Agency | Comment | ||
---|---|---|---|
View |
PCD Engineering Division
9/12/2024 11:30:50 AM |
TIS - Rex Roundabout Report Redlines | 9/12/2024 11:30:50 AM |
View |
PCD Engineering Division
9/12/2024 11:30:23 AM |
TIS - Dawlish Roundabout Report Redlines | 9/12/2024 11:30:23 AM |
View |
PCD Engineering Division
9/12/2024 11:29:37 AM |
Financial Assurance Redlines - Segment 2 | 9/12/2024 11:29:37 AM |
View |
PCD Engineering Division
9/12/2024 11:29:18 AM |
Financial Assurance Redlines - Segment 1 | 9/12/2024 11:29:18 AM |
View |
PCD Engineering Division
9/12/2024 11:28:39 AM |
Drainage Report Redlines - Segment 2 | 9/12/2024 11:28:39 AM |
View |
PCD Engineering Division
9/12/2024 11:28:15 AM |
Drainage Report Redlines - Segment 1 | 9/12/2024 11:28:15 AM |
View |
PCD Engineering Division
9/12/2024 11:27:30 AM |
Construction Drawing Redlines - Segment 2 | 9/12/2024 11:27:30 AM |
View |
PCD Engineering Division
9/12/2024 11:18:40 AM |
Construction Drawing Redlines - Segment 1 | 9/12/2024 11:18:40 AM |
View |
PCD Engineering Division
9/12/2024 11:17:44 AM |
LOI Redlines | 9/12/2024 11:17:44 AM |
View |
PCD Engineering Division
9/12/2024 11:17:12 AM |
Review 3 DPW Development Services comments: See comment memo (link at left) and redlines. The following items need to be revised and resubmitted: - Letter of Intent - Final Drainage Reports (2) (see redlines) - Construction Drawings (2) (see redlines) - Roundabout Design Reports (2) (see redlines) - Financial Assurance Forms (2) (see redlines) Also provide the following: - Responses to redlines and comment memo - FEMA CLOMR documentation when available - License Agreements for lighting & landscaping - Detention Pond Maintenance Agreements Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com |
9/12/2024 11:17:12 AM |
View |
EPC Stormwater Review
9/12/2024 9:37:29 AM |
PBMP Applicability Form | 9/12/2024 9:37:29 AM |
View |
EPC Stormwater Review
9/12/2024 9:36:58 AM |
GEC Checklist | 9/12/2024 9:36:58 AM |
EPC Stormwater Review
9/12/2024 8:32:19 AM |
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs (Segment 1& 2).......................(to be uploaded with Development Services comments) - Drainage Report (Segment 1 &2)....(to be uploaded with Development Services comments) - FAE..................................................(to be uploaded with Development Services comments) - GEC Checklist - PBMP Applicability Form Please QC all documents for discrepancies prior to resubmittal, there were still many discrepancies with this submittal. Please provide the following documents upon resubmittal (the planner will send an upload request): - Notice of Intent to Construct a Non-Jurisdictional Water Impoundment Structure (proof of submittal only - SDI Form or MHFD_Detention Calcs (uploaded separate from the FDR) Reviewed by: Glenn Reese, P.E. Stormwater Engineer III 719-675-2654 GlennReese@elpasoco.com |
9/12/2024 8:32:19 AM | |
View |
PCD Engineering Division
4/10/2024 3:12:05 PM |
(FAE S2 redlines) | 4/10/2024 3:12:05 PM |
View |
PCD Engineering Division
4/10/2024 3:11:38 PM |
(FAE S1 redlines) | 4/10/2024 3:11:38 PM |
View |
PCD Engineering Division
4/10/2024 3:10:36 PM |
(CDs S2 redlines summary) | 4/10/2024 3:10:36 PM |
View |
PCD Engineering Division
4/10/2024 3:10:04 PM |
(CDs S2 redlines) | 4/10/2024 3:10:04 PM |
View |
PCD Engineering Division
4/10/2024 3:07:33 PM |
(CDs S1 redlines summary) | 4/10/2024 3:07:33 PM |
View |
PCD Engineering Division
4/10/2024 3:06:03 PM |
(CDs S1 redlines) | 4/10/2024 3:06:03 PM |
View |
PCD Engineering Division
4/10/2024 3:02:55 PM |
(LOI redlines) | 4/10/2024 3:02:55 PM |
View |
PCD Engineering Division
4/10/2024 3:01:58 PM |
(FDR S2 redlines summary) | 4/10/2024 3:01:58 PM |
View |
PCD Engineering Division
4/10/2024 3:01:30 PM |
(FDR S2 redlines) | 4/10/2024 3:01:30 PM |
View |
PCD Engineering Division
4/10/2024 3:00:21 PM |
(FDR S1 redlines summary) | 4/10/2024 3:00:21 PM |
View |
PCD Engineering Division
4/10/2024 2:59:41 PM |
(FDR S1 redlines) | 4/10/2024 2:59:41 PM |
View |
PCD Engineering Division
4/10/2024 2:58:36 PM |
Review 2 DPW Development Services comments: See comment memo (link at left) and redlines. The following items need to be revised and resubmitted: - Final Drainage Reports (2) (see redlines) - Construction Drawings (2) (see redlines) - Financial Assurance Forms (2) (see redlines) Also provide the following: - Responses to redlines and comment memo - FEMA CLOMR documentation when available Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com Jeff Rice, PE jeffrice@elpasoco.com |
4/10/2024 2:58:36 PM |
Mountain View Electric Association, Inc.
