4/30/2024 3:54:33 PM |
Review 1: EPC Planning comments have been provided (in green text boxes) on the following uploaded documents: - Application/Petition Form - Landscape Plan Drawings (**NOTE: You can copy and paste this link (https://epc-assets.elpasoco.com/wp-content/uploads/sites/12/LDC-Resolution/LDC-Clean-Final.pdf) to reference the updated Landscape Code to address comments) - Lighting Plan - Sign Plan - Site Development Plan - Floor Plans - Elevation Plans Reviewed by: Lacey Dean Planner I laceydean2@elpasoco.com |
4/30/2024 3:54:33 PM | |
EPC Stormwater Review
4/30/2024 3:04:22 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by Project Manager): - Drainage Report - Grading Plan - PBMP Applicability Form Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
4/30/2024 3:04:22 PM | |
Cherokee Metro Dist
4/29/2024 10:56:59 AM |
Please submit utility drawings on next round | 4/29/2024 10:56:59 AM | |
Cimarron Hills Fire
4/29/2024 9:58:09 AM |
Good morning, Lacey, The Cimarron Hills Fire Department (CHFD) has reviewed and approves Barghausen Consulting Engineers, Inc., site development plan for a Dutch Brothers Coffee Shop, File No. PPR2413. No further comments. Thomas P. Joyce Division Chief Cimarron Hills Fire Department Office: 719-591-0960 Cell: 719-828-1987 tjoyce@cimarronhillsfire.org |
4/29/2024 9:58:09 AM | |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/24/2024 3:05:37 PM |
Good afternoon Lacey, Please see the attached CSU 1st review comments for PPR2413. Additional comments are requested. Best, Matthew Alcuran, MPA| Engineering Support Specialist Sr. Utilities Development Services | Colorado Springs Utilities 1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903 O: 719-668-8261 |malcuran@csu.org |
4/24/2024 3:05:37 PM |
Pikes Peak Regional Building Department
4/24/2024 7:23:34 AM |
1. If the trash enclosure exceeds 7’ therefore, a separate address will need to be assigned along with a separate permit. No further comment. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
4/24/2024 7:23:34 AM | |
Falcon School District 49
4/22/2024 1:24:30 PM |
District 49 does not have any comments at this time but respectfully reserves the right to comment on any future submittals. | 4/22/2024 1:24:30 PM |