Project Review Comments
- Project Name
- Arrowhead Trailer Rural Home Occupation Expansion
- Description
- Expansion of previously approved Arrowhead Trailer Rural Home Occupation by converting ag structure to office space and constructing new 64'x64' building for storage.
- Location
- Parcels
- 4233001001 4233001001
- Applicant
-
Arrowhead Trailer and Sales
Aaron Smith ( aaronsmith425@live.com )
(719) 351-4097 Aaron Smith ( aaronsmith425@live.com )
(719) 351-4097 - File Number
- AL2329
- Project Manager
- Ashlyn Mathy
- Status
- Active
- Created
- 10/11/2023 3:30:32 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
10/8/2024 3:27:24 PM |
The parking substitute plan will need more information to be provided. It is suggested that a basic traffic letter or memo be provided to staff. These documents do need to be crafted by a licensed professional. D.No TIS Required. No TIS is required if all of the criteria below are satisfied: • Vehicular Traffic: (1) Daily vehicle trip-end generation is less than 100 or the peak hour trip generation is less than 10; (2) there are no additional proposed minor or major roadway intersections on major collectors, arterials, or State Highways; (3) the increase in the number of vehicular trips does not exceed the existing trip generation by more than 10 peak hour trips or 100 daily trip ends; (4) the change in the type of traffic to be generated (i.e., the addition of truck traffic) does not adversely affect the traffic currently planned for and accommodated within, and adjacent to, the property; (5) acceptable LOS on the adjacent public roadways, accesses, and intersections will be maintained; (6)no roadway or intersection in the immediate vicinity has a history of safety or accident problems; and (7) there is no change of land use with access to a State Highway. • Pedestrian Traffic: Paved pedestrian facilities exist or will be constructed on, or adjacent to, the site; or, the proposed use will not generate any new pedestrian traffic. • Bicycle Traffic: Paved bicycle lanes or paths exist or will be constructed on, or adjacent to, the site; or, the proposed use will not generate any new bicycle traffic. |
10/8/2024 3:27:24 PM | |
View |
Colorado Department of Transportation - Pueblo Office
9/26/2024 2:04:55 PM |
9/26/2024 2:04:55 PM | |
EPC Code Enforcement
3/14/2024 11:32:57 AM |
No concerns from Code Enforcement. | 3/14/2024 11:32:57 AM | |
View |
PCD Project Manager
2/28/2024 8:50:04 AM |
comments on site plan. | 2/28/2024 8:50:04 AM |
View |
EPC Health Department
1/26/2024 9:51:21 PM |
1/26/2024 9:51:21 PM | |
View |
El Paso County Conservation Dist
1/24/2024 11:05:55 AM |
Brief comments attached as a .pdf. | 1/24/2024 11:05:55 AM |
Colorado Division of Water Resources
1/5/2024 10:57:39 AM |
DWR has reviewed the referral for the Arrowhead Trailer Rural Home Occupation Expansion, which does not appear to qualify as a “subdivision” as defined in section 30-28-101(10)(a), C.R.S. Therefore, pursuant to the State Engineer’s March 4, 2005 and March 11, 2011 memorandums to county planning directors, this office only performed a cursory review of the referral information. No information was provided regarding proposed water uses or estimated water demands on the property, therefore this office has no comments on the water supply for this referral. |
1/5/2024 10:57:39 AM | |
Colorado Department of Transportation - Pueblo Office
1/2/2024 2:40:15 PM |
• Section 1.4(1) of the State Highway Access Code, states in part that no person, shall construct any access providing direct vehicular movement to or from any state highway from or to property in close proximity or abutting a state highway without an access permit issued by the designated issuing authority with the written approval of the Department. • Under Section 2.6 (Change in Land Use and Access Use) of the State Highway Access Code, states the requirements of a new access permit. It states in part that if any significant changes are made or will be made in the use of the property which will affect access operation, traffic volume increases by 20% and/or vehicle type, the permittee or property owner will coordinate with the local authority and the Department to determine if a new access permit and modifications to the access are required. • An updated CDOT Access Permit may be required for this development for the connection to SH24. • Future closure of this access is eminent per the State Highway Access Control Plan. It is my recommendation to look for a long term access point from the east future frontage road. • Please provide a Traffic Memo to determine if there is a 20% increase in traffic patterns from the original permit. |
1/2/2024 2:40:15 PM | |
PCD Administrative Notice
12/15/2023 10:31:50 AM |
Notices of a Received Application were mailed to surrounding property owners (7) within a 500-foot range on 12/15/2023. The cost of postage = $4.41. MB | 12/15/2023 10:31:50 AM | |
View |
PCD Project Manager
12/7/2023 3:36:24 PM |
site plan comments | 12/7/2023 3:36:24 PM |
View |
PCD Project Manager
12/7/2023 3:36:03 PM |
Letter of intent comments | 12/7/2023 3:36:03 PM |
View |
PCD Project Manager
12/7/2023 3:35:00 PM |
Application comment | 12/7/2023 3:35:00 PM |
Pikes Peak Regional Building Department
12/7/2023 7:19:45 AM |
1. Will the use of the existing building be used for business? If the building is no longer AG exempt, then a separate address will need to be assigned. Plans will also need to be submitted under this new address to convert to an office. 2. Will the new building also be AG exempt? If not, then this building will also require a separate address. Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
12/7/2023 7:19:45 AM | |
Upper Black Squirrel Creek GWMD
12/6/2023 3:19:28 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. | 12/6/2023 3:19:28 PM | |
Mountain View Electric Association, Inc.
12/6/2023 10:10:42 AM |
MVEA has no objection to this special use expansion | 12/6/2023 10:10:42 AM | |
View |
EPC Code Enforcement
12/4/2023 2:32:31 PM |
12/4/2023 2:32:31 PM | |
View |
EPC Code Enforcement
12/4/2023 2:32:20 PM |
12/4/2023 2:32:20 PM | |
View |
EPC Code Enforcement
12/4/2023 2:32:09 PM |
12/4/2023 2:32:09 PM | |
View |
EPC Code Enforcement
12/4/2023 2:31:58 PM |
12/4/2023 2:31:58 PM | |
View |
EPC Code Enforcement
12/4/2023 2:31:45 PM |
The outside storage of trailers for sale need to be included. | 12/4/2023 2:31:45 PM |
PCD Engineering Division
11/20/2023 2:56:29 PM |
Engineering has no comments at this time. Note: - Please ensure channel at the southeast corner of the property is maintained to reduce erosion to downstream properties. Reviewed by: Carlos Hernandez carloshernandez@elpasoco.com |
11/20/2023 2:56:29 PM | |
View |
Falcon Fire Protection District
11/20/2023 10:29:34 AM |
11/20/2023 10:29:34 AM |