Project Review Comments
- Project Name
- Crawford Avenue Site Dev. Plan
- Description
- site development plan to property
- Location
- Parcels
- 6513125009 6513125009
- Applicant
-
Kimley-Horn
Larry Salazar ( larry.salazar@kimley-horn.com )
(719) 284-7829 Larry Salazar ( larry.salazar@kimley-horn.com )
(719) 284-7829 - File Number
- PPR2257
- Project Manager
- Ashlyn Mathy
- Status
- Active
- Created
- 11/1/2022 2:44:30 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
12/27/2023 10:55:37 AM |
SF235 is not approved thus the PPR2257 will not be approved until the plat goes through the approval process. -Ashlyn Mathy |
12/27/2023 10:55:37 AM | |
View |
PCD Project Manager
12/12/2023 2:53:11 PM |
SDP minor comments | 12/12/2023 2:53:11 PM |
View |
PCD Project Manager
11/21/2023 8:56:55 AM |
sign plan comment | 11/21/2023 8:56:55 AM |
View |
PCD Project Manager
11/21/2023 8:55:13 AM |
landscaping plan comments | 11/21/2023 8:55:13 AM |
View |
PCD Project Manager
11/21/2023 8:54:43 AM |
lighting plan comment | 11/21/2023 8:54:43 AM |
View |
PCD Project Manager
11/21/2023 8:54:20 AM |
SDP comment | 11/21/2023 8:54:20 AM |
PCD Engineering Division
11/20/2023 1:08:44 PM |
Comments have been resolved. The project manager will upload any approved documents. Reviewed By: Lupe Packman lupepackman@elpasoco.com |
11/20/2023 1:08:44 PM | |
EPC Stormwater Review
11/20/2023 10:05:14 AM |
Review 3: EPC DPW Stormwater has no further comments. Planner: no re-review necessary. EPC DPW Stormwater comments have been resolved on the following documents: - Drainage Report - GEC Plan - Site Development Plan Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
11/20/2023 10:05:14 AM | |
View |
EPC Stormwater Review
9/26/2023 8:58:49 AM |
Site Development Plan (with Stormwater Comments) | 9/26/2023 8:58:49 AM |
View |
EPC Stormwater Review
9/26/2023 8:57:09 AM |
GEC Plan | 9/26/2023 8:57:09 AM |
View |
EPC Stormwater Review
9/26/2023 8:56:42 AM |
Drainage Report | 9/26/2023 8:56:42 AM |
View |
PCD Project Manager
9/22/2023 8:58:52 AM |
SDP comments | 9/22/2023 8:58:52 AM |
View |
PCD Project Manager
9/22/2023 8:58:32 AM |
lighting plan comments | 9/22/2023 8:58:32 AM |
View |
PCD Project Manager
9/22/2023 8:58:00 AM |
lighting plan height comments | 9/22/2023 8:58:00 AM |
View |
PCD Project Manager
9/22/2023 8:57:37 AM |
landscape plans - unresolved comment | 9/22/2023 8:57:37 AM |
View |
PCD Project Manager
9/22/2023 8:56:51 AM |
FAE comment | 9/22/2023 8:56:51 AM |
PCD Engineering Division
9/21/2023 3:44:37 PM |
Review 2: Please refer to the final plat application SF235 for comments on the following documents: FDR V2 Please sign and stamp with engineer and owner. FAE V2 Please sign and stamp with engineer and owner. TIS V2 Please have owner sign. ESQCP V2 Please have owner sign. GEC Plan V2 Please have engineer sign/stamp all pages and owner sign. Review 2 comments on the following documents will be uploaded by the project manager: -Site Development Plan Reviewed by: Daniel Torres danieltorres@elpasoco.com |
9/21/2023 3:44:37 PM | |
EPC Stormwater Review
9/26/2023 7:41:54 AM |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report - GEC Plan - Site Development Plan EPC DPW Stormwater comments have been resolved on the following documents: - SWMP Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
9/26/2023 7:41:54 AM | |
View |
EPC Health Department
5/26/2023 5:18:59 PM |
5/26/2023 5:18:59 PM | |
View |
Widefield SD 3
5/16/2023 2:57:17 PM |
5/16/2023 2:57:17 PM | |
View |
