- Project Name
- CMD Ellicott Pump Station Site Development Plan
- Description
- Construction of an approximately 1,200 square foot building that will house chemical storage tanks, chemical pumps, and process piping and valving. The existing 500,000-gallon storage tank will be converted to a potable water storage tank, an additional 500,000-gallon potable water storage tank will be constructed, and site piping to and from the tanks and the existing pump station will be installed. Proposed to have less than 500 CY of fill / less than 1 acre land disturbance.
- Location
- Parcels
- 3414201027 3414201027
- Applicant
-
JVA Inc.
Richard Hood ( rhood@jvajva.com )
(303) 565-4901 Richard Hood ( rhood@jvajva.com )
(303) 565-4901 - File Number
- PPR2334
- Project Manager
- Joe Letke
- Status
- Active
- Created
- 4/25/2023 4:11:32 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
11/6/2023 4:03:59 PM |
Review 1: EPC DPW Stormwater does not have any comments. Note: The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction. Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
11/6/2023 4:03:59 PM | |
PCD Engineering Division
11/6/2023 2:44:30 PM |
Engineering Review Ver.2 See CDOT Access permit requirements. -Note Filing 2A Replat (pending submission) must reflect changes to access easement through TRACT C of Filing 3 -Filing 2A must account for changes in stormwater runoff from this development. An updated drainage letter will be required for Filing 2A Replat. -Site Development Plan approval must be conditional on approval of Filing 2A Replat submission. -Road Impact fees are applicable: 1265sqft Bldg CAT: PUBLIC/INSTITUTION $3,372/1000sqft = $4,265.58 Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
11/6/2023 2:44:30 PM | |
PCD Project Manager
11/3/2023 9:38:54 AM |
PCD Planning has no comments. DPW Engineering staff will update comments when completed. Joe Letke Planner II joeletke@elpasoco.com |
11/3/2023 9:38:54 AM | |
View |
Colorado Department of Transportation - Pueblo Office
10/11/2023 10:33:52 AM |
10/11/2023 10:33:52 AM | |
Upper Black Squirrel Creek GWMD
10/5/2023 4:46:31 PM |
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on future submittals. | 10/5/2023 4:46:31 PM | |
EPC Stormwater Review
9/17/2023 12:42:00 PM |
Review 1: EPC DPW Stormwater has no comments on this review but will review the next submittal following area of disturbance clarification. Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
9/17/2023 12:42:00 PM | |
View |
PCD Engineering Division
9/14/2023 6:40:35 PM |
Site Dev Plan V1 | 9/14/2023 6:40:35 PM |
View |
PCD Engineering Division
9/14/2023 6:31:56 PM |
Letter of Intent V1 | 9/14/2023 6:31:56 PM |
PCD Engineering Division
9/14/2023 6:42:57 PM |
Engineering Review Ver.1 Please see engineering review comments on the following documents Letter of Intent_V1 Site Plan-V1 PBMP Form- Not Complete. Needs signature and stamp. Note if a replat of the parcels/tracts is pending the SDP cannot be approved until the replat is complete. Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
9/14/2023 6:42:57 PM | |
View |
PCD Project Manager
9/13/2023 4:06:02 PM |
Lighting plan redlines | 9/13/2023 4:06:02 PM |
View |
PCD Project Manager
9/13/2023 4:05:37 PM |
Landscape Plan drawings redlines | 9/13/2023 4:05:37 PM |
View |
PCD Project Manager
9/13/2023 4:05:01 PM |
Application redlines | 9/13/2023 4:05:01 PM |
PCD Project Manager
9/13/2023 4:04:34 PM |
The planning department has comments on the following documents: Lighting plan redlines Letter of intent (will be uploaded by the engineering department) Landscape Plan redlines Application Site development plan (will be uploaded by the engineering department) |
9/13/2023 4:04:34 PM | |
Pikes Peak Regional Building Department
9/11/2023 11:09:53 AM |
1. The intent letter states the address of 21388 Hwy 94, this is an incorrect address. The existing tank is under 22315 Hwy 94. Plan with Regional Building department has been approved and the permit has been issued under O69293. No further comment. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
9/11/2023 11:09:53 AM | |
View |
El Paso County Conservation Dist
9/5/2023 9:12:35 PM |
Brief comments attached as a .PDF. | 9/5/2023 9:12:35 PM |
Cherokee Metro Dist
8/31/2023 2:55:04 PM |
Approved | 8/31/2023 2:55:04 PM |