Project Review Comments
- Project Name
- Pikes Peak Christian Church Storage Building
- Description
- Location
- Parcels
- 6501318001 6501318001
- Applicant
-
Taylor Architecture & Design, LLC
Zachary Taylor ( zachary@taylor-ad.com )
(719) 475-1727 Zachary Taylor ( zachary@taylor-ad.com )
(719) 475-1727 - File Number
- PPR2242
- Project Manager
- Remove Ashlyn Mathy
- Status
- Closed
- Created
- 5/23/2022 2:48:08 PM
View: Project Documents
Agency | Comment | ||
---|---|---|---|
PCD Project Manager
10/25/2022 3:54:01 PM |
ready for approval | 10/25/2022 3:54:01 PM | |
EPC Stormwater Review
10/24/2022 8:48:04 AM |
Review 3: EPC Stormwater comments have been resolved on the following documents: - Drainage Letter EPC Stormwater has no further comments. Thanks. Reviewed by: Glenn Reese, P.E. Stormwater Engineer II GlennReese@elpasoco.com |
10/24/2022 8:48:04 AM | |
View |
PCD Project Manager
9/26/2022 7:07:17 AM |
see comments for drainage from stormwater engineering | 9/26/2022 7:07:17 AM |
View |
EPC Stormwater Review
9/22/2022 4:06:03 PM |
Drainage Letter | 9/22/2022 4:06:03 PM |
EPC Stormwater Review
9/22/2022 4:05:09 PM |
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Letter Reviewed by: Glenn Reese, P.E. Stormwater Engineer II GlennReese@elpasoco.com |
9/22/2022 4:05:09 PM | |
PCD Engineering Division
9/19/2022 2:22:14 PM |
PCD Engineering has no further comments. Any approved documents will be uploaded by the project manager. Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
9/19/2022 2:22:14 PM | |
View |
EPC Health Department
9/9/2022 8:46:40 PM |
9/9/2022 8:46:40 PM | |
View |
PCD Project Manager
8/30/2022 9:39:21 AM |
Drainage Letter comments | 8/30/2022 9:39:21 AM |
View |
PCD Project Manager
8/30/2022 9:38:38 AM |
SDP comments | 8/30/2022 9:38:38 AM |
View |
PCD Project Manager
8/30/2022 9:37:15 AM |
Lighting Plan comments | 8/30/2022 9:37:15 AM |
View |
PCD Project Manager
8/30/2022 9:36:49 AM |
Letter of intent comments | 8/30/2022 9:36:49 AM |
EPC Stormwater Review
8/30/2022 8:30:35 AM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Letter....(to be uploaded by PM with PCD comments) Reviewed by: Glenn Reese, P.E. Stormwater Engineer II GlennReese@elpasoco.com |
8/30/2022 8:30:35 AM | |
PCD Project Manager
8/23/2022 8:28:53 AM |
Waiting on Stormwater's review which should be done and sent to the applicant by 8/26/22 | 8/23/2022 8:28:53 AM | |
View |
El Paso County Conservation Dist
8/21/2022 7:33:02 PM |
EPCCD grass seed native shotgun mix info attached as a .jpg. | 8/21/2022 7:33:02 PM |
View |
El Paso County Conservation Dist
8/21/2022 7:32:49 PM |
EPCCD brief comments attached as .docx. | 8/21/2022 7:32:49 PM |
Pikes Peak Regional Building Department
8/17/2022 11:39:17 AM |
Hello: Please see my comments below: 1. The address assigned for this new storage building will be 4920 Alturas Drive. Please use 4920 Alturas Drive when submitting plans to Regional Building Department. Please be sure to include an architectural site plan in the Architectural Plans set. When performing RBD plan reviews for permit, Enumerations does not approve site plans in the Development Plan pages. 2. No further comments Becky Allen Enumerations Plans Examiner Pikes Peak Regional Building Department O: 719-799-2707 W: pprbd.org E: beckya@pprbd.org |
8/17/2022 11:39:17 AM | |
PCD Engineering Division
8/15/2022 3:18:13 PM |
Review 1 comments will be uploaded by the project manager. Review comments on the following documents: - Drainage Letter Reviewed by: Carlos Hernandez Review Engineer carloshernandez@elpasoco.com |
8/15/2022 3:18:13 PM | |
Fountain Mutual Irrigation Company
8/8/2022 11:25:57 AM |
The proposed Pikes Peak Christian Church Storage Building lies north of the existing Fountain Mutual Irrigation Co. (FMIC) and Fountain Mutual Metropolitan District (FMMD) canal system (not the existing drainage ditch as indicated on the development plan). This section of the canal system is the start of the "Super Ditch" canal system that was improved beginning in 1999 to address stormwater flows east of Hancock Exp. (Main Street) and discharge these flows into the Windmill Gulch natural drainage basin to the east. As noted in the Letter of Intent, the proposed Storage Building is replacing an existing asphalt parking lot that sheet flows into the existing on-site detention pond located at the southeastern corner of this property. This pond was sized to handle the stormwater from this storage building site which discharging into the existing canal system, therefore both FMIC and FMMD have no issues with the proposed storage building site. |
8/8/2022 11:25:57 AM | |
View |
Widefield SD 3
8/3/2022 8:41:31 AM |
8/3/2022 8:41:31 AM |