EPC Stormwater Review
5/15/2023 2:35:20 PM |
SWMP Checklist | 5/15/2023 2:35:20 PM |
View |
EPC Stormwater Review
5/15/2023 2:34:51 PM |
SWMP | 5/15/2023 2:34:51 PM |
View |
EPC Stormwater Review
5/15/2023 2:34:32 PM |
GEC Checklist | 5/15/2023 2:34:32 PM |
View |
EPC Stormwater Review
5/15/2023 2:34:13 PM |
GEC Plan | 5/15/2023 2:34:13 PM |
View |
EPC Stormwater Review
5/15/2023 2:33:45 PM |
ESQCP | 5/15/2023 2:33:45 PM |
View |
EPC Stormwater Review
5/15/2023 2:33:06 PM |
Drainage Report | 5/15/2023 2:33:06 PM |
Colorado Springs Airport Advisory Commission
5/15/2023 8:57:07 AM |
Airport staff has no additional comments to add beyond those previously provided. | 5/15/2023 8:57:07 AM | |
View |
PCD Project Manager
5/11/2023 1:46:16 PM |
Traffic study comments | 5/11/2023 1:46:16 PM |
View |
PCD Project Manager
5/11/2023 1:45:54 PM |
Lighting plan comments | 5/11/2023 1:45:54 PM |
View |
PCD Project Manager
5/11/2023 1:43:22 PM |
landscape plan comments | 5/11/2023 1:43:22 PM |
View |
PCD Project Manager
5/11/2023 1:35:28 PM |
GEC plan comments | 5/11/2023 1:35:28 PM |
View |
PCD Project Manager
5/11/2023 1:34:59 PM |
FAE form comments | 5/11/2023 1:34:59 PM |
View |
PCD Project Manager
5/11/2023 1:34:34 PM |
Drainage report comments | 5/11/2023 1:34:34 PM |
View |
PCD Project Manager
5/11/2023 1:34:12 PM |
SDP comments | 5/11/2023 1:34:12 PM |
Pikes Peak Regional Building Department
5/10/2023 10:52:45 AM |
Regarding a request for approval of a development plan for Crawford Ave. Multifamily, Enumerations has the following comments: 1. This tract does not yet have an address assigned. One will be assigned as part of the platting process which will occur along with this development plan. This address will be what needs to be used when submitting building plans for permitting. 2. The letter of intent states that there will be 2 buildings on this site. After discussing the elevations shown in this plan with our construction plans examiner it was decided that, barring any changes, this would be considered a single building. As a result, only one address will be assigned for this project, and the secondary addressing shown in the plan meets the RBD secondary addressing guidelines. Brent Johnson Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2888 E: brent@pprbd.org W: pprbd.org |
5/10/2023 10:52:45 AM | |
PCD Engineering Division
5/9/2023 4:36:33 PM |
Review 1 comments will be uploaded by the project manager for the following documents. -Drainage report -FAE -TIS -Gec Plan -Site plan Submit construction drawings that show offsite improvements per TIS. Reviewed By: Lupe Packman Review Engineer lupepackman@elpasoco.com |
5/9/2023 4:36:33 PM | |
EPC Stormwater Review
5/15/2023 2:21:02 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...............(with Stormwater Comments) - ESQCP - GEC Plan...............(with Stormwater Comments) - GEC Checklist - SWMP - SWMP Checklist Reviewed by: Mikayla Hartford Stormwater Engineer I MikaylaHartford@elpasoco.com |
5/15/2023 2:21:02 PM | |
View |
EPC Parks Department
5/9/2023 8:06:32 AM |
See final Parks comments attached. | 5/9/2023 8:06:32 AM |
Colorado Department of Transportation - Pueblo Office
5/1/2023 1:40:00 PM |
CDOT has no comments regarding this development. | 5/1/2023 1:40:00 PM | |
View |
EPC Environmental Services
4/28/2023 10:16:19 AM |
4/28/2023 10:16:19 AM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
4/27/2023 2:49:49 PM |
Ensure trees are outside all side lot utility easements. | 4/27/2023 2:49:49 PM |