Project Review Comments

Back to List


Project Name
Walmart Gas Station #4435
Description
Adding a gas station and small store
Location
Parcels
5312101005 5312101005
Applicant
Walmart Real Estate Business Trust
Abi Rushing ( abir@sgadesigngroup.com )
(479) 254-3775 x514
Abi Rushing ( abir@sgadesigngroup.com )
(479) 254-3775 x514
File Number
PPR2323
Project Manager
Ashlyn Mathy
Status
Active
Created
9/13/2022 12:29:00 PM

View: Project Documents



Review Comments (26)

Link Agency Comment
View EPC Health Department
8/4/2023 4:36:53 PM
8/4/2023 4:36:53 PM
Upper Black Squirrel Creek GWMD
8/2/2023 2:52:47 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 8/2/2023 2:52:47 PM
View El Paso County Conservation Dist
7/26/2023 12:03:59 PM
Brief comments attached as pdf. 7/26/2023 12:03:59 PM
View PCD Engineering Division
7/20/2023 9:12:01 AM
Meridian Rd/Flower Road INT improvement design plan 7/20/2023 9:12:01 AM
View PCD Engineering Division
7/20/2023 9:10:29 AM
PCD Engineering Division Engineering Review Ver.1

Please see additional engineering review comments on the TIS.

Address necessary public improvements at intersection and median along Meridian Rd at Walmart Drive and Flower Rd. Address required median island improvements. Update FAE and CDs and TIS Report to reflect improvement and median correction.
Please see attached Meridian Rd/Flower Road INT improvement design plan.

-TIS V1 (Uploaded by Engineer-attached)


Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
7/20/2023 9:10:29 AM
Pikes Peak Regional Building Department
7/19/2023 7:44:16 AM
1. The addresses for the new buildings for the Walmart Gas Station at Meridian Market View will be 17770 Meridian Market View for the new C-Store and the 17780 Meridian Market View for the gas canopy. Please use these addresses when submitting plans to RBD for permitting.
2. Any other separate structures such as Trash enclosures over 7’ in height, retaining walls over 4’ in height, signs etc. will require separate addresses and permits.
3. Please add the street name Meridian Market View to the site plans and vicinity map.
4. No further comments.


Becky Allen
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org
7/19/2023 7:44:16 AM
View PCD Project Manager
7/18/2023 8:50:27 AM
SDP comments 7/18/2023 8:50:27 AM
View PCD Project Manager
7/18/2023 8:49:36 AM
sign plan comments 7/18/2023 8:49:36 AM
View PCD Project Manager
7/18/2023 8:49:12 AM
lighting plan comments 7/18/2023 8:49:12 AM
View PCD Project Manager
7/18/2023 8:48:49 AM
LOI comments 7/18/2023 8:48:49 AM
View PCD Project Manager
7/18/2023 8:48:21 AM
landscape plan comments 7/18/2023 8:48:21 AM
View PCD Project Manager
7/18/2023 8:47:53 AM
FAE form comments 7/18/2023 8:47:53 AM
View PCD Project Manager
7/18/2023 8:47:32 AM
ESQCP comments 7/18/2023 8:47:32 AM
View PCD Project Manager
7/18/2023 8:47:09 AM
Drainage report comments 7/18/2023 8:47:09 AM
View EPC Stormwater Review
7/17/2023 4:45:08 PM
SWMP Checklist 7/17/2023 4:45:08 PM
View EPC Stormwater Review
7/17/2023 4:44:47 PM
SWMP 7/17/2023 4:44:47 PM
View EPC Stormwater Review
7/17/2023 4:44:25 PM
PBMP Applicability Form 7/17/2023 4:44:25 PM
View EPC Stormwater Review
7/17/2023 4:43:45 PM
GEC Plan 7/17/2023 4:43:45 PM
View EPC Stormwater Review
7/17/2023 4:43:09 PM
GEC Checklist 7/17/2023 4:43:09 PM
View PCD Engineering Division
7/17/2023 5:41:19 PM
Engineering Review Ver.1

Please see engineering review comments on the following documents. Documents to be uploaded by PCD Project Manager.

-ESQCP V1
- Final Drainage Report V1
- FAE V1
- LOI V1 (uploaded by PCD PM)
-SDP V1 (uploaded by PCD PM)
-TIS V1 (Uploaded by Engineer-attached)

Road Impact fees are applicable "Convenience Commercial" will be the category.


Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
7/17/2023 5:41:19 PM
Woodmen Road Metro
7/12/2023 12:40:02 PM
This proposed project is located within the Woodmen Road Metropolitan District boundaries. The District assess’ platting and building permit fees for new development within the District Boundaries.

The fees for this year are as follows:
Woodmen Road Metropolitan District:

Platting Fees:
Commercial- $1540/ACRE
Residential- $385.00/LOT

Building Permit Fees:
Commercial-
Destination retail/hotel- $1.37/SQUARE FOOT
Convenience Commercial- $5.51/SQUARE FOOT
All Other Uses- $1.10/SQUARE FOOT
Residential-
Single Family- $550/UNIT
Multi Family- $385/UNIT
7/12/2023 12:40:02 PM
View EPC Parks Department
7/7/2023 2:29:50 PM
El Paso County Parks and Community Services Final Comments - Please See Attached Document (No PAB Endorsement Necessary for Commercial Applications) 7/7/2023 2:29:50 PM
View Falcon Fire Protection District
7/3/2023 1:01:43 PM
7/3/2023 1:01:43 PM
View EPC Environmental Services
7/3/2023 12:21:28 PM
7/3/2023 12:21:28 PM
EPC Stormwater Review
7/17/2023 4:42:43 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter...........(to be uploaded by PM)
- ESQCP........................(to be uploaded by PM)
- FAE.............................(to be uploaded by PM)
- GEC Checklist
- GEC Plan
- Landscape Plan.........(to be uploaded by PM)
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal (the planner will send an upload request). Both documents are currently only attached to the MS4 Post-Construction Form. They need to be uploaded as separate documents on EDARP. I don't have any specific comments on either document though.
- O&M Manual
- Private Detention Basin / Stormwater Quality BMP Maintenance Agreement

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
7/17/2023 4:42:43 PM
Colorado Department of Transportation - Pueblo Office
6/28/2023 10:31:04 AM
We are in receipt of the above-referenced development submittal. After review of the provided documents, CDOT Staff currently has NO COMMENT pertaining to this submittal.
CDOT requests the opportunity to review and comment on any future submissions relevant to this application.

Thank you
6/28/2023 10:31:04 AM