Project Review Comments

Back to List


Project Name
The Estates at Cathedral Pines EGP
Description
Early grading for The Estates at Cathedral Pines - project consists of 8 residential lots ranging from 2.8 ac to 4.5 acres
Location
Parcels
6200000411 6200000411
Applicant
William Guman & Associates, Ltd.
Bill Guman ( bill@guman.net )
(719) 633-9700
Bill Guman ( bill@guman.net )
(719) 633-9700
EA Number
EA21208
File Number
EGP232
Project Manager
Ryan Howser
Status
Closed
Created
8/16/2023 9:54:07 AM

View: Project Documents



Review Comments (16)

Link Agency Comment
EPC Stormwater Review
3/21/2024 4:08:52 PM
All Stormwater comments have been addressed. 3/21/2024 4:08:52 PM
View EPC Stormwater Review
3/13/2024 4:52:32 PM
FAE_v3 3/13/2024 4:52:32 PM
View EPC Stormwater Review
3/13/2024 4:52:12 PM
ESQCP_v3 3/13/2024 4:52:12 PM
EPC Stormwater Review
3/13/2024 4:20:39 PM
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP
- FAE

Planner: Comments are minor in nature, please put resubmittal on a 3 day review period.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
3/13/2024 4:20:39 PM
PCD Engineering Division
3/12/2024 9:31:13 AM
Review 3: Previous review comments have been resolved. Any approved documents will be uploaded by the project engineer.

Reviewed by:
Carlos Hernandez
carloshernandez@elpasoco.com
3/12/2024 9:31:13 AM
View EPC Stormwater Review
1/4/2024 5:03:26 PM
SWMP_v2 1/4/2024 5:03:26 PM
EPC Stormwater Review
1/4/2024 5:02:48 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- SWMP

Please address comments on the following documents from Review 1:
- ESQCP

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
1/4/2024 5:02:48 PM
View PCD Engineering Division
1/3/2024 9:59:19 AM
V2_ Drainage Report Comments 1/3/2024 9:59:19 AM
PCD Engineering Division
1/3/2024 9:58:37 AM
Review 2: See review comments on the following document(s) (engineering comments are in blue textboxes):

- Final Drainage Report (Please resolve minor comments and submit with signatures)

Comments have been resolved on the following document(s):
- Early Grading Request
- GEC Plan

Reviewed by:
Daniel Torres, P.E.
Carlos Hernandez
danieltorres@elpasoco.com
carloshernandez@elpasoco.com
1/3/2024 9:58:37 AM
View PCD Engineering Division
10/24/2023 3:41:25 PM
GEC Plan Comments 10/24/2023 3:41:25 PM
View PCD Engineering Division
10/24/2023 3:40:59 PM
Early Grading Request Form Comments 10/24/2023 3:40:59 PM
View PCD Engineering Division
10/24/2023 3:40:40 PM
Final Drainage Report Comments 10/24/2023 3:40:40 PM
PCD Engineering Division
10/24/2023 3:40:03 PM
Review 1: See review comments on the following documents (engineering comments are in blue textboxes):

- Final Drainage Report
- Early Grading Request
- Grading & Erosion Control Plan


Reviewed by:
Daniel Torres, P.E.
Carlos Hernandez
danieltorres@elpasoco.com
carloshernandez@elpasoco.com
10/24/2023 3:40:03 PM
View EPC Stormwater Review
10/24/2023 12:00:57 PM
ESQCP_v1 10/24/2023 12:00:57 PM
EPC Stormwater Review
10/24/2023 12:00:22 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- ESQCP
- GEC Plan...............(to be uploaded with Development Services comments)

Please submit the following documents:
- SWMP (the SWMP Checklist was uploaded in its place)
- Pre-Subdivision Site Grading Acknowledgement and Right of Access Form (Type C Application Form (1-2B) was uploaded in its place)

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
10/24/2023 12:00:22 PM
PCD Project Manager
10/4/2023 4:23:50 PM
Planning has no comments at this time. 10/4/2023 4:23:50 PM