Project Review Comments

Back to List


Project Name
Mariah Trail Filing No. 1
Description
Minor Final plat zoned RR-5 creating 6 acre lots and private road built to County standards. No prelim plat
Location
Parcels
5100000511 5100000511
Applicant
Wayne Anthony Custom Homes
Richie Lyon ( richie.lyon@hrgreen.com ) Richie Lyon ( richie.lyon@hrgreen.com )
EA Number
EA2329
File Number
SF2315
Project Manager
Kylie Bagley
Status
Active
Created
4/26/2023 8:41:49 AM

View: Project Documents



Review Comments (39)

Link Agency Comment
View PCD Project Manager
9/18/2023 9:00:31 AM
GEC Plan Redlines 9/18/2023 9:00:31 AM
View PCD Project Manager
9/18/2023 9:00:03 AM
GEC Checklist Redlines 9/18/2023 9:00:03 AM
View PCD Engineering Division
9/6/2023 1:17:51 PM
Final Plat comments 9/6/2023 1:17:51 PM
View PCD Engineering Division
9/5/2023 5:57:13 PM
FAE comments 9/5/2023 5:57:13 PM
View PCD Engineering Division
9/5/2023 5:56:51 PM
Construction Drawings comments 9/5/2023 5:56:51 PM
View PCD Engineering Division
9/5/2023 5:56:24 PM
Drainage Report comments 9/5/2023 5:56:24 PM
PCD Engineering Division
9/5/2023 5:53:42 PM
Review 2 comments on the following documents will be uploaded:
-Drainage report
-Construction drawings
-FAE
-Plat

Please submit a deviation request for the length of the cul-de-sac. A slot will be opened by the planner for you to upload on the re-submittal.

No additional comments on the following documents:
-Soils and geology report


reviewed by:
Carlos Hernandez & Daniel Torres
Carloshernandez@elpasoco.com & danieltorres@elpasoco.com
9/5/2023 5:53:42 PM
PCD Project Manager
9/1/2023 12:54:47 PM
Planning has comments on final plat. Final plat redlines to be uploaded by Engineering department. 9/1/2023 12:54:47 PM
County Attorney - Development Review
8/29/2023 11:02:40 AM
Form of SIA is sufficient. No further comments from County Attorney - Development Review. 8/29/2023 11:02:40 AM
EPC Stormwater Review
8/28/2023 8:37:20 AM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CD's......................(to be uploaded by PM with Development Services comments)
- Drainage Report...(to be uploaded by PM with Development Services comments)
- FAE.......................(to be uploaded by PM with Development Services comments)
- GEC Plan
- GEC Checklist

EPC DPW Stormwater comments have been resolved on the following documents:
- PBMP Applicability Form
- SWMP
- SWMP Checklist (Signature still needs to be provided)

Unresolved from Submittal 1 - Please provide the following documents upon resubmittal (the planner will send an upload request):
- ESQCP
- O&M Manual
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com

Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
8/28/2023 8:37:20 AM
View County Attorney - Water
8/8/2023 2:24:08 PM
See attached Water Supply Review and Recommendation. 8/8/2023 2:24:08 PM
View EPC Health Department
7/21/2023 2:39:58 PM
7/21/2023 2:39:58 PM
View Parks Advisory Board
7/17/2023 11:40:25 AM
El Paso County Parks and Community Services Final Comments - Please See Attached Documents (PAB Endorsed 07/12/2023) 7/17/2023 11:40:25 AM
View PCD Project Manager
7/12/2023 9:03:22 AM
Construction Drawing Redlines 7/12/2023 9:03:22 AM
View EPC Parks Department
7/5/2023 3:12:36 PM
El Paso County Parks and Community Services Preliminary Comments - Please See Attached Documents (To be presented to the EPC Park Advisory Board for endorsement 07/12/23) 7/5/2023 3:12:36 PM
View PCD Project Manager
7/5/2023 2:30:58 PM
Soils and geology report 7/5/2023 2:30:58 PM
View PCD Project Manager
7/5/2023 2:29:59 PM
Pavement Design 7/5/2023 2:29:59 PM
View PCD Project Manager
7/5/2023 2:29:40 PM
Financial Assurance Forms 7/5/2023 2:29:40 PM
View PCD Project Manager
7/5/2023 2:29:16 PM
Final Drainage Report 7/5/2023 2:29:16 PM
View PCD Project Manager
7/5/2023 2:24:53 PM
Final Plat Redlines 7/5/2023 2:24:53 PM
View PCD Project Manager
7/5/2023 2:23:59 PM
Letter of Intent Redlines 7/5/2023 2:23:59 PM
View Colorado Division of Water Resources
6/29/2023 4:22:54 PM
6/29/2023 4:22:54 PM
Colorado Geological Survey
6/28/2023 3:36:27 PM
As requested by El Paso County, the Colorado Geological Survey (CGS) has reviewed the application for Mariah Trail Filing No 1 (located 39.1133, -104.7171). Available referral documents include a Geology and Soils Evaluation Report, Proposed Mariah Trail Subdivision, Filing No. 1, El Paso County, Colorado (VIVID Project No.: D23-2-587, March 21, 2023). CGS concurs in general with VIVID’s geologic interpretation, identification of hazards and constraints posed by the geology, and recommended mitigation for these conditions. Provided their recommendations are strictly adhered to in the development of this subdivision, CGS has no objection to its approval.
Submitted 6/28/2023 by Jonathan R. Lovekin, Senior Engineering Geologist, Colorado Geological Survey: jlovekin@mines.edu
6/28/2023 3:36:27 PM
Pikes Peak Regional Building Department
6/28/2023 8:12:27 AM
1. An address change to 19275 Mariah Trail will need to occur when the approved development plan is submitted for addressing.
2. Have the existing permitted structures on Lot 1 been removed? If they are to remain, the address of 19205 Mariah Trail will also need to have an address change
3. It is the developer's responsibility to notify any property owner that their address will change due to the new subdivision. It is required that any documentation sent to the property owners be sent to Enumeration for verification that they have been notified.
4. Further comments may apply once these questions are addressed.

