Project Review Comments

Back to List


Project Name
Northern Delivery System Booster Pump Station
Description
Pump water from CSU Hwy 83 Reservoir to TMD existing water tank in Sanctuary Pointe; Tank to be owned by CSU w/ 3 3 pumps
Location
Parcels
6203000002 6203000002
Applicant
JDS-Hydro Consultants, Inc.
Project Manager Mario DiPasquale ( mdipasquale@jdshydro.com )
(719) 227-0072 x110
Project Manager Mario DiPasquale ( mdipasquale@jdshydro.com )
(719) 227-0072 x110
File Number
PPR2262
Project Manager
Kari Parsons
Status
Closed
Created
8/29/2022 11:35:03 AM

View: Project Documents



Review Comments (39)

Link Agency Comment
PCD Project Manager
6/19/2023 2:04:48 PM
Approved. Please coordinate with Dept of Public Works for any required permits. 6/19/2023 2:04:48 PM
PCD Engineering Division
6/15/2023 2:41:40 PM
Comments have been resolved for the following document:

-Drainage Report

The project manager will upload any approved documents.

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
6/15/2023 2:41:40 PM
EPC Stormwater Review
6/19/2023 3:40:36 PM
Review 3: All EPC Stormwater comments have been addressed.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
6/19/2023 3:40:36 PM
View PCD Project Manager
5/22/2023 7:06:48 AM
FAE Comment Stormwater version 2 5/22/2023 7:06:48 AM
View PCD Project Manager
5/22/2023 7:05:19 AM
SWMP Checklist version 2 comment 5/22/2023 7:05:19 AM
View PCD Project Manager
5/22/2023 7:04:49 AM
SWMP comment review 2 5/22/2023 7:04:49 AM
View PCD Project Manager
5/22/2023 7:04:25 AM
Letter of intent- stormwater comment 5/22/2023 7:04:25 AM
View PCD Project Manager
5/22/2023 7:03:06 AM
GEC Review 2 comments 5/22/2023 7:03:06 AM
View PCD Project Manager
5/22/2023 7:02:40 AM
GEC Checklist- Review 2 5/22/2023 7:02:40 AM
View PCD Engineering Division
5/18/2023 4:31:07 PM
Drainage Report Redlines (EPC and SW) 5/18/2023 4:31:07 PM
PCD Engineering Division
5/18/2023 7:29:02 AM
Review 2 comments are attached for the following documents:

-Drainage report

Comments are resolved for the following documents:

-Gec Plan
-FAE
-Site plan
-Letter of intent

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
5/18/2023 7:29:02 AM
EPC Stormwater Review
5/17/2023 2:39:33 PM
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following documents (to be uploaded by the PM):
- Drainage Report
- FAE
- Letter of Intent
- GEC Plan
- GEC Checklist
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal:
- ESQCP
Note: This project is considered to be adjacent to a sensitive area, therefore, an ESQCP is required.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
5/17/2023 2:39:33 PM
PCD Project Manager
5/16/2023 10:54:50 AM
Label the seed mix on the site dev plan as this is acting as the alternative landscape plan as well. Previous comment. There is no code or checklist that states it can't be on two drawings. 5/16/2023 10:54:50 AM
PCD Project Manager
5/16/2023 11:00:16 AM
Remove the PCD director signature block; she does not approve these project level types- staff will stamp approved in bluebeam-previous comment.

