Project Review Comments

Back to List


Project Name
Eagleview Drainage Improvements
Description
SP-21-006 for preliminary plan file number and SF-22-042 for final plat file
Location
Parcels
5226000001 5226000001 5226000002 5226000002
Applicant
Kimley-Horn and Associates, Inc.
Kevin Kofford ( kevin.kofford@kimley-horn.com )
(719) 453-0181
Kevin Kofford ( kevin.kofford@kimley-horn.com )
(719) 453-0181
EA Number
EA2186
File Number
CDR238
Project Manager
Ryan Howser
Status
Closed
Created
2/22/2023 8:02:34 AM

View: Project Documents



Review Comments (13)

Link Agency Comment
View EPC Stormwater Review
4/4/2023 2:09:29 PM
SWMP 4/4/2023 2:09:29 PM
View EPC Stormwater Review
4/4/2023 2:07:09 PM
SWMP Checklist 4/4/2023 2:07:09 PM
View EPC Stormwater Review
4/4/2023 2:06:53 PM
PBMP Applicability Form 4/4/2023 2:06:53 PM
View EPC Stormwater Review
4/4/2023 2:06:38 PM
GEC Checklist 4/4/2023 2:06:38 PM
View EPC Stormwater Review
4/4/2023 1:54:51 PM
GEC Plan 4/4/2023 1:54:51 PM
View EPC Stormwater Review
4/4/2023 1:54:07 PM
FAE 4/4/2023 1:54:07 PM
View EPC Stormwater Review
4/4/2023 1:53:49 PM
ESQCP 4/4/2023 1:53:49 PM
View EPC Stormwater Review
4/4/2023 1:26:34 PM
Drainage Report 4/4/2023 1:26:34 PM
View EPC Stormwater Review
4/4/2023 1:25:09 PM
CDs 4/4/2023 1:25:09 PM
PCD Engineering Division
4/4/2023 10:03:35 AM
Review #1: Redline comments on the following documents will be uploaded by the Stormwater Engineer:
- Final Drainage Report
- Grading and Erosion Control Plan
- Construction Drawings
- Financial Assurance Estimate

FYI: Since the Financial Assurance Estimate for the channel improvements has been separated out with this project (CDR238) then make sure to remove these items in the FAE submitted with SF2242. Each FAE will need it's own separate collateral for ease of tracking on future partial releases.

Reviewed by:
Gilbert LaForce, PE
gilbertlaforce@elpasoco.com
4/4/2023 10:03:35 AM
PCD Project Manager
3/30/2023 7:33:01 AM
Planning Division has no comments at this time. 3/30/2023 7:33:01 AM
EPC Stormwater Review
4/4/2023 12:56:03 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs
- Drainage Report
- ESQCP
- FAE (Gilbert's blue comments only)
- GEC Plan
- GEC Checklist
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Note: Comments from SF2242 were copied over to plans and reports where applicable. Ensure all material that moved from SF2242 to CDR238 had previous comments addressed.

Please provide the following documents upon resubmittal for Pond SR1 (the planner will send an upload request):
- Detention Maintenance Agreement
- MS4 Post-Construction Form
- O&M Manual

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com

Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
4/4/2023 12:56:03 PM
Colorado Department of Transportation - Pueblo Office
3/10/2023 10:15:03 AM
CDOT has no comments. 3/10/2023 10:15:03 AM