Project Manager
Scott Weeks
Status
Active
Created
5/3/2023 1:59:07 PM

View: Project Documents



Review Comments (22)

Link Agency Comment
View PCD Project Manager
9/3/2024 3:19:38 PM
See Site Plan Drawing comment from engineers 9/3/2024 3:19:38 PM
View PCD Project Manager
9/3/2024 3:18:56 PM
Upon research and thorough review of the title commitment, staff is unable to verify through past deeds or instruments that Nevada Lane is private and can closed and gated with restriction to public use. Staff will need proof through recordation, etc that there exists no easement on Nevada Lane that gives access to other properties before approving the closure of Nevada Lane for public access and use.

See engineering comments on Notice of Intent and Site Plan Drawing attached.
9/3/2024 3:18:56 PM
PCD Project Manager
9/3/2024 3:08:14 PM
Upon research and thorough review of the title commitment, staff is unable to verify through past deeds or instruments that Nevada Lane is private and can be closed to public use. Staff will need proof through recordation, etc that there exists no easement on Nevada Lane that gives access to other properties before approving the closure of Nevada Lane for public access and use. 9/3/2024 3:08:14 PM
View PCD Engineering Division
9/3/2024 1:00:18 PM
Review 2 - EPC Engineering Comments have been provided on the following documents:

- Traffic Memo (uploaded with this comment)
- Letter of Intent (to be uploaded by the project manager)
- Site Plan Drawings (to be uploaded by the project manager)

Reviewed by:
Hao Vo, PE
haovo@elpasoco.com
9/3/2024 1:00:18 PM
EPC Stormwater Review
9/3/2024 12:47:22 PM
Review 2: EPC DPW Stormwater has no further comments. Planner: no re-review necessary.

At the time of Site Development Plan phase, an ESQCP and permanent water quality facility will be required.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
9/3/2024 12:47:22 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/29/2024 2:08:59 PM
Good afternoon Scott,
Please see the attached CSU 2nd review of VA244. Comments not addressed have been added again to the Site Development Plan.
Best,

Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
8/29/2024 2:08:59 PM
View EPC Health Department
8/16/2024 4:21:19 PM
8/16/2024 4:21:19 PM
View Mountain View Electric Association, Inc.
7/23/2024 3:47:57 PM
See attached comments 7/23/2024 3:47:57 PM
View PCD Project Manager
7/23/2024 3:09:48 PM
Please see engineering comments attached to site plan drawing. 7/23/2024 3:09:48 PM
View PCD Project Manager
7/23/2024 3:08:47 PM
See engineering comments attached to Notice of Intent 7/23/2024 3:08:47 PM
PCD Project Manager
7/23/2024 3:02:53 PM
No comments. Please address all engineering comments. Application will be scheduled for PC hearing once comments are satisfied. 7/23/2024 3:02:53 PM
View PCD Engineering Division
7/23/2024 9:31:00 AM
Review 1 - EPC Engineering Comments have been provided on the following documents:

- TIS - uploaded with this comment
- Letter of Intent- to be uploaded by the project manager
- Site Development Drawing - to be uploaded by the project manager

Hao Vo, PE
haovo@elpasoco.com
7/23/2024 9:31:00 AM
Falcon School District 49
7/22/2024 2:11:20 PM
District 49 has reviewed File VA244 - Variance of Use. District 49 has no comments or concerns with the proposed variance of this property. 7/22/2024 2:11:20 PM
EPC Stormwater Review
7/22/2024 2:48:33 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by the project manager):
- Site Plan Drawing

Based on the submitted Site Plan drawings the site disturbance will result in greater than 1 acre of disturbance during construction. As a result an ESQCP and permanent water quality facility will be required. As a result, with the Site Development Plan for the project the following documents will be required: Drainage Report, ESQCP, FAE, GEC Plan, GEC Checklist, PBMP Applicability Form, SWMP, SWMP Checklist, O&M Manual, Detention Maintenance Agreement, and SDI form.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
719.339.5053
MikaylaHartford@elpasoco.com
7/22/2024 2:48:33 PM
View Colorado Springs Utilities, Dev, Svc.(includes water resources)
7/18/2024 1:19:34 PM
Good afternoon Scott,
Please see the attached CSU 1st review of VA244. Comments requested have been added to the Site Development Plan.
Best,

Matthew Alcuran, MPA| Engineering Support Specialist Sr.
Utilities Development Services | Colorado Springs Utilities
1521 South Hancock Expressway| MC 1812 | Colorado Springs, CO 80903
O: 719-668-8261 |malcuran@csu.org
7/18/2024 1:19:34 PM
PCD Administrative Notice
7/16/2024 3:42:36 PM
On 7/17/2024, PCD mailed "Notice of Application" letters to surrounding property owners within a 500-foot range (12 addresses). Copies of the notice, mailing labels, and selected range have been uploaded to the EDARP file. Cost of postage to be billed to the applicant = $8.28. PR 7/16/2024 3:42:36 PM
View EPC Environmental Services
7/16/2024 12:01:59 PM
7/16/2024 12:01:59 PM
View Falcon Fire Protection District
7/16/2024 7:40:05 AM
7/16/2024 7:40:05 AM
Colorado Springs Planning & Community Development
7/5/2024 4:15:37 PM
Parcels have contiguity on the north and east sides, if City Utilities are requested/required, annexation would be required. 7/5/2024 4:15:37 PM
Colorado Department of Transportation - Pueblo Office
7/3/2024 8:55:04 AM
We are in receipt of the above-referenced development submittal. After review of the provided documents, CDOT Staff currently has NO COMMENT pertaining to this submittal. 7/3/2024 8:55:04 AM
EPC Parks Department
7/2/2024 2:54:59 PM
El Paso County Parks and Community Services. The 2022 El Paso County Parks Master Plan shows no impacts to existing or proposed parks, trails, or open space. As such, no trail easements or park land dedications are necessary. As this is a commercial application, no regional park fees will be assessed, however an update to the EPC Land Development Code over the next year and half may or may not change this fee requirement. These comments are being provided administratively and do not require consideration by the Park Advisory Board. Thank you! 7/2/2024 2:54:59 PM
View El Paso County Conservation Dist
7/2/2024 2:11:32 PM
Please see attached .PDF for brief comments. Thanks! 7/2/2024 2:11:32 PM