Sign the drawings and stamp (applicant, engineer)
5/16/2023 11:00:16 AM
View EPC Health Department
1/20/2023 11:50:52 AM
1/20/2023 11:50:52 AM
Tri-Lakes-Monument Fire Protection District
12/21/2022 1:56:55 PM
Knox locks will be required for the gates and possibly the facility. Otherwise, no additional comments. JCB 12/21/2022 1:56:55 PM
PCD Project Manager
12/19/2022 1:05:46 PM
Please add the new tank to the 1041 application 12/19/2022 1:05:46 PM
View PCD Project Manager
12/19/2022 1:05:22 PM
Site Development Plan Comments 12/19/2022 1:05:22 PM
View PCD Project Manager
12/19/2022 1:05:02 PM
Landscape plan comments 12/19/2022 1:05:02 PM
View EPC Stormwater Review
12/15/2022 4:38:47 PM
SWMP Checklist_v1 12/15/2022 4:38:47 PM
View EPC Stormwater Review
12/15/2022 4:32:31 PM
SWMP_v1 12/15/2022 4:32:31 PM
View EPC Stormwater Review
12/15/2022 4:31:26 PM
GEC Checklist_v1 12/15/2022 4:31:26 PM
View EPC Stormwater Review
12/15/2022 4:30:44 PM
GEC_v1 12/15/2022 4:30:44 PM
View EPC Stormwater Review
12/15/2022 4:30:00 PM
FAE_v1 12/15/2022 4:30:00 PM
View EPC Stormwater Review
12/15/2022 4:29:37 PM
Drainage Report_v1 12/15/2022 4:29:37 PM
View EPC Stormwater Review
12/15/2022 4:28:40 PM
LOI_v1 12/15/2022 4:28:40 PM
EPC Stormwater Review
12/15/2022 4:39:26 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Letter of Intent.........(uploaded with PCD comments)
- Drainage Report.....(uploaded with PCD comments)
- FAE.........................(uploaded with PCD comments)
- GEC Plan...............(uploaded with PCD comments)
- GEC Checklist
- SWMP
- SWMP Checklist

Please provide the following documents upon resubmittal:
- ESQCP

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
ChristinaPrete@elpasoco.com
12/15/2022 4:39:26 PM
PCD Engineering Division
12/15/2022 5:05:16 PM
Review 1 comments will be uploaded for the following documents:

-Drainage report- to be uploaded by sw engineer
-GEC plan- to be uploaded by sw engineer
-Site plan
-Letter of intent
-FAE- to be uploaded by sw engineer

Reviewed By:
Lupe Packman
Review Engineer
lupepackman@elpasoco.com
12/15/2022 5:05:16 PM
RBD Floodplain
12/15/2022 9:44:58 AM
project parcel 6203000002 not in the floodplain , no comment 12/15/2022 9:44:58 AM
Pikes Peak Regional Building Department
12/14/2022 9:55:14 AM
The number of available addresses along Hwy 83 in this location is somewhat limited. When requesting an address for this proposed booster pump station, please provide Enumerations with a site plan showing all future structures which would require separate addresses so that addressing can be assigned correctly.
Based on the access, all addresses will be from Hwy 83.


Brent Johnson
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2888 E: brent@pprbd.org W: pprbd.org
12/14/2022 9:55:14 AM
Woodmoor Water and Sanitation District
12/14/2022 7:34:16 AM
This project does not reside within the Woodmoor Water & Sanitation District boundaries, therefore no comments. 12/14/2022 7:34:16 AM
Black Forest Fire Protection District
12/12/2022 4:28:36 PM
BFFR
As this could be a mutual aid area, will Black Forest have gate access to the property?
Otherwise no additional comments. JMR
12/12/2022 4:28:36 PM
View Colorado Division of Water Resources
12/12/2022 11:17:29 AM
12/12/2022 11:17:29 AM
Cherokee Metro Dist
12/12/2022 10:15:36 AM
Cherokee has no comments on this project but we appreciate the opportunity to review regional water and wastewater projects for reference on future CMD projects. 12/12/2022 10:15:36 AM
Academy SD 20 Building Fund
12/5/2022 7:08:11 AM
Academy District 20 is in receipt of File# PPR2262 for approval of the Northern Delivery System Booster Pump Station.

The District has no comment regarding this request.

If you need additional information, please contact me.

Don Smith
Planning Consultant
12/5/2022 7:08:11 AM
View EPC Environmental Services
12/2/2022 2:52:34 PM
12/2/2022 2:52:34 PM
Academy Water & Sanitation
12/1/2022 3:41:22 PM
Kari,
The booster pump station does not impact AWSD based on the location of this activity. Our district is north and west of this part of the project.
12/1/2022 3:41:22 PM
911 Authority - El Paso/Teller County
12/1/2022 8:18:42 AM
No action for E911 on this submittal.
Thank you.
Justin
12/1/2022 8:18:42 AM
Mountain View Electric Association, Inc.
11/30/2022 2:03:46 PM
The Association has existing facilities near and within this parcel of land. If there is any damage, removal or relocation of facilities it will be at the expense of the applicant. 11/30/2022 2:03:46 PM