Project Review Comments
- Project Name
- Cherokee Metro Lift Station
- Description
- The District seeks to make improvements to their existing wastewater treatment plant operations located in unincorporated El Paso County (EPC) by adding a new pump station and wet well to help address smell and other items from their existing wet well (open air pond), located on the site.
- Location
- Parcels
- 5418000080 5418000080
- Applicant
-
Cherokee Metro District
Nathan Skalak ( nskalak@jvajva.com )
(303) 564-4930 Nathan Skalak ( nskalak@jvajva.com )
(303) 564-4930 - File Number
- PPR2254
- Project Manager
- Ashlyn Mathy
- Status
- Closed
- Created
- 6/29/2022 3:43:41 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
7/11/2023 8:12:16 AM |
comments resolved moving into next part in process! | 7/11/2023 8:12:16 AM | |
PCD Engineering Division
7/10/2023 3:49:07 PM |
Engineering Review Ver.4 No further engineer comments. Routed for final approval. Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
7/10/2023 3:49:07 PM | |
EPC Stormwater Review
7/10/2023 11:34:14 AM |
All EPC Stormwater comments have been addressed. Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
7/10/2023 11:34:14 AM | |
EPC Stormwater Review
6/1/2023 1:06:29 PM |
Review 3: Please submit the following revised documents: - ESQCP...................(see review comments v2) - SWMP Checklist....(see review comments v2) - SWMP....................(see review comments v1) Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
6/1/2023 1:06:29 PM | |
View |
PCD Engineering Division
5/31/2023 1:22:46 PM |
Engineering Review Ver.3 Please provide engineer stamp and signature blocks on the Drainage memo V2 and return for final approval. (unresolved V1) Once any outstanding stormwater comments are addressed project will be processed for final approval. No further engineer comments. Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
5/31/2023 1:22:46 PM |
PCD Project Manager
5/26/2023 9:56:48 AM |
planning comments have been resolved. | 5/26/2023 9:56:48 AM | |
View |
EPC Stormwater Review
4/4/2023 11:17:04 AM |
GEC_v2 | 4/4/2023 11:17:04 AM |
View |
PCD Project Manager
4/4/2023 10:01:01 AM |
site development plan comments | 4/4/2023 10:01:01 AM |
PCD Engineering Division
4/3/2023 2:41:25 PM |
Engineering Review Ver.2 Please provide engineer stamp on the Drainage memo V2 and return. Comments addressed on the GEC Plan V2 and SDP V2. No further engineer comments. Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
4/3/2023 2:41:25 PM | |
View |
EPC Stormwater Review
4/3/2023 1:43:49 PM |
SWMP Checklist_v2 | 4/3/2023 1:43:49 PM |
View |
EPC Stormwater Review
4/3/2023 1:43:25 PM |
ESQCP_v2 | 4/3/2023 1:43:25 PM |
EPC Stormwater Review
4/3/2023 1:44:12 PM |
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - GEC Plan...............(to be uploaded with PCD comments) - ESQCP - SWMP Checklist Please submit the following revised documents (see review comments v1): - SWMP Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
4/3/2023 1:44:12 PM | |
View |
EPC Health Department
2/3/2023 10:12:56 AM |
2/3/2023 10:12:56 AM | |
View |
PCD Project Manager
1/18/2023 2:49:30 PM |
FAE comments | 1/18/2023 2:49:30 PM |
View |
PCD Project Manager
1/18/2023 2:47:44 PM |
drainage memo comments | 1/18/2023 2:47:44 PM |
View |
PCD Project Manager
1/18/2023 2:46:37 PM |
grading and erosion plan comments | 1/18/2023 2:46:37 PM |
View |
PCD Project Manager
1/18/2023 2:44:08 PM |
landscape plan comments | 1/18/2023 2:44:08 PM |
View |
PCD Project Manager
1/18/2023 2:43:36 PM |
LOI comments | 1/18/2023 2:43:36 PM |
View |
PCD Project Manager
1/18/2023 2:43:09 PM |
lighting plan comments | 1/18/2023 2:43:09 PM |
View |
PCD Project Manager
1/18/2023 2:42:44 PM |
SDP comments | 1/18/2023 2:42:44 PM |
View |
EPC Stormwater Review
1/10/2023 6:17:09 PM |
ESQCP_v1 | 1/10/2023 6:17:09 PM |
View |
EPC Stormwater Review
1/10/2023 6:16:38 PM |
SWMP Checklist_v1 | 1/10/2023 6:16:38 PM |
View |
EPC Stormwater Review
1/10/2023 6:16:09 PM |
SWMP_v1 | 1/10/2023 6:16:09 PM |
View |
EPC Stormwater Review
1/10/2023 6:15:41 PM |
GEC Checklist_v1 | 1/10/2023 6:15:41 PM |
EPC Stormwater Review
1/10/2023 6:14:51 PM |
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Memo.....(to be uploaded by PM with PCD comments) - GEC Plan...............(to be uploaded by PM with PCD comments) - GEC Checklist - SWMP - SWMP Checklist - ESQCP Reviewed by: Christina Prete, P.E. Stormwater Engineer III ChristinaPrete@elpasoco.com |
1/10/2023 6:14:51 PM | |
PCD Engineering Division
1/10/2023 3:20:14 PM |
Engineering Review Ver.1 Please see engineer redline comments on the following documents -SDP (To be uploaded by PM) -GEC Plan (To be uploaded with Stormwater comments) -FAE. Please correct missing entries and update to 2023 form. (To be uploaded with Stormwater comments) Thank you Edward Schoenheit, Engineer I E.P.C. Dept. of Public Works 2880 International Circle Colorado Springs, CO. 80910 Office: 719.520.6813 Cell: 719.502.9659 https://planningdevelopment.elpasoco.com/ |
1/10/2023 3:20:14 PM | |
Pikes Peak Regional Building Department
1/9/2023 1:59:16 PM |
As long as existing the underground vault lift station is removed prior to the new one going in, a new address will not need to be assigned. If this is not the case please contact Enumerations. Amy Vanderbeek Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-327-2930 E: Amy@pprbd.org |
1/9/2023 1:59:16 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
1/3/2023 2:32:21 PM |
Utilities Development Services has no comments on this application. cmasoumi@csu.org |
1/3/2023 2:32:21 PM | |
911 Authority - El Paso/Teller County
12/21/2022 9:52:41 AM |
No action for E911 on this submittal. Thank you. Justin |
12/21/2022 9:52:41 AM | |
Mountain View Electric Association, Inc.
12/20/2022 1:17:03 PM |
This project is not within MVEA territory | 12/20/2022 1:17:03 PM |