Project Review Comments

Back to List


Project Name
Mountain's Edge Final Plat
Description
A request for a final plat to create 5 lots
Location
North of the intersection of Scott Road and McClelland Road on the east side
Parcels
3200000639 3200000639 3200000740 3200000740
Applicant
Vertex Consulting Services
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
File Number
ASB2317
Project Manager
Brad Walters
Status
Active
Created
10/31/2023 10:07:46 AM

View: Project Documents



Review Comments (4)

Link Agency Comment
View EPC Stormwater Review
11/21/2024 12:55:04 PM
As Built Drawings_v1 11/21/2024 12:55:04 PM
EPC Stormwater Review
11/21/2024 12:51:34 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- As Built Drawings

Reviewed by:
Christina Prete, P.E.
Stormwater Manager
719.520.6877
ChristinaPrete@elpasoco.com
11/21/2024 12:51:34 PM
PCD Engineering Division
11/20/2024 9:54:00 AM
There are no comments relating to drainage or transportation.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
11/20/2024 9:54:00 AM
PCD Engineering Inspections
11/8/2024 4:57:44 PM
No Comments for Inspections 11/8/2024 4:57:44 PM