Project Name
CMD Ellicott Pump Station Site Development Plan
Description
Construction of an approximately 1,200 square foot building that will house chemical storage tanks, chemical pumps, and process piping and valving. The existing 500,000-gallon storage tank will be converted to a potable water storage tank, an additional 500,000-gallon potable water storage tank will be constructed, and site piping to and from the tanks and the existing pump station will be installed. Proposed to have less than 500 CY of fill / less than 1 acre land disturbance.
Location
Parcels
3414201027 3414201027
Applicant
JVA Inc.
Richard Hood ( rhood@jvajva.com )
(303) 565-4901
Richard Hood ( rhood@jvajva.com )
(303) 565-4901
File Number
PPR2334
Project Manager
Joe Letke
Status
Active
Created
4/25/2023 4:11:32 PM

View: Project Documents



Review Comments (16)

Link Agency Comment
EPC Stormwater Review
11/6/2023 4:03:59 PM
Review 1: EPC DPW Stormwater does not have any comments.

Note: The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
11/6/2023 4:03:59 PM
PCD Engineering Division
11/6/2023 2:44:30 PM
Engineering Review Ver.2

See CDOT Access permit requirements.

-Note Filing 2A Replat (pending submission) must reflect changes to access easement through TRACT C of Filing 3

-Filing 2A must account for changes in stormwater runoff from this development. An updated drainage letter will be required for Filing 2A Replat.

-Site Development Plan approval must be conditional on approval of Filing 2A Replat submission.

-Road Impact fees are applicable: 1265sqft Bldg CAT: PUBLIC/INSTITUTION $3,372/1000sqft = $4,265.58

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
11/6/2023 2:44:30 PM
PCD Project Manager
11/3/2023 9:38:54 AM
PCD Planning has no comments. DPW Engineering staff will update comments when completed.

Joe Letke
Planner II
joeletke@elpasoco.com
11/3/2023 9:38:54 AM
View Colorado Department of Transportation - Pueblo Office
10/11/2023 10:33:52 AM
10/11/2023 10:33:52 AM
Upper Black Squirrel Creek GWMD
10/5/2023 4:46:31 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. 10/5/2023 4:46:31 PM
EPC Stormwater Review
9/17/2023 12:42:00 PM
Review 1: EPC DPW Stormwater has no comments on this review but will review the next submittal following area of disturbance clarification.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
9/17/2023 12:42:00 PM
View PCD Engineering Division
9/14/2023 6:40:35 PM
Site Dev Plan V1 9/14/2023 6:40:35 PM
View PCD Engineering Division
9/14/2023 6:31:56 PM
Letter of Intent V1 9/14/2023 6:31:56 PM
PCD Engineering Division
9/14/2023 6:42:57 PM
Engineering Review Ver.1

Please see engineering review comments on the following documents

Letter of Intent_V1
Site Plan-V1
PBMP Form- Not Complete. Needs signature and stamp.

Note if a replat of the parcels/tracts is pending the SDP cannot be approved until the replat is complete.

Thank you

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
9/14/2023 6:42:57 PM
View PCD Project Manager
9/13/2023 4:06:02 PM
Lighting plan redlines 9/13/2023 4:06:02 PM
View PCD Project Manager
9/13/2023 4:05:37 PM
Landscape Plan drawings redlines 9/13/2023 4:05:37 PM
View PCD Project Manager
9/13/2023 4:05:01 PM
Application redlines 9/13/2023 4:05:01 PM
PCD Project Manager
9/13/2023 4:04:34 PM
The planning department has comments on the following documents:

Lighting plan redlines
Letter of intent (will be uploaded by the engineering department)
Landscape Plan redlines
Application
Site development plan (will be uploaded by the engineering department)
9/13/2023 4:04:34 PM
Pikes Peak Regional Building Department
9/11/2023 11:09:53 AM
1. The intent letter states the address of 21388 Hwy 94, this is an incorrect address. The existing tank is under 22315 Hwy 94. Plan with Regional Building department has been approved and the permit has been issued under O69293.
No further comment.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
9/11/2023 11:09:53 AM
View El Paso County Conservation Dist
9/5/2023 9:12:35 PM
Brief comments attached as a .PDF. 9/5/2023 9:12:35 PM
Cherokee Metro Dist
8/31/2023 2:55:04 PM
Approved 8/31/2023 2:55:04 PM