4/8/2024 8:23:39 AM |
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. Additional easements may apply. Please contact the Engineering Dept. if assistance is needed. | 4/8/2024 8:23:39 AM | |
EPC Stormwater Review
4/2/2024 4:19:56 PM |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs (Segment 1 only).......................(to be uploaded with Development Services comments) - Drainage Report (Segment 1 only)....(to be uploaded with Development Services comments) Note: I was unable to complete an entire review of Segment 1 or Segment 2 documents given the volume of errors, omissions, and unresolved previous comments with the submitted documents. Please review and address all previous comments from Review 1. If you have any questions, please reach out to me to discuss further, my email address is provided below. QC all documents for discrepancies prior to resubmittal. For example: the Drainage Report text must match what is shown in the calcs, drainage maps, and the CDs. Currently there are too many discrepancies for me to complete a proper review. For context: this review has taken about 2 to 3 times longer to review than a project of a similar size and scope, and I did not even review the Segment 2 docs. My comments on the Segment 1 docs are representative of those that will also need to be addressed on the Segment 2 docs. Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
4/2/2024 4:19:56 PM | |
View |
EPC Parks Department
3/6/2024 8:33:13 AM |
El Paso County Parks and Community Services Department, Final Comments - Please See Attached Document (No Park Advisory Board endorsement necessary for construction drawing reviews) | 3/6/2024 8:33:13 AM |
View |
PCD Engineering Division
2/23/2024 10:50:18 AM |
(LOI redlines) | 2/23/2024 10:50:18 AM |
View |
PCD Engineering Division
2/23/2024 10:48:12 AM |
(FAE S2 redlines) | 2/23/2024 10:48:12 AM |
View |
PCD Engineering Division
2/23/2024 10:47:51 AM |
(FAE S1 redlines) | 2/23/2024 10:47:51 AM |
View |
PCD Engineering Division
2/23/2024 10:47:20 AM |
(CDs/GEC S2 redlines summary) | 2/23/2024 10:47:20 AM |
View |
PCD Engineering Division
2/23/2024 10:46:58 AM |
(CDs/GEC S2 redlines) | 2/23/2024 10:46:58 AM |
View |
PCD Engineering Division
2/23/2024 10:46:29 AM |
(CDs/GEC S1 redlines summary) | 2/23/2024 10:46:29 AM |
View |
PCD Engineering Division
2/23/2024 10:45:32 AM |
(CDs/GEC S1 redlines) | 2/23/2024 10:45:32 AM |
View |
PCD Engineering Division
2/23/2024 10:44:50 AM |
(FDR S2 redlines summary) | 2/23/2024 10:44:50 AM |
View |
PCD Engineering Division
2/23/2024 10:44:27 AM |
(FDR S2 redlines) | 2/23/2024 10:44:27 AM |
View |
PCD Engineering Division
2/23/2024 10:43:56 AM |
(FDR S1 redlines summary) | 2/23/2024 10:43:56 AM |
View |
PCD Engineering Division
2/23/2024 10:43:26 AM |
(FDR S1 redlines) | 2/23/2024 10:43:26 AM |
View |
PCD Engineering Division
2/23/2024 10:42:53 AM |
Standard signing and striping notes | 2/23/2024 10:42:53 AM |
View |
PCD Engineering Division
2/23/2024 10:49:32 AM |
Review 1 DPW Development Services comments: See comment memo (link at left) and redlines. The following items need to be revised and resubmitted: - Final Drainage Reports (2) (see redlined pages) - Construction Drawings (2) - Financial Assurance Forms (2) (Update to 2024 form, see redlines) Also provide the following: - Responses to redlines and comment memo - USACE Permit when available - FEMA CLOMR documentation when available Reviewed by: Charlene Durham, PE charlenedurham@elpasoco.com Jeff Rice, PE jeffrice@elpasoco.com |
2/23/2024 10:49:32 AM |
View |
EPC Stormwater Review
2/21/2024 10:13:39 AM |
SWMP | 2/21/2024 10:13:39 AM |
View |
EPC Stormwater Review
2/21/2024 10:12:32 AM |
GEC Checklist | 2/21/2024 10:12:32 AM |
EPC Stormwater Review
2/21/2024 10:14:58 AM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - CDs (both segments).......................(to be uploaded with Development Services comments) - Drainage Report (both segments)....(to be uploaded with Development Services comments) - FAE (both segments)........................(to be uploaded with Development Services comments) - GEC Checklist - SWMP For the EDARP project that this project eventually gets built under, the following additional documents will need to be submitted for review: - ESQCP - GEC Checklist - Non-Jurisdictional Water Impoundment Structure Application - O&M Manual for ponds - PBMP Applicability Form - Private Detention Basin / Stormwater Quality BMP Maintenance Agreement - Soils Report - SWMP - SWMP Checklist Reviewed by: Glenn Reese, P.E. Stormwater Engineer III GlennReese@elpasoco.com |
2/21/2024 10:14:58 AM | |
Mountain View Electric Association, Inc.
2/19/2024 8:24:09 AM |
MVEA has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. Please call our office if services are needed. | 2/19/2024 8:24:09 AM | |
View |
Meridian Ranch/Meridian Service Metro Dist.
2/1/2024 9:28:22 AM |
See construction plans for comments - The detention facility at Londonderry and Eastonville is a private MSMD facility. MSMD will not accept storm flows from Eastonville into the pond. - Meridian Ranch Investments has been working with El Paso County DOT regarding the 20' additional right-of-way on the west side of Eastonville. The right-of-way acquisition must be completed prior to commencing construction. Legal exhibits uploaded with plan set - A temporary construction easement is necessary for grading operations onto Meridian Ranch Investments property. |