Project Review Comments
- Project Name
- PPAM Maintenance Bldg
- Description
- Site development plan for maintenance building on Pikes Peak. Replacing existing building on an adjacent site. Due to natural landscaping, landscape plan not required. Due to lack of proposed on-site lighting, photometric plan not required.
- Location
- Parcels
- 8300000014 8300000014
- Applicant
-
Kimley-Horn and Associates, Inc.
Kevin Kofford ( kevin.kofford@kimley-horn.com )
(719) 453-0181 Kevin Kofford ( kevin.kofford@kimley-horn.com )
(719) 453-0181 - File Number
- PPR2335
- Project Manager
- Ashlyn Mathy
- Status
- Closed
- Created
- 6/29/2023 8:28:14 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
View |
PCD Project Manager
1/3/2024 3:17:04 PM |
I am so sorry for the delay. EDARP glitched and I was not assigned to the project and had to reassign myself! One minor comment on SDP! |
1/3/2024 3:17:04 PM |
PCD Engineering Division
12/5/2023 7:34:57 AM |
Engineering Review Ver.2 No further engineer comments. Documents routed for final County approval. Road Impact Fee not applicable due to existing maintenance building use. Old maintenance Bldg. to be used for maintenance vehicle and equipment storage. Thank you. Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
12/5/2023 7:34:57 AM | |
EPC Stormwater Review
12/5/2023 7:24:40 AM |
Review 2: EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Note: The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction. Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
12/5/2023 7:24:40 AM | |
View |
EPC Health Department
12/1/2023 12:04:21 PM |
12/1/2023 12:04:21 PM | |
Colorado Parks and Wildlife
10/13/2023 11:27:09 AM |
Colorado Parks and Wildlife (CPW) is in receipt of the above referenced permit application and is familiar with the site. Based both on the location and type of action that is proposed CPW believes impacts to the wildlife resource to be negligible. We appreciate being given the opportunity to comment. Please feel free to contact District Wildlife Manager, Tyson Floersheim, should you have any questions or require additional information at 719-439-9634 or via email at tyson.floersheim@state.co.us. | 10/13/2023 11:27:09 AM | |
View |
PCD Project Manager
10/10/2023 3:40:32 PM |
PBMP comments | 10/10/2023 3:40:32 PM |
View |
PCD Project Manager
10/10/2023 3:36:24 PM |
lighting plan comments | 10/10/2023 3:36:24 PM |
View |
PCD Project Manager
10/10/2023 3:35:47 PM |
Drainage report comments | 10/10/2023 3:35:47 PM |
View |
PCD Project Manager
10/10/2023 3:33:34 PM |
LOI comments | 10/10/2023 3:33:34 PM |
View |
PCD Project Manager
10/10/2023 3:33:08 PM |
SDP comments | 10/10/2023 3:33:08 PM |
EPC Stormwater Review
10/10/2023 3:11:55 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - PBMP Applicability Form Note: The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction. Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
10/10/2023 3:11:55 PM | |
PCD Engineering Division
10/10/2023 1:50:16 PM |
Engineering Review Ver.1 Please see comments on the following documents -FDR_V1_Please engineer sign/stamp and owner sign after comments has been addressed for final approval on next submission. (FDR to be uploaded by Stormwater) -Address any pending Stormwater comments. -SDP_V1 (SDP to be uploaded by PCD Planner) -PBMP_V1 requires engineer stamp -Road Impact fees are applicable. WAREHOUSE category for 12K sqft facility to be paid at time of building permit. https://publicworks.elpasoco.com/road-impact-fees/ Thank you. Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
10/10/2023 1:50:16 PM | |
Pikes Peak Regional Building Department
10/9/2023 6:53:39 AM |
1. Address on the site plan page C1.0 has permit history with PPRBD for New service & pedestals, underground electrical service, Wire water tank. This address seems to be used in multiple locations. Will any of the existing service connect to the proposed structure? Please clarify. Detached structures require separate addressing. Email me please. Amy Vanderbeek amy@pprbd.org Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
10/9/2023 6:53:39 AM | |
View |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
10/2/2023 10:25:30 AM |
Good morning Ashlyn, Please see the attached site development plan with three (3) CSU comments: 1.Please label as 12.5kV Primary OH Conductor (CSU # 12GM-2) 2.Please label as Water Distribution Main (CSU # W.030110) Water Way Tunnel 8 (CSU # W.046288) 3.10/2/23 sent to CSU Water Planning for comments/concerns. Best, Matthew Alcuran, MPA| Engineering Support Specialist Sr. Utilities Development Services | Colorado Springs Utilities 1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903 O: 719-668-8261 |malcuran@csu.org |
10/2/2023 10:25:30 AM |
View |
EPC Parks Department
9/27/2023 2:25:20 PM |
See Parks comments attached. | 9/27/2023 2:25:20 PM |
View |
Colorado State Forest Service
9/26/2023 9:34:03 AM |
The Colorado State Forest Service recommends that all forested acres be mitigated to reduce the risk of wildfire and that defensible space be created around this structure using the standards in the CSFS "Home Ignition Zone Guide" (formerly known as "Quick Guide FIRE 2012-1: Protecting Your Home From Wildfire") located on the Colorado State Forest Service website. https://csfs.colostate.edu/media/sites/22/2021/04/2021_CSFS_HIZGuide_Web.pdf In addition, we recommend that all wildfire mitigation be completed before or during construction. |
9/26/2023 9:34:03 AM |