Project Review Comments

Back to List


Project Name
CDR Marksheffel (Sterling Ranch Fil 4) and Vollmer restriping
Description
Restriping of Vollmer south of Marksheffel and Construction of Marksheffel through Sterling Ranch Filing no. 4
Location
Applicant
JR Engineering
Mike Bramlett ( mbramlett@jrengineering.com )
(303) 267-6240
Mike Bramlett ( mbramlett@jrengineering.com )
(303) 267-6240
EA Number
EA21115
File Number
CDR2219
Project Manager
Kari Parsons
Status
Closed
Created
10/18/2022 4:18:07 PM

View: Project Documents



Review Comments (17)

Link Agency Comment
View PCD Engineering Division
8/25/2023 2:10:03 PM
Engineering has the following comments:

See comment memo (link at left) for reference.

The Filing 4 Grading and Erosion Control Plan needs to be resubmitted with the developer's signature.

-- Jeff Rice - 719-520-7877
8/25/2023 2:10:03 PM
View PCD Engineering Division
5/25/2023 8:10:20 AM
Engineering has the following comments:

See comment memo (link at left) and redlines.

The following items need to be revised and resubmitted:
- Final Drainage Report, with signatures
- Construction Drawings including MK2 Storm drain profile and Grading and Erosion Control Plan
- Vollmer Striping plan - Sheet 4 only
- FAE (County GEC), signed
- Other Stormwater items, if not approved with Filing 4


-- Jeff Rice - 719-520-7877
5/25/2023 8:10:20 AM
Mountain View Electric Association, Inc.
5/23/2023 8:55:53 AM
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. 5/23/2023 8:55:53 AM
Colorado Springs Public Works
5/17/2023 3:35:15 PM
City traffic comments were provided on ProjectDox.
Project # STM-REV23-0417 & STM-REV23-0418

Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
5/17/2023 3:35:15 PM
EPC Stormwater Review
5/25/2023 6:24:01 AM
Review 2: EPC DPW Stormwater comments have been resolved on the following documents:
- CDs
- ESQCP
- PBMP Applicability Form

EPC DPW Stormwater has no further comments. Planner: no re-review necessary.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
5/25/2023 6:24:01 AM
Colorado Springs Public Works
5/2/2023 11:21:15 AM
City traffic comments were provided on ProjectDox.
Project # STM-REV23-0417 & STM-REV23-0418

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
5/2/2023 11:21:15 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/1/2023 11:09:07 AM
Only recommendation is to reach out to field engineering to discuss design/cost of gas service line. (719)668-4985 5/1/2023 11:09:07 AM
View PCD Engineering Division
1/17/2023 4:45:41 PM
(Vollmer Striping CD redlines) (same as those with Filing 4) 1/17/2023 4:45:41 PM
View PCD Engineering Division
1/17/2023 4:47:35 PM
(Marksheffel CD redlines) 1/17/2023 4:47:35 PM
View PCD Engineering Division
1/17/2023 4:39:21 PM
PCD-Engineering has the following comments:

See comment memo (link at left) and redlines.

The following items need to be revised and resubmitted:
- Final Drainage Report if separated
- Construction Drawings including Grading and Erosion Control Plan
- Vollmer Striping plan and City concurrence
- FAE (County Section 1)
- FAE (City costs)
- Other Stormwater items


-- Jeff Rice - 719-520-7877
1/17/2023 4:39:21 PM
View EPC Stormwater Review
1/11/2023 1:30:09 PM
ESQCP 1/11/2023 1:30:09 PM
View EPC Stormwater Review
1/11/2023 11:48:18 AM
PBMP Applicability Form 1/11/2023 11:48:18 AM
EPC Stormwater Review
1/11/2023 1:29:21 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs....(to be uploaded by PM with PCD comments)
- ESQCP
- PBMP Applicability Form

Besides that, I have no additional comments on the other submitted documents besides those comments that I already uploaded to EDARP with SF2230.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
1/11/2023 1:29:21 PM
Colorado Springs Public Works
12/29/2022 8:32:39 AM
Submit the Marksheffel Rd. construction plans to Engineering Development Review and Traffic Engineering separately in Project Dox. These plans must be reviewed and approved by the City prior to construction.

Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
12/29/2022 8:32:39 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
12/22/2022 12:52:16 PM
Utilities Development Services has no comment on this application. CSU, on the other hand, has existing infrastructure near and within this parcel of land. The applicant will be responsible for any damage, removal, or relocation of facilities. Call 719-668-4985.

Corey Masoumi - cmasoumi@csu.org
12/22/2022 12:52:16 PM
Mountain View Electric Association, Inc.
12/14/2022 11:28:35 AM
The Association has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. 12/14/2022 11:28:35 AM
Colorado Springs Public Works
12/14/2022 11:11:03 AM
Please follow Figure 6 on Page 14 of the city of Colorado Springs Traffic Engineering Criteria Manual for median opening design of Marksheffel Road/ Sterling Ranch Road intersection.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
12/14/2022 11:11:03 AM