Project Review Comments
- Project Name
- Lewis Palmer Middle School parking lot restriping
- Description
- Project downgraded to a Commercial Over the Counter per Gilbert LaForce; less than 1 acre of disturbance.
- Location
- Parcels
- 7111304063 7111304063
- Applicant
-
Felsburg Holt & Ullevig
Steve Bodette ( steve.bodette@fhueng.com )
(719) 314-1800 Steve Bodette ( steve.bodette@fhueng.com )
(719) 314-1800 - File Number
- CDR235
- Project Manager
- Kylie Bagley
- Status
- Closed
- Created
- 2/9/2023 1:17:59 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
EPC Stormwater Review
10/18/2023 8:05:44 AM |
EPC DPW Stormwater has no comments on this review. The proposed area of disturbance is less than 1 acre, therefore an ESQCP is not required. If the area of disturbance exceeds 1 acre at any time, all work must be stopped and an ESQCP must be obtained in order to resume construction. Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
10/18/2023 8:05:44 AM | |
PCD Project Manager
10/17/2023 12:30:03 PM |
Planning department has no comments at this time | 10/17/2023 12:30:03 PM | |
PCD Engineering Division
10/18/2023 1:46:58 PM |
Engineering has no comments. Engineering documents submitted will be accepted for file. Reviewed by: Carlos Hernandez Daniel Torres P.E. carloshernandez@elpasoco.com danieltorres@elpasoco.com |
10/18/2023 1:46:58 PM | |
PCD Engineering Division
6/29/2023 9:00:36 AM |
Previous review comments on the TIS have been resolved. Any approved documents will be uploaded by the project manager. Please note construction drawings and deviation requests will be required to be submitted for review prior to construction. Reviewed by: Carlos Hernandez Daniel Torres carloshernandez@elpasoco.com danieltorres@elpasoco.com |
6/29/2023 9:00:36 AM | |
PCD Engineering Division
3/21/2023 5:08:34 PM |
Review 1: See comments provided on the attached Traffic Impact Study redlines. Reviewed by: Carlos Hernandez Daniel Torres Review Engineer carloshernandez@elpasoco.com danieltorres@elpasoco.com |
3/21/2023 5:08:34 PM | |
View |
PCD Engineering Division
3/21/2023 5:09:03 PM |
Traffic Study redlines | 3/21/2023 5:09:03 PM |