Project Name
Saddlehorn Ranch Filing 5 Early Grading
Description
Location
Parcels
4300000602 4300000602
Applicant
Vertex Consulting Services
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
Nina Ruiz ( nina.ruiz@vertexcos.com )
(719) 733-8606 x6606
EA Number
EA21174
File Number
EGP226
Project Manager
Ryan Howser
Status
Active
Created
9/15/2022 3:22:57 PM

View: Project Documents



Review Comments (26)

Link Agency Comment
View PCD Engineering Division
12/19/2023 3:01:33 PM
Site Grading Request Redlines 12/19/2023 3:01:33 PM
View PCD Engineering Division
12/19/2023 3:02:15 PM
The following items need to be revised and resubmitted:
- Pre-subdivision site grading Acknowledgement and ROA request form (Minor Comment)

Reminder to provide provide correspondence or permits from the State Engineer for the proposed pond embankments.

Provide final/signed copies of highlighted items shown in the engineering checklist (See Link)

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
12/19/2023 3:02:15 PM
EPC Stormwater Review
12/19/2023 1:55:55 PM
Review 4: EPC DPW Stormwater has no additional comments.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
12/19/2023 1:55:55 PM
EPC Stormwater Review
10/30/2023 3:24:11 PM
Review 3: All EPC DPW Stormwater comments have been addressed.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
10/30/2023 3:24:11 PM
View PCD Engineering Division
10/31/2023 2:36:43 PM
FDR Redlines 10/31/2023 2:36:43 PM
View PCD Engineering Division
10/30/2023 11:36:04 AM
Pre-Subdivision Site Grading Acknowledgement and ROA Request Form
-To fill out and resubmit
10/30/2023 11:36:04 AM
View PCD Engineering Division
10/30/2023 11:35:11 AM
Pre-subdivision Site Grading Request Redlines 10/30/2023 11:35:11 AM
View PCD Engineering Division
10/31/2023 2:37:35 PM
See comment memo (link at left) and redlines.

The following items need to be revised and resubmitted:
- Final Drainage Report
- Pre-subdivision site grading Acknowledgement and ROA request form
- Comment response letter -- provide written responses to address comments in the comment letter as well as redlines

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
10/31/2023 2:37:35 PM
View EPC Stormwater Review
10/9/2023 4:15:44 PM
Drainage Report_v2 10/9/2023 4:15:44 PM
View EPC Stormwater Review
10/9/2023 4:15:22 PM
Comment Response Letter_v2 10/9/2023 4:15:22 PM
View PCD Engineering Division
10/4/2023 1:37:19 PM
See comment memo (link at left) and redlines.

The following items need to be revised and resubmitted:
- Final Drainage Report (to be uploaded by Stormwater)
- Comment response letter -- provide written responses to address comments in the comment letter as well as redlines

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
10/4/2023 1:37:19 PM
EPC Stormwater Review
10/9/2023 4:17:07 PM
Review 2: All EPC DPW Stormwater comments have been addressed.

The following documents have been uploaded:
- Final Drainage Report (PCD comments only)
- Comment Response Letter (PCD comments only)

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
10/9/2023 4:17:07 PM
View PCD Engineering Division
3/21/2023 2:49:44 PM
(FAE redlines) 3/21/2023 2:49:44 PM
View PCD Engineering Division
3/21/2023 2:49:23 PM
(GEC redlines summary) 3/21/2023 2:49:23 PM
View PCD Engineering Division
3/21/2023 2:48:51 PM
(GEC redlines) 3/21/2023 2:48:51 PM
View PCD Engineering Division
3/21/2023 2:46:37 PM
(FDR redlines summary) 3/21/2023 2:46:37 PM
View PCD Engineering Division
3/21/2023 2:46:04 PM
(FDR redlines) 3/21/2023 2:46:04 PM
View PCD Engineering Division
3/21/2023 2:45:16 PM
See comment memo (link at left) and redlines.

The following items need to be revised and resubmitted:
- Final Drainage Report (see redlines and summary)
- GEC Plan (see redlines and summary)
- FAE (see redlines)
- Comment response letter -- provide written responses to address comments in the comment letter as well as redlines

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com

Jeff Rice, PE, CFM
jeffrice@elpasoco.com
3/21/2023 2:45:16 PM
PCD Project Manager
3/15/2023 5:20:48 PM
No comments from Planning Division at this time. 3/15/2023 5:20:48 PM
View EPC Stormwater Review
3/14/2023 5:24:11 PM
SWMP Checklist_v1 3/14/2023 5:24:11 PM
View EPC Stormwater Review
3/14/2023 5:23:22 PM
SWMP_v1 3/14/2023 5:23:22 PM
View EPC Stormwater Review
3/14/2023 5:20:53 PM
PBMP_v1 3/14/2023 5:20:53 PM
View EPC Stormwater Review
3/14/2023 5:19:29 PM
ESQCP_v1 3/14/2023 5:19:29 PM
View EPC Stormwater Review
3/14/2023 5:16:28 PM
GEC Checklist_v1 3/14/2023 5:16:28 PM
EPC Stormwater Review
3/14/2023 5:11:16 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Report...(to be uploaded with PCD comments)
- FAE.......................(to be uploaded with PCD comments)
- GEC Plan...............(to be uploaded with PCD comments)
- GEC Checklist
- ESQCP
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
3/14/2023 5:11:16 PM
RBD Floodplain
2/24/2023 10:13:46 AM
grading plan does not show any work in the SFHA, no further comment 2/24/2023 10:13:46 AM