Project Review Comments

Back to List


Project Name
1185 N Curtis Rd Variance of Land Use
Description
RV/ Mixed Storage
Location
Parcels
4410000052 4410000052
Applicant
ANDRII VARKO
ANDRII VARKO ( andriivarko@gmail.com )
(786) 394-0094
ANDRII VARKO ( andriivarko@gmail.com )
(786) 394-0094
EA Number
2319
File Number
VA235
Project Manager
Ashlyn Mathy
Status
Closed
Created
5/4/2023 2:38:41 PM

View: Project Documents



Review Comments (18)

Link Agency Comment
PCD Project Manager
5/8/2024 11:47:47 AM
Planning comments have been resolved. This will be put onto a hearing schedule.

-Ashlyn Mathy
5/8/2024 11:47:47 AM
View PCD Project Manager
4/5/2024 3:22:56 PM
site plan
minor comments: still need to resolve shipping containers within the setback and where the canopy will be moved to
4/5/2024 3:22:56 PM
View PCD Project Manager
1/19/2024 8:50:31 AM
site plan minor comments 1/19/2024 8:50:31 AM
PCD Engineering Division
1/18/2024 4:18:00 PM
Engineering Review Ver.4

No further engineer comments
Engineer comments resolved on the site plan for the special use submittal.
TIS routed for approval.


Notes for Site Development Plan future submittal. Please ensure the following issued are addressed in the SDP.

This area of disturbance will require an ESQCP permit, FDR, Grading & Erosion Control Plan and additional engineering and stormwater documents prepared by a CO licensed engineer. Water quality and detention will be required for this project. These documents will be required to be submitted with the full Site Development Plan submission application.

Road Impact fees are applicable. If no building permit is obtained from PPRBD then road impact fees must be paid at time of site development plan approval.

A commercial driveway access permit will be required. Apply through EDARP under Initiate a Minor Application for PRI/SEC roadside ditch driveway access point.

Note the site development plan for the special use approval will be limited as to the number of RV and container storage depicted. If the RV and container storage were to increase the site plan would need to be updated. Additional Road Impact fees would also be applicable. The current provision and density for RV and container storage over the planned ~2ac is very low compared against the capacity with most typical RV storage businesses and lots.

Ensure the planned grading plan and detention pond layout will be functional. The ponds will need proper grading, spilldown areas and proper outlets and possible drainage easement. With the vehicle and container storage pads directly around the detention ponds this may not be feasible. The ponds may also need to be set back further from the property line to allow for a property outlet structure, so no concentrated flow enter the adjacent property. Detailed GEC plan and drainage report will need to be provided with the SDP submittal.

Thank you

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com
1/18/2024 4:18:00 PM
View PCD Project Manager
12/20/2023 8:08:07 AM
site plan comments 12/20/2023 8:08:07 AM
PCD Engineering Division
12/19/2023 3:58:04 PM
Engineering Review Ver.3

Please see engineering review comments on the following documents
SDP_V3 To be uploaded by the PCD Planner

Please program a 3 business day for engineer re-review

Notes for Site Development Plan future submittal. Please ensure the following issued are addressed in the SDP.

This area of disturbance will require an ESQCP permit, FDR, Grading & Erosion Control Plan and additional engineering and stormwater documents prepared by a CO licensed engineer. Water quality and detention will be required for this project. These documents will be required to be submitted with the full Site Development Plan submission application.

Road Impact fees are applicable. If no building permit is obtained from PPRBD then road impact fees must be paid at time of site development plan approval.

A commercial driveway access permit will be required. Apply through EDARP under Initiate a Minor Application for PRI/SEC roadside ditch driveway access point.

Note the site development plan for the special use approval will be limited as to the number of RV and container storage depicted. If the RV and container storage were to increase the site plan would need to be updated. Additional Road Impact fees would also be applicable. The current provision and density for RV and container storage over the planned ~2ac is very low compared against the capacity with most typical RV storage businesses and lots.

Ensure the planned grading plan and detention pond layout will be functional. The ponds will need proper grading, spilldown areas and proper outlets and possible drainage easement. With the vehicle and container storage pads directly around the detention ponds this may not be feasible. The ponds may also need to be set back further from the property line to allow for a property outlet structure, so no concentrated flow enter the adjacent property. Detailed GEC plan and drainage report will need to be provided with the SDP submittal.

Thank you

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com
12/19/2023 3:58:04 PM
View PCD Project Manager
12/1/2023 3:49:48 PM
Traffic memo / TIS comments 12/1/2023 3:49:48 PM
View PCD Project Manager
12/1/2023 3:49:20 PM
SDP comments 12/1/2023 3:49:20 PM
View PCD Engineering Division
11/30/2023 6:03:29 PM
Engineering Review Ver.2

Please see engineering review comments on the following documents

SDP_V2 To be uploaded by the PCD Planner
TIS_V2 Attached.

This area of disturbance will require an ESQCP permit, FDR, Grading & Erosion Control Plan and additional engineering and stormwater documents prepared by a CO licensed engineer. Water quality and detention will be required for this project. These documents will be required to be submitted with the full Site Development Plan submission application.
Road Impact fees are applicable.
A commercial driveway access permit will be required. Apply through EDARP under Initiate a Minor Application for PRI/SEC roadside ditch driveway access point.

Thank you

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/ 10/26/2023 8:09:51 PM
11/30/2023 6:03:29 PM
Upper Black Squirrel Creek GWMD
11/8/2023 2:16:55 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. Thank you. 11/8/2023 2:16:55 PM
Pikes Peak Regional Building Department
10/31/2023 11:21:14 AM
Enumerations has no comment regarding the variance of land use.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
10/31/2023 11:21:14 AM
EPC Stormwater Review
10/30/2023 1:50:16 PM
Review 1: EPC DPW Stormwater does not have comments on any of the uploaded documents.

Note: given the amount of soil disturbance and/or added imperviousness, this proposed project will require an EPC Stormwater Permit (ESQCP) and a water quality treatment facility (PBMP/PCM).

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
10/30/2023 1:50:16 PM
View EPC Environmental Services
10/30/2023 1:13:59 PM
10/30/2023 1:13:59 PM
View PCD Project Manager
10/27/2023 8:49:23 AM
Site Plan:
planning and engineering comments
10/27/2023 8:49:23 AM
View PCD Project Manager
10/27/2023 8:48:54 AM
Traffic memo:
engineering comments
10/27/2023 8:48:54 AM
View PCD Project Manager
10/27/2023 8:47:44 AM
application form:
planning comment, staff will send over the correct form to be filled out
10/27/2023 8:47:44 AM
View PCD Project Manager
10/27/2023 8:47:04 AM
Letter of intent :
planning and engineering comments
10/27/2023 8:47:04 AM
PCD Engineering Division
10/26/2023 8:09:51 PM
Engineering Review Ver.1

Please see engineering review comments on the following documents
Documents to be uploaded by the PCD Planner.

LOI_V1
SDP_V1
TIS_V1

Due to the nature and extent of engineer review comments any subsequent submittal will be treated as a first review. It is recommended that an early assistance meeting be conducted prior to any subsequent submittal.
This area of disturbance will require an ESQCP permit, Grading & Erosion Control Plan and additional engineering and stormwater documents prepared by a CO licensed engineer. Water quality and detention will be required for this project. See LOI for comments. These documents were not submitted for review and will all be under a first review when submitted.

Thank you

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
10/26/2023 8:09:51 PM