Standard Development Plan comments:

1. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Addressing marker for lots should be front door.
2. Provide a 100 scale copy or larger of the entire APPROVED development plan (d.p.) to this department so that addressing can be assigned. Once received, the development plan will be placed on a list to be addressed. Development plans that are not yet approved may be addressed, however additional plan review fees will accrue if changes are made to the D.P. after initial addressing.

Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
6/28/2023 8:12:27 AM
View EPC Stormwater Review
6/27/2023 5:46:25 PM
SWMP 6/27/2023 5:46:25 PM
View EPC Stormwater Review
6/27/2023 5:45:35 PM
SWMP Checklist 6/27/2023 5:45:35 PM
View EPC Stormwater Review
6/27/2023 5:45:15 PM
PBMP Applicability Form 6/27/2023 5:45:15 PM
View EPC Stormwater Review
6/27/2023 5:44:56 PM
GEC Checklist 6/27/2023 5:44:56 PM
View EPC Stormwater Review
6/27/2023 5:44:19 PM
GEC Plan 6/27/2023 5:44:19 PM
PCD Engineering Division
6/26/2023 3:03:43 PM
Review 1 comments will be uploaded by the project manager for the following documents:

-Drainage report
-Construction drawings
-Fae
-Plat
-Soils and geology report
-Pavement design

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com

Gilbert LaForce
Gilbertlaforce@elpasoco.com
6/26/2023 3:03:43 PM
View Mountain View Electric Association, Inc.
6/26/2023 12:32:00 PM
See attached comments 6/26/2023 12:32:00 PM
View County Attorney - Development Review
6/22/2023 2:22:46 PM
Applicant has used an older version of the subdivision improvements agreement. The current version is attached. Please fill it out and submit it in Word in case further edits are necessary. 6/22/2023 2:22:46 PM
EPC Stormwater Review
6/27/2023 5:40:36 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...(to be uploaded by PM with Development Services comments)
- FAE.......................(to be uploaded by PM with Development Services comments)
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal (the planner will send an upload request):
- ESQCP
- GEC Checklist (with Review 1, a duplicate of the GEC Plan was uploaded into the GEC Checklist slot)
- O&M Manual
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
6/27/2023 5:40:36 PM
US Fish Wildlife, Ecological Svcs. (USDOI, Fish & Wildlife Svc.)
6/14/2023 11:20:29 AM
Hello Kylie Bagley,

Thank you for contacting the U.S. Fish and Wildlife Service (Service). The Service has reviewed the Mariah Trail project and has no concerns with this project resulting in impacts to species listed as candidate, proposed, threatened, or endangered.

We appreciate your efforts to ensure the conservation of threatened and endangered species. Thank you for contacting us and please let me know if you have any further questions.

Sincerely,
Emily Berchem
6/14/2023 11:20:29 AM
Colorado State Forest Service
6/14/2023 8:40:27 AM
The primary wildland fuel type for this proposal is grassland with scattered trees having a low wildfire hazard potential. No special fire mitigation plans or other actions are necessary for final approval by the Colorado State Forest Service. 6/14/2023 8:40:27 AM
911 Authority - El Paso/Teller County
6/12/2023 8:24:04 AM
Comment for E911 as follows:

As indicated on the drawings, Mariah Trl is an acceptable logical continuation.

Note/Question – Will the 16’ Access Easement running through Lot 6 be sufficient in the event that the parcel to the East (19275 Mariah Trl – 5100000512) was to develop further?

Thank you
Justin
6/12/2023 8:24:04 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
6/9/2023 12:31:40 PM
CSU has no comments
MAR
6/9/2023 12:31:40 PM
View EPC Environmental Services
6/9/2023 9:39:36 AM
6/9/2023 9:39:36 AM
Colorado Parks and Wildlife
6/8/2023 10:55:02 AM
Colorado Parks and Wildlife (CPW) has reviewed the plans for the Mariah Trail Filing No. 1 in El Paso County. Colorado Parks and Wildlife (CPW) is familiar with the site. Based both on the location and type of action that has been taken CPW anticipates that the impacts to the wildlife resource from this project would be negligible.

We appreciate being given the opportunity to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
6/8/2023 10:55:02 AM