Project Review Comments
- Project Name
- Eastonville 8" water line
- Description
- Construction drawing review to install 5,540 LF of 8" PVC watermain along the west side of Eastonville Road within an easement outside of the right-of-way. The scope does not include any change of grade or grading operations. The watermain will begin at an existing 8" tee near the northeast corner of Meridian Ranch and run north along Eastonville to 10 ft north of the north right-of-way line of Latigo Blvd. The intent is to connect two existing well sites to the existing Meridian Ranch infrastructure.
- Location
- Parcels
- 4200000345 4200000345 4200000352 4200000352
- Applicant
-
Meridian Ranch
Tom Kerby ( tom@meridianranch.com )
(719) 495-7444 Tom Kerby ( tom@meridianranch.com )
(719) 495-7444 - File Number
- CDR2310
- Project Manager
- Ryan Howser
- Status
- Closed
- Created
- 3/28/2023 9:36:08 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
6/27/2023 3:58:15 PM |
Planning Division has no comments. | 6/27/2023 3:58:15 PM | |
PCD Engineering Division
6/26/2023 9:23:25 AM |
Engineer Review Ver.2 No further engineer comments. Comments resolved on the following documents. CDs Ver2 FAE Ver2 Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 |
6/26/2023 9:23:25 AM | |
EPC Stormwater Review
6/26/2023 4:28:19 PM |
Review 2: EPC DPW Stormwater comments have been resolved on the following documents: - CDs - ESQCP - FAE - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist EPC DPW Stormwater has no further comments. Planner: no re-review necessary. Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
6/26/2023 4:28:19 PM | |
View |
PCD Project Manager
4/20/2023 8:14:01 AM |
SWMP (includes Stormwater) | 4/20/2023 8:14:01 AM |
View |
PCD Project Manager
4/20/2023 8:13:42 AM |
SWMP Checklist (includes Stormwater) | 4/20/2023 8:13:42 AM |
View |
PCD Project Manager
4/20/2023 8:13:30 AM |
PBMP (includes Stormwater) | 4/20/2023 8:13:30 AM |
View |
PCD Project Manager
4/20/2023 8:13:11 AM |
GEC Checklist (includes Stormwater) | 4/20/2023 8:13:11 AM |
View |
PCD Project Manager
4/20/2023 8:12:55 AM |
FAE (includes Engineering and Stormwater) | 4/20/2023 8:12:55 AM |
View |
PCD Project Manager
4/20/2023 8:12:33 AM |
ESQCP (includes Stormwater) | 4/20/2023 8:12:33 AM |
View |
PCD Project Manager
4/20/2023 8:12:16 AM |
CDs (includes Engineering and Stormwater) | 4/20/2023 8:12:16 AM |
PCD Engineering Division
4/18/2023 3:18:13 PM |
Engineer Review Ver.1 Please see engineer comments on the following review documents PCD Planner to update review docs. CDs Ver1 FAE Ver1 Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
4/18/2023 3:18:13 PM | |
EPC Stormwater Review
4/19/2023 1:49:10 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by Project Manager): - CDs - ESQCP - FAE - GEC Checklist - SWMP - SWMP Checklist - PBMP Applicability Form Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
4/19/2023 1:49:10 PM |