Project Review Comments
- Project Name
- Matika
- Description
- Construction Drawings and new SIA for infrastructure that was never completed with original final plat
- Location
- Parcels
- 5132001061 5132001061 5132001062 5132001062 5132001063 5132001063 5132001064 5132001064 5132001065 5132001065 5132001066 5132001066 5132001067 5132001067
- Applicant
-
Jordan Savage
David Gorman ( daveg@mvecivil.com ) David Gorman ( daveg@mvecivil.com ) - File Number
- ASB238
- Project Manager
- Stormwater Glenn Reese
- Status
- Closed
- Created
- 10/3/2023 7:51:24 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
3/31/2025 7:55:01 AM |
Review 3: EPC DPW Stormwater comments have been resolved on the following document(s): - As-Built Construction Drawing (just one additional comment about the check dams) EPC DPW Stormwater has no further comments. Since Brad’s comments have also been resolved, this ASB review process will be deemed complete. This ASB file will now be marked as Approved/Closed on EDARP and no further action is required by the Applicant. Thanks. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
3/31/2025 7:55:01 AM | |
PCD Engineering Inspections
3/13/2025 8:04:14 AM |
No comments from inspections. Brad Walters Inspections Supervisor |
3/13/2025 8:04:14 AM | |
View |
EPC Stormwater Review
2/24/2025 1:15:16 PM |
As-Built Construction Drawing | 2/24/2025 1:15:16 PM |
EPC Stormwater Review
2/24/2025 1:15:03 PM |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - As-Built Construction Drawing (just one additional comment about the check dams) EPC DPW Stormwater comments have been resolved on the following document(s): - Pond & Road Certification Letter Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
2/24/2025 1:15:03 PM | |
EPC Stormwater Review
11/30/2023 5:21:13 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - V1_As-Built Construction Drawing - V1_Pond & Road Certification Letter Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
11/30/2023 5:21:13 PM | |
View |
EPC Stormwater Review
11/30/2023 5:20:26 PM |
V1_Pond & Road Certification Letter | 11/30/2023 5:20:26 PM |
View |
EPC Stormwater Review
11/30/2023 5:20:16 PM |
V1_As-Built Construction Drawing | 11/30/2023 5:20:16 PM |
PCD Engineering Division
11/30/2023 12:50:29 PM |
Review 1 comments will be submitted by EPC Stormwater for the following document: -As Builts Reviewed By: Lupe Packman lupepackman@elpasoco.com |
11/30/2023 12:50:29 PM |