Project Review Comments

Back to List


Project Name
Town of Ramah Wastewater System Site Development Plan
Description
Expand wastewater services to include removal of a lagoon and septic tank, and add 3 new lagoons, and a lift station 15,000gpd peak
Location
Parcels
100000088 100000088 1101107001 1101107001
Applicant
Element Engineering
Nicholaus Marcotte ( nmarcotte@elementengineering.net )
(303) 378-2969
Nicholaus Marcotte ( nmarcotte@elementengineering.net )
(303) 378-2969
File Number
PPR2325
Project Manager
Ryan Howser
Status
Closed
Created
3/10/2023 2:41:29 PM

View: Project Documents



Review Comments (56)

Link Agency Comment
PCD Engineering Division
7/2/2024 4:47:57 PM
Engineering Review Ver.8
No further engineer comments
Signed FDR received.
Engineer & SW documents routed for approval.

Thank you.

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
7/2/2024 4:47:57 PM
PCD Engineering Division
6/19/2024 5:24:40 PM
Review 7: Engineering comments have been resolved on the drainage report. Please provide Town of Ramah signature on report and return for approval.

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
6/19/2024 5:24:40 PM
View PCD Engineering Division
6/12/2024 9:08:29 AM
Drainage Report Redlines 6/12/2024 9:08:29 AM
PCD Engineering Division
6/12/2024 9:06:04 AM
Review 6: See Engineering comments on the following documents

- Drainage Report

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
6/12/2024 9:06:04 AM
EPC Stormwater Review
6/12/2024 8:27:53 AM
Review 6: EPC DPW Stormwater comments have been resolved on the following documents:
- SWMP
- SWMP Checklist

EPC DPW Stormwater has no further comments. Planner: no re-review necessary.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
6/12/2024 8:27:53 AM
View PCD Engineering Division
5/23/2024 2:43:34 PM
FAE Redlines 5/23/2024 2:43:34 PM
View PCD Engineering Division
5/23/2024 2:43:15 PM
Drainage Report Redlines 5/23/2024 2:43:15 PM
PCD Engineering Division
5/23/2024 2:42:39 PM
Review 5: See Engineering comments on the following documents

- Drainage Report
- FAE

Comments have been resolved on the Construction Drawings/GEC Plan set

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
5/23/2024 2:42:39 PM
View EPC Stormwater Review
5/21/2024 12:59:53 PM
SWMP Checklist 5/21/2024 12:59:53 PM
View EPC Stormwater Review
5/21/2024 2:35:02 PM
SWMP - Please note: Section VII.B Long Term Stormwater Management contains a statement that the project relies on an existing regional downgradient storwmater quality facilities for water quality treatment. This is not consistent with the Drainage Report Text. This item is outstanding and still needs to be addressed at the next submittal. 5/21/2024 2:35:02 PM
EPC Stormwater Review
5/21/2024 12:44:07 PM
Review 5: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- SWMP
- SWMP Checklist

EPC DPW Stormwater comments have been resolved on the following documents:
- CDs
- FAE
- PBMP Applicability Form

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
5/21/2024 12:44:07 PM
View PCD Engineering Division
4/10/2024 4:49:37 PM
FAE Redlines 4/10/2024 4:49:37 PM
View PCD Engineering Division
4/10/2024 1:34:12 PM
Construction Drawing Redlines 4/10/2024 1:34:12 PM
View PCD Engineering Division
4/10/2024 1:33:28 PM
Drainage Report Redlines 4/10/2024 1:33:28 PM
PCD Engineering Division
4/10/2024 4:44:44 PM
Review 4: See Engineering comments on the following documents

- Construction Drawings/GEC Plan
- Drainage Report

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
4/10/2024 4:44:44 PM
View EPC Stormwater Review
4/10/2024 11:37:23 AM
PBMP 4/10/2024 11:37:23 AM
EPC Stormwater Review
4/10/2024 11:31:42 AM
Review 4: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs...........(to be uploaded with Development Services comments)
- FAE...........(to be uploaded with Development Services comments)
- PBMP Applicability Form
- SWMP (A new SWMP has not been submitted, the SWMP needs to be updated and resubmitted. See comments from submittal 1 and 2 and resubmit updated SWMP)
- SWMP Checklist (See previous comments)

