Project Review Comments

Back to List


Project Name
Aura Cross Roads- CSU Natural Gas & Electric
Description
4" electric conduit to serve existing dev 2800 feet of 4" gas plastic pipe
Location
Meadowbrook Parkway, Newt Road west to Peterson Road north of Hwy 24
Parcels
5408007001 5408007001 5408007006 5408007006
Applicant
Colorado Springs Utilities
Michelynn Hollister ( mhollister@csu.org )
(719) 668-4476
Michelynn Hollister ( mhollister@csu.org )
(719) 668-4476
File Number
CDR2213
Project Manager
Kari Parsons
Status
Closed
Created
8/2/2022 5:09:30 PM

View: Project Documents



Review Comments (25)

Link Agency Comment
EPC Stormwater Review
10/10/2022 5:12:15 PM
Review 2: EPC Stormwater comments have been addressed.

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
10/10/2022 5:12:15 PM
Cherokee Metro Dist
10/10/2022 9:45:45 AM
Contact CMD during excavation and installation of line crossings so inspector can verify clearances. 10/10/2022 9:45:45 AM
PCD Project Manager
10/10/2022 7:39:53 AM
Approved docs uploaded. Contact Brad Walters 7195206819 to determine if a construction permit is required. 10/10/2022 7:39:53 AM
Colorado Department of Transportation - Pueblo Office
9/27/2022 12:17:47 PM
After review of the documents submitted, it appears the natural gas and electric work does not enter into CDOT ROW. CDOT staff have no comments regarding the utility work for Aura at Crossroads Subdivision.

A CDOT access permit is still required for Aura at Crossroads Subdivision. An application has not been received as of the date of these comments.
9/27/2022 12:17:47 PM
PCD Engineering Division
9/28/2022 9:03:28 AM
PCD Engineer Review Version 2

Construction Drawings have been accepted for file.
ESQCP has been approved for file.
A County work in the ROW permit will be required from EPC DPW.

No further PCD Engineer comments.

Thank you

Edward Schoenheit, Engineer I
E.P.C. Planning & Community Development
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
9/28/2022 9:03:28 AM
Cherokee Metro Dist
9/12/2022 3:56:25 PM
Please revise the submittal with upload updated drawings from Michelynn Hollister referred to in the email below received 9/9/22.
From: Michelynn Hollister
Afternoon Kevin,
We submitted the revised drawings to EDARP a couple of days ago. I’m not familiar with EDARP process at this point, so I don’t know if the county has to review them first then release them for external reviewers. Honestly, I haven’t looked in a couple of days or received any emails.
I’ll keep you posted if I get an update.
Take care and enjoy the weekend,
Michelynn
9/12/2022 3:56:25 PM
View EPC Stormwater Review
9/5/2022 3:33:33 PM
PBMP_v1 9/5/2022 3:33:33 PM
View EPC Stormwater Review
9/5/2022 3:33:11 PM
ESQCP_v1 9/5/2022 3:33:11 PM
View EPC Stormwater Review
9/5/2022 3:32:50 PM
SWMP Checklist_v1 9/5/2022 3:32:50 PM
View EPC Stormwater Review
9/5/2022 3:32:24 PM
GEC Checklist_v1 9/5/2022 3:32:24 PM
View EPC Stormwater Review
9/5/2022 3:31:42 PM
GEC_v1 9/5/2022 3:31:42 PM
View EPC Stormwater Review
9/5/2022 3:30:38 PM
FAE_v1 9/5/2022 3:30:38 PM
EPC Stormwater Review
9/5/2022 3:29:09 PM
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- FAE
- GEC Plan
- GEC Checklist
- SWMP Checklist
- ESQCP
- PBMP Applicability Form

Reviewed by:
Christina Prete, P.E.
Stormwater Engineer III
christinaprete@elpasoco.com
9/5/2022 3:29:09 PM
View Colorado Springs Airport Advisory Commission
8/29/2022 11:31:00 AM
The attached summary with comments will be presented at the September 28, 2022 Airport Advisory Commission meeting. 8/29/2022 11:31:00 AM
View PCD Engineering Division
8/29/2022 7:50:31 AM
Engineer Review Ver.1

Redline Comment on Construction Drawings.
Please add standard notes and signature blocks per embedded comments
8/29/2022 7:50:31 AM
View PCD Engineering Division
8/29/2022 7:50:57 AM
Engineer Review Ver.1

Redline Comments on FAE document
Please correct Section 1 and totals per note.
8/29/2022 7:50:57 AM
PCD Engineering Division
8/29/2022 7:46:40 AM
Engineer Review Version 1

Please make corrections on the following documents.

-FAE. Please update totals as shown on redline document
-Construction / Utility line drawings- please add title page with standard EPC construction notes and signature blocks. See redline document with notes

The following documents were reviewed with no engineer comments.
-PBMP Applicability
-Letter of Intent
-ESQCP
-GEC Plan
-SWMP Plan


Edward Schoenheit, Engineer I
E.P.C. Planning & Community Development
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
8/29/2022 7:46:40 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
8/25/2022 9:57:30 AM
Kari, I have no review comments for the above name project Al 8/25/2022 9:57:30 AM
Colorado Springs Public Works
8/23/2022 10:51:41 AM
Engineering Development Review has no comments on this item.

Joel Dagnillo, P.E.
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
8/23/2022 10:51:41 AM
Colorado Springs Public Works
8/18/2022 1:08:01 PM
Traffic Engineering has no comments on this item.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
8/18/2022 1:08:01 PM
Upper Black Squirrel Creek GWMD
8/17/2022 3:20:10 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment in the future. 8/17/2022 3:20:10 PM
Colorado Department of Transportation - Pueblo Office
8/17/2022 2:55:15 PM
CDOT has no comment regarding the installation of natural gas and electric utilities at this location.
A CDOT access permit is required for the development at this location.
8/17/2022 2:55:15 PM
Mountain View Electric Association, Inc.
8/16/2022 1:01:48 PM
This site is not within MVEA's service area boundaries. 8/16/2022 1:01:48 PM
RBD Floodplain
8/16/2022 12:15:12 PM
floodplain has no comment on subterranean utilities in the flood fringe 8/16/2022 12:15:12 PM
911 Authority - El Paso/Teller County
8/16/2022 9:23:49 AM
No action for E911 on this submittal.
Thank you.
Justin
8/16/2022 9:23:49 AM