Project Review Comments

Back to List


Project Name
7525 Falcon Meadow Blvd - New Church
Description
Building a new chruch on the property with a new parking lot
Location
Parcels
5302001017 5302001017
Applicant
Cleary Building
Nic Herron ( nherron@clearybuilding.com ) Nic Herron ( nherron@clearybuilding.com )
File Number
PPR2416
Project Manager
Lacey Dean
Status
Active
Created
9/8/2022 12:55:02 PM

View: Project Documents



Review Comments (24)

Link Agency Comment
View PCD Project Manager
4/7/2025 4:23:09 PM
V2_Site Development Plan_comments 4/7/2025 4:23:09 PM
View PCD Project Manager
4/7/2025 4:22:54 PM
V2_Letter of Intent_comments 4/7/2025 4:22:54 PM
View PCD Project Manager
4/7/2025 4:22:37 PM
V2_Lighting Plan_comments 4/7/2025 4:22:37 PM
View PCD Project Manager
4/7/2025 4:22:14 PM
V2_Application-Petition Form 4/7/2025 4:22:14 PM
Falcon Fire Protection District
4/4/2025 10:23:44 AM
No new comments to add from the June 4, 2024, letter.

Curtis L. Kauffman
Fire Prevention Division
Lieutenant/Fire Inspector II
4/4/2025 10:23:44 AM
PCD Project Manager
4/3/2025 1:32:25 PM
Review 2: EPC Planning Division has comments in green text boxes on the following documents.

- Application/Petition Form (This was never resubmitted for rereview)
- Lighting Plan (This was never resubmitted for rereview)
- Letter of Intent (requested comments from Review 1 were not addressed)
- Site Development Plan / Landscape Plan Drawings

Reviewed by:
Lacey Dean, Associate Planner
laceydean2@elpasco.com
4/3/2025 1:32:25 PM
PCD Engineering Division
4/3/2025 8:35:22 AM
Engineering Review Ver.2

Engineering comments have been resolved.
EPC RIF Note to be added to SDP for final PCD approval.
Note there are discrepancies between the SDP_V2,and Floor Plans_V1 for the building sqft. This may be due to scaling issues on the sheets. Scale is missing. SDP_V2 measures the new bldg at 3200sqft and the Floor Plan_V1 measures at ~3000sqft. Floorplan appears to be more accurate than SDP_V2.

3000sqft will be used for calculation of EPC Road Impact Fee
Institutional $2371/1000sqft
Road Impact Fee $7,113.00
RIF to be paid at time of building permit.

Driveway access permit is on file for one driveway.


Edward Schoenheit, Engineer
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
4/3/2025 8:35:22 AM
EPC Stormwater Review
4/7/2025 6:44:58 AM
Review 2: None of my Review 1 comments were addressed. Please address them. I have copy/pasted them to the Review 2 docs for reference, the docs will be uploaded by the PM.

EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Letter of Intent.................(to be uploaded with Development Services comments)
- Site Development Plan....(to be uploaded with Development Services comments)

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
4/7/2025 6:44:58 AM
View EPC Health Department
7/19/2024 4:58:53 PM
7/19/2024 4:58:53 PM
View PCD Project Manager
6/6/2024 4:55:14 PM
V1_Traffic Memo 6/6/2024 4:55:14 PM
View PCD Project Manager
6/6/2024 4:54:33 PM
- V1_Lighting Plan 6/6/2024 4:54:33 PM
View PCD Project Manager
6/6/2024 4:54:15 PM
- V1_Landscape Plan Drawings 6/6/2024 4:54:15 PM
View PCD Project Manager
6/6/2024 4:50:38 PM
- V1_Revised Site Development Plan 6/6/2024 4:50:38 PM
View PCD Project Manager
6/6/2024 4:49:56 PM
- V1_Letter of Intent 6/6/2024 4:49:56 PM
View PCD Project Manager
6/6/2024 4:49:25 PM
- V1_Application-Petition Form 6/6/2024 4:49:25 PM
PCD Project Manager
6/6/2024 4:48:33 PM
PCD Planning Division Review 1 - EPC Planning Comments have been provided (in green) on the following documents:

- V1_Application-Petition Form
- V1_Letter of Intent
- V1_Revised Site Development Plan
- V1_Landscape Plan Drawings
- V1_Lighting Plan


Reviewed by:
Lacey Dean
laceydean2@elpasoco.com
6/6/2024 4:48:33 PM
View Mountain View Electric Association, Inc.
6/5/2024 10:11:16 AM
See attached comments 6/5/2024 10:11:16 AM
View Falcon Fire Protection District
6/4/2024 11:46:43 AM
6/4/2024 11:46:43 AM
Falcon School District 49
6/3/2024 10:25:21 AM
District 49 does not have any comments at this time but respectfully reserves the right to comment on any future submittals. 6/3/2024 10:25:21 AM
Pikes Peak Regional Building Department
6/3/2024 9:10:24 AM
Enumerations has the following comments:

1. This new building will require a separate address. Enumerations has assigned the address of 7535 Falcon Meadows Blvd. for this project. This address should be used when submitting building plans for review/permit.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
6/3/2024 9:10:24 AM
EPC Stormwater Review
5/30/2024 3:52:25 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Letter of Intent.................(to be uploaded with Development Services comments)
- Site Development Plan....(to be uploaded with Development Services comments)

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
5/30/2024 3:52:25 PM
PCD Engineering Division
5/29/2024 3:12:52 PM
Review 1 - EPC Engineering Comments have been provided on the following documents:

- Traffic Memo (to be uploaded by the project manager)
- Revised Site Development Plan (to be uploaded by the project manager)
- Letter of Intent (to be uploaded by the project manager)

Reviewed by:
Hao Vo, P.E.
haovo@elpasoco.com
5/29/2024 3:12:52 PM
Upper Black Squirrel Creek GWMD
5/28/2024 4:54:08 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves to comment on any future submittal. 5/28/2024 4:54:08 PM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/28/2024 12:16:01 PM
CSU UDS does not have any comments
MAR
5/28/2024 12:16:01 PM