EPC DPW Stormwater comments have been resolved on the following documents:
- Drainage Report
- GEC Checklist

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
4/10/2024 11:31:42 AM
View EPC Stormwater Review
2/15/2024 4:53:25 PM
PBMP 2/15/2024 4:53:25 PM
View EPC Stormwater Review
2/15/2024 4:53:09 PM
GEC Checklist 2/15/2024 4:53:09 PM
View EPC Stormwater Review
2/15/2024 4:52:39 PM
FAE 2/15/2024 4:52:39 PM
View EPC Stormwater Review
2/15/2024 4:51:54 PM
Drainage Report 2/15/2024 4:51:54 PM
View EPC Stormwater Review
2/15/2024 4:51:17 PM
CDs 2/15/2024 4:51:17 PM
PCD Engineering Division
2/15/2024 12:54:00 PM
Review 3: See comments on the following documents

- Construction Drawings/GEC Plan (uploaded by the stormwater engineer)
- Drainage Report (uploaded by the stormwater engineer)
- Financial Assurance Estimate Form: (uploaded by the stormwater engineer)


Reviewed by:
Carlos Hernandez
carloshernandez@elpasoco.com

Charlene Durham, PE
charlenedurham@elpasoco.com
2/15/2024 12:54:00 PM
EPC Stormwater Review
2/15/2024 4:46:51 PM
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs......................(uploaded with Development Services comments)
- Drainage Report...(uploaded with Development Services comments)
- FAE.......................(uploaded with Development Services comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP (A new SWMP has not been submitted. See comments from submittal 1 and 2 and resubmit updated SWMP)
- SWMP Checklist (See previous comments)

EPC DPW Stormwater comments have been resolved on the following documents:
- ESQCP

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
2/15/2024 4:46:51 PM
View EPC Stormwater Review
11/30/2023 5:10:59 PM
SWMP Checklist 11/30/2023 5:10:59 PM
View EPC Stormwater Review
11/30/2023 5:10:36 PM
SWMP 11/30/2023 5:10:36 PM
View EPC Stormwater Review
11/30/2023 5:10:01 PM
PBMP 11/30/2023 5:10:01 PM
View EPC Stormwater Review
11/30/2023 5:09:44 PM
GEC Checklist 11/30/2023 5:09:44 PM
View EPC Stormwater Review
11/30/2023 5:05:36 PM
FAE 11/30/2023 5:05:36 PM
View EPC Stormwater Review
11/30/2023 5:04:55 PM
ESQCP 11/30/2023 5:04:55 PM
View EPC Stormwater Review
11/30/2023 5:02:15 PM
Drainage Report 11/30/2023 5:02:15 PM
View EPC Stormwater Review
11/30/2023 5:01:19 PM
CDs 11/30/2023 5:01:19 PM
PCD Project Manager
11/30/2023 1:48:31 PM
Planning Division has no further comments at this time. 11/30/2023 1:48:31 PM
EPC Stormwater Review
11/30/2023 5:13:00 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs......................(uploaded with Development Services comments)
- Drainage Report...(uploaded with Development Services comments)
- ESQCP
- FAE.......................(uploaded with Development Services comments)
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

EPC DPW Stormwater comments have been resolved on the following documents:
- Site Development Plan
- Geological Hazard Report


Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
11/30/2023 5:13:00 PM
PCD Engineering Division
11/30/2023 12:49:52 PM
Review 2 redline comments on the following documents will be uploaded by the stormwater engineer:
- Construction Drawings/GEC Plan: Revise minor Comments and submit with stamps and signatures.
- Drainage Report
- Financial Assurance Estimate Form: Revise minor comments and submit with owner signature.

