Project Review Comments

Back to List


Project Name
Rocky Mtn Cavalry Chapel - Final Plat
Description
Legalize the illegal lot the chapel is on.
Location
Parcels
3400000207 3400000207
Applicant
M.V.E., Inc.
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
David Gorman ( daveg@mvecivil.com )
(719) 635-5736
EA Number
EA21223
File Number
SF258
Project Manager
Ashlyn Mathy
Status
Active
Created
9/27/2023 9:38:30 AM

View: Project Documents



Review Comments (18)

Link Agency Comment
View Parks Advisory Board
4/10/2025 8:51:26 AM
El Paso County Parks and Community Services Department, Final Comments - Please See Attached Documentation (Endorsed by the Park Advisory Board on 04/09/2025) 4/10/2025 8:51:26 AM
View PCD Project Manager
4/4/2025 9:30:28 AM
WRR comments 4/4/2025 9:30:28 AM
View PCD Project Manager
4/4/2025 9:30:00 AM
WSIS comments 4/4/2025 9:30:00 AM
View PCD Project Manager
4/4/2025 9:29:42 AM
final plat comments 4/4/2025 9:29:42 AM
View PCD Project Manager
4/4/2025 9:29:14 AM
Letter of Intent comments 4/4/2025 9:29:14 AM
PCD Engineering Division
4/3/2025 6:20:11 PM
Engineering Review Ver.1

Please see engineering review comments on the following documents
Please address comments returned on PPR2420 as SF258 document have not been updated.

Final Plat_V1
ESQCP_V2 Owner sign and date.
FAE_V2 Please update to 2025 form and address comments. Owner and Engineer sign/stamp
DMA_V2 County attorney comments to be addressed. Owner sign and notarize.
TIS_V2 Owner sign
FDR_V2 Address all comments ENGR and Owner sign
GEC Plan_V2 See comments, Owner sign, ENGR stamp/sign all pages

Easement agreement to be finalized and submitted.
Note Plat must be approved prior to SDP approval.
EPC Road Impact fees are applicable. $2,371/ per 1,000 sf 10,000sqft bldg Fee= $23,710 to be paid at time of building permit.
4/3/2025 6:20:11 PM
Upper Black Squirrel Creek GWMD
4/3/2025 12:11:29 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 4/3/2025 12:11:29 PM
Colorado Geological Survey
4/2/2025 1:08:23 PM
The site does not contain steep slopes, is not undermined, and does not contain, nor is it exposed to, any geologic hazards that would preclude the new church building. The Colorado Geological Survey has no objection to the approval of the final plat.

Per Entech’s Report (Entech Engineering, March 19, 2024), the geologic conditions that will pose constraints on the site include areas of artificial fill, potentially expansive soils, and the potential for elevated radon levels. Note 10 of the final plat (M.V.E., Inc., January 29, 2024) correctly references Entech’s report and geologic constraints, with the exception of radon. We offer the following comments.

1. Sheet C1.2 of the Grading & Erosion Control map references a geotechnical investigation by CTL Thompson, Inc., dated May 8, 2012. This note should be updated to Entech’s report.
2. Entech’s recommendations for erosion control measures (page 9) must be incorporated during the design and construction of the proposed facility.
3. Entech’s recommendations should be strictly adhered to.

Submitted 4/2/2025 by Amy Crandall, Engineering Geologist, Colorado Geological Survey (303-384-2632 or acrandall@mines.edu)
4/2/2025 1:08:23 PM
County Attorney - Development Review
4/1/2025 3:31:32 PM
No comments from County Attorney - Development Review at this time.

Lori Seago
Sr. County Attorney
loriseago@elpasoco.com
4/1/2025 3:31:32 PM
County Attorney - Water
4/1/2025 2:50:46 PM
This subdivision is subject to Section 8.4.7 of the El Paso County Land Development Code, which includes a requirement that the applicant provide evidence of a water supply sufficient to serve the subdivision for 300 years. Based on the estimated demand of 0.57 AF/year, the applicant needs to demonstrate ownership of or a right to use 171 AF of water (0.57 x 300). In addition, documentation needs to be corrected as follows:
1. The Water Supply Information Summary must address the total square footage of all buildings, not just the addition.
2. Evidence that well ownership information has been updated with the Division of Water Resources must be provided.
3. Water quality must be analyzed and meet the requirements of the Code.

Lori Seago
Sr. County Attorney
loriseago@elpasoco.com
4/1/2025 2:50:46 PM
Pikes Peak Regional Building Department
3/25/2025 11:01:09 AM
1. The address needs to be running parallel to the street it is addressed from. Placing the address in this manner shows me that this address is from Bunny View and not N. Ellicott Hwy. Rotate the address.
2. In the title block the section number is 2 not 1. Please correct.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
3/25/2025 11:01:09 AM
Colorado Parks and Wildlife
3/24/2025 3:46:50 PM
No Comment 3/24/2025 3:46:50 PM
Mountain View Electric Association, Inc.
3/24/2025 1:36:07 PM
MVEA has no objection to the application to legalize the lot 3/24/2025 1:36:07 PM
View EPC Parks Department
3/19/2025 11:02:10 AM
El Paso County Parks and Community Services Department, Preliminary Comments - Please See Attached Documentation (To be presented to the Park Advisory Board for endorsement on April 9, 2025) 3/19/2025 11:02:10 AM
EPC DPW Stormwater
3/31/2025 7:41:34 AM
Review 1: Per a recent phone conversation with MVE, the SW-related docs submitted for this SF are identical to the latest docs that were submitted and reviewed with PPR2420. So just address my PPR comments and resubmit, I have no additional comments on this SF. Thanks.

For reference, here is my latest comment with PPR2420:

EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded document(s):
- Drainage Report
- FAE
- GEC Plan
- GEC Checklist
- Landscape Plan..............(to be uploaded by PM)
- MHFD Detention Calcs or SDI Form
- PBMP Applicability Form
- PBMP O&M Manual
- SWMP
- SWMP Checklist

Please provide the following document(s) upon resubmittal (the planner will need to send an upload request):
- Notice of Intent to Construct a Non-Juris. Water Impoundment Structure (proof of submittal)

Reviewed by:
Glenn Reese, P.E.
Principal Engineer - Stormwater
719.675.2654
GlennReese@elpasoco.com
3/31/2025 7:41:34 AM
View EPC Environmental Services
3/17/2025 1:53:53 PM
3/17/2025 1:53:53 PM
View Colorado Department of Transportation - Pueblo Office
3/14/2025 7:37:40 AM
Please see the attached letter. 3/14/2025 7:37:40 AM
911 Authority - El Paso/Teller County
3/13/2025 10:12:21 AM
No action for E911 on this submittal.
Thank you.
Justin
3/13/2025 10:12:21 AM