Project Review Comments
- Project Name
- 16850 Steppler Road - Rezone
- Description
- rezone from rr-5 to rr-2.5 (36.38 acres)
- Location
- Parcels
- 6100000485 6100000485
- Applicant
-
Kimley Horn & Associates
Noah Brehmer ( noah.brehmer@kimley-horn.com )
(719) 284-7297 Noah Brehmer ( noah.brehmer@kimley-horn.com )
(719) 284-7297 - EA Number
- EA2313
- File Number
- P233
- Project Manager
- Ashlyn Mathy
- Status
- Closed
- Created
- 3/15/2023 7:51:48 AM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
8/8/2023 8:18:40 AM |
No further reviews. All comments addressed. 9/7 and 9/28 hearing schedule. | 8/8/2023 8:18:40 AM | |
PCD Engineering Division
8/7/2023 5:18:50 PM |
Engineering Review Ver.3 No further engineering comments. Comments resolved on the following documents. TIS V3 Rezone Map V3 A Driveway access permit will be required for the existing driveway to Steppler Road Note: a transportation memorandum will be required with the subdivision application to finalize details with the proposed design. Thank you. Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
8/7/2023 5:18:50 PM | |
PCD Project Manager
7/31/2023 1:27:29 PM |
Please make the property line of subject property SOLID black line. no more comments. |
7/31/2023 1:27:29 PM | |
PCD Engineering Division
7/28/2023 1:30:33 PM |
Engineering Review 2: Traffic Memorandum comments: 1. Provide developer's signature and date. 2. Add a statement that at the time of subdivision an analysis of this subdivision's fair share contribution for the paving of Steppler Road will be provided as the adjacent subdivisions, Abert Ranch and Settlers View have each provided fair share contributions. (bottom of page 7 and mention in Conclusions, preferably) Note: a transportation memorandum will be required with the subdivision application to finalize details with the proposed design. Reviewed by: Jeff Rice 719-520-7877 |
7/28/2023 1:30:33 PM | |
Colorado Springs Airport Advisory Commission
6/21/2023 8:47:23 AM |
Please disregard previous comments from the Airport as this is outside the Commercial Airport Overlay. | 6/21/2023 8:47:23 AM | |
View |
El Paso County Conservation Dist
6/19/2023 11:53:19 AM |
Late comments added with our apologies. | 6/19/2023 11:53:19 AM |
Colorado Springs Airport Advisory Commission
6/14/2023 4:24:01 PM |
Airport Staff presented to Airport Advisory Commission with the below on May 24, 2023 with no objections.. Airport staff recommends no objection with the following conditions: • Avigation Easement: An avigation easement is requested or provide proof of previous recording (book/page or reception number). • Accident Potential Zone 2: The proposed development is within the Accident Potential Zone 2 (APZ-2) subzone of the Commercial Airport Overlay District, as adopted by El Paso County. The proposed use associated with this development is permissible in the APZ-2 subzone. • Airport Acknowledgement: Upon accepting residency within Eastwood Village, all adult residents and occupants shall be required to sign a notice in which the tenant acknowledges that Eastwood Village lies within an Airport Overlay Zone and is located less than 3 miles from Colorado Springs Municipal Airport and may, at times (24 hours per day), experience noise and other activities and operations associated with aircraft and the Airport. • Noise: Although it appears that the proposed development will be located outside of the 65 DNL noise contour, the developer is encouraged to work with the airport for noise mitigation measures and procedures. The developer should notify tenants of potential noise impacts in their lease agreement, or wherever appropriate, to ensure all future tenants are made aware of noise impacts associated with aircraft overflight. • FAA Form 7460-1: Based on elevation data and distance to runway, the applicant will need to file Federal Aviation Administration (FAA) Form 7460-1 “Notice of Proposed Construction or Alteration” for any new vertical development at this site, including temporary construction equipment, and provide FAA documentation to the Airport before the commencement of construction activities; FAA’s website (https://oeaaa.faa.gov/oeaaa/external/portal.jsp). |
6/14/2023 4:24:01 PM | |
Tri-Lakes-Monument Fire Protection District
6/7/2023 2:33:20 PM |
No comments to the proposal as submitted. | 6/7/2023 2:33:20 PM | |
View |
PCD Engineering Division
6/5/2023 2:54:37 PM |
Settlers Ranch TIS from PCD File SF1512 for your use | 6/5/2023 2:54:37 PM |
View |
PCD Project Manager
6/5/2023 2:39:13 PM |
zoning map comments | 6/5/2023 2:39:13 PM |
View |
PCD Project Manager
6/5/2023 2:38:15 PM |
notice of mineral owners comment | 6/5/2023 2:38:15 PM |
View |
PCD Engineering Division
6/5/2023 2:57:09 PM |
TIS redlines | 6/5/2023 2:57:09 PM |
View |
PCD Engineering Division
6/5/2023 2:41:30 PM |
Letter of Intent redlines | 6/5/2023 2:41:30 PM |
PCD Engineering Division
6/5/2023 2:15:58 PM |
Engineering Review Ver.1 Please see engineer review comments on the following documents -LOI V1 -Rezone Map V1 (uploaded by PM) -TIS V1 Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
6/5/2023 2:15:58 PM | |
EPC Stormwater Review
6/1/2023 12:57:10 PM |
Stormwater has no comments regarding this rezoning application. Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
6/1/2023 12:57:10 PM | |
Pikes Peak Regional Building Department
5/30/2023 8:31:41 AM |
No comment regrading this rezone. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
5/30/2023 8:31:41 AM | |
View |
EPC Parks Department
5/24/2023 3:40:40 PM |
See Parks comments attached. | 5/24/2023 3:40:40 PM |
Mountain View Electric Association, Inc.
5/23/2023 10:03:51 AM |
MVEA has no objection to the rezoning | 5/23/2023 10:03:51 AM | |
EPC Code Enforcement
5/23/2023 9:44:16 AM |
No comment/review from Code Enforcement. | 5/23/2023 9:44:16 AM | |
View |
EPC Environmental Services
5/11/2023 2:32:35 PM |
5/11/2023 2:32:35 PM |