Review 1 comments on the following documents have been resolved:
- Letter of Intent
- Geotechnical Evaluation

Reviewed by:
Carlos Hernandez
carloshernandez@elpasoco.com

Charlene Durham, PE
charlenedurham@elpasoco.com
11/30/2023 12:49:52 PM
View Colorado Department of Public Health and Environment
11/21/2023 10:13:33 AM
Please see auto responder from CDPHE. Please let us know if you have additional question. 11/21/2023 10:13:33 AM
View EPC Stormwater Review
8/1/2023 7:28:20 AM
Updated GEC Checklist Form with Comments 8/1/2023 7:28:20 AM
View EPC Stormwater Review
7/31/2023 11:57:00 AM
LOI 7/31/2023 11:57:00 AM
View EPC Stormwater Review
7/31/2023 11:56:30 AM
Geotechnical Evaluation Report 7/31/2023 11:56:30 AM
View EPC Stormwater Review
7/31/2023 11:49:14 AM
SWMP Checklist 7/31/2023 11:49:14 AM
View EPC Stormwater Review
7/31/2023 11:48:57 AM
SWMP 7/31/2023 11:48:57 AM
View EPC Stormwater Review
7/31/2023 11:48:33 AM
Site Development Plan 7/31/2023 11:48:33 AM
View EPC Stormwater Review
7/31/2023 11:45:51 AM
PBMP 7/31/2023 11:45:51 AM
View EPC Stormwater Review
7/31/2023 11:45:33 AM
Geological Hazard Report 7/31/2023 11:45:33 AM
View EPC Stormwater Review
7/31/2023 11:45:03 AM
GEC Checklist 7/31/2023 11:45:03 AM
View EPC Stormwater Review
7/31/2023 11:40:57 AM
GEC Plan 7/31/2023 11:40:57 AM
View EPC Stormwater Review
7/31/2023 11:37:12 AM
FDR 7/31/2023 11:37:12 AM
View EPC Stormwater Review
7/31/2023 11:36:54 AM
FAE 7/31/2023 11:36:54 AM
View EPC Stormwater Review
7/31/2023 11:34:30 AM
ESQCP 7/31/2023 11:34:30 AM
View EPC Stormwater Review
7/31/2023 11:34:03 AM
CDs 7/31/2023 11:34:03 AM
PCD Engineering Division
7/31/2023 9:14:00 AM
Review 1 redline comments on the following documents will be uploaded by the stormwater engineer:
- Construction Drawings
- Drainage Report
- Letter of Intent
- Site Plan
- Geotechnical Evaluation
- Financial Assurance Estimate Form

Due to the volume and complexity of comments and redlines, Staff may provide additional, more detailed comments on the next submittal.

Reviewed by:
Carlos Hernandez
carloshernandez@elpasoco.com

Charlene Durham, PE
charlenedurham@elpasoco.com
7/31/2023 9:14:00 AM
PCD Project Manager
7/28/2023 10:12:08 AM
Review #1: PCD Planning Division has comments (in green text boxes) on the following documents:
- Site Development Plan

Comments will be uploaded by Engineering or Stormwater.
7/28/2023 10:12:08 AM
Mountain View Electric Association, Inc.
7/25/2023 1:10:45 PM
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. If electric services are needed, please contact our office. 7/25/2023 1:10:45 PM
EPC Stormwater Review
7/31/2023 11:31:52 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs.......................(uploaded with Development Services comments)
- Drainage Report...(uploaded with Development Services comments)
- ESQCP
- FAE.......................(uploaded with Development Services comments)
- GEC Plan...............(uploaded with Development Services comments)
- GEC Checklist
- Geological Hazard Report...............(uploaded with Development Services comments)
- PBMP Applicability Form
- Site Development...............(uploaded with Development Services comments)
- SWMP
- SWMP Checklist

Due to the volume or complexity of the comments provided, these comments are preliminary in nature and EPC DPW Stormwater reserves the right to make additional comments. Additional detailed comments will be provided upon receipt of complete information/plans and resolution of the major issues. Please feel free to call if you have any questions regarding this review.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
7/31/2023 11:31:52 AM
Pikes Peak Regional Building Department
7/21/2023 1:43:51 PM
Enumerations does not address anything in the Town of Ramah. Please contact the Town of Ramah regarding an address assignment for the lift station to provide to Mountain View Electric.

Becky Allen
PPRBD Enumerations
7/21/2023 1:43:51 PM
Colorado Department of Transportation - Pueblo Office
7/12/2023 1:18:28 PM
Any new utilities geotechnical borings or traffic control within CDOT Right-of-Way must have a special use or utility permit.

https://www.codot.gov/business/permits/utilitiesspecialuse

Permit Writers Contact
Gabe Martinez
5615 Wills Blvd., Suite A
Pueblo, CO 81008
719-562-5519
gabrielj.martinez@state.co.us
7/12/2023 1:18:28 PM