Project Review Comments
- Project Name
- Bent Grass East Commercial Filing 3
- Description
- Six commercial lots and a private road south of Bent Grass Meadows Drive. Water Sufficiency requested with preliminary plan.
- Location
- Parcels
- 5301101060 5301101060
- Applicant
-
Classic Consulting Engineers & Surveyors, LLC
kyle campbell ( KCampbell@classicconsulting.net )
(719) 492-1219 kyle campbell ( KCampbell@classicconsulting.net )
(719) 492-1219 - File Number
- ASB2319
- Project Manager
- Stormwater Glenn Reese
- Status
- Closed
- Created
- 11/7/2023 11:03:06 AM
View: Project Documents
| Agency | Comment | ||
|---|---|---|---|
|
EPC DPW Asset Management
10/1/2025 12:30:25 PM |
We have reviewed your case and given your circumstances, we are prepared to accept your files as is. In the future, we would like you to please deliver to us CAD files and drawings that conform to Section 5.10.5.C & D of our Engineering Criteria Manual either in Colorado State Plane Central Zone coordinates or with a layer that clearly denotes your site monuments that conform to Section 5.10.5.C of our Engineering Criteria Manual, which states: C. Monument Caps and Data All monuments shall be metallic caps stamped with the registered business name or the letters "L.S." followed by the registration number of the surveyor in charge. All monuments shall include state plane coordinate and elevation information meeting County GIS Standards along with any information required by State law. Good day, Matt Goolsby Senior Geospatial Analyst 719.352.5937 MatthewGoolsby@elpasoco.com |
10/1/2025 12:30:25 PM | |
|
PCD Engineering Division
7/28/2025 2:16:49 PM |
Engineering Review Ver. 1 No engineering review comments Construction Branch (Mr. Brad Walters) will schedule the final acceptance inspection. Thank you. Edward Schoenheit, Engineer E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 edwardschoenheit@elpasoco.com https://planningdevelopment.elpasoco.com/ |
7/28/2025 2:16:49 PM | |
|
EPC Stormwater Review
7/24/2025 2:03:22 PM |
EPC DPW Stormwater has no comments. Project Manager: no re-review necessary. Reviewed by: Glenn Reese, P.E. Principal Engineer - Stormwater 719.675.2654 GlennReese@elpasoco.com Zachary Jannusch Associate Engineer - Stormwater 719.500.3170 ZacharyJannusch@elpasoco.com |
7/24/2025 2:03:22 PM | |
|
EPC DPW Asset Management
7/21/2025 10:01:32 AM |
CAD is not in any know coordinate system and does not contain and benchmarks or horizontal control points. | 7/21/2025 10:01:32 AM |
EDARP