Project Review Comments

Back to List


Project Name
Paint Brush Hills Metro District Pumphouse 6
Description
Approved under AASI-163
Location
Parcels
5226101006 5226101006
Applicant
RG & Associates
Project Engineer Jordan Schneider ( jschneider@rgengineers.com )
(303) 468-8476
Project Engineer Jordan Schneider ( jschneider@rgengineers.com )
(303) 468-8476
File Number
PPR2318
Project Manager
Lekishia Bellamy
Status
Closed
Created
5/19/2022 8:18:12 AM

View: Project Documents



Review Comments (32)

Link Agency Comment
PCD Engineering Division
9/27/2023 4:40:12 PM
Engineering Review Ver.3

No further engineer comments.
Project routed for approval.
A driveway access permit will be required. Owner to submit for permit.
Road Impact fees in the amount of $3,237.12 based on 960sqft building at Public/Institutional rate $3,372/1,000sqft paid at time of building permit.

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
9/27/2023 4:40:12 PM
Falcon Fire Protection District
9/26/2023 12:30:03 PM
See comment letter dated 09/06/2023. No other comments. 9/26/2023 12:30:03 PM
EPC Stormwater Review
9/26/2023 7:26:21 AM
Review 3: EPC DPW Stormwater comments have been resolved on the following documents:
- FAE
- SWMP
- GEC Plan
- GEC Checklist

EPC Stormwater has no further comments. Planner: no re-review necessary.

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
9/26/2023 7:26:21 AM
Mountain View Electric Association, Inc.
9/20/2023 10:38:06 AM
See comment letter dated June 1, 2023. No additional comments at this time. 9/20/2023 10:38:06 AM
Pikes Peak Regional Building Department
9/20/2023 8:44:35 AM
1. 10102 Keynes Drive, Ex Metal Roof Structure, is the entire structure being removed? If so, a wrecking permit is required through RBD. Please clarify.
2. 9924 Rockingham Drive-is the shed larger than 12sf? If so, a wrecking permit is required. Please clarify.
No further comment. Email your response to Amy Vanderbeek amy@pprbd.org


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
9/20/2023 8:44:35 AM
911 Authority - El Paso/Teller County
9/20/2023 8:21:31 AM
No action for E911 on this submittal.
Thank you.
Justin
9/20/2023 8:21:31 AM
View PCD Project Manager
9/12/2023 6:40:31 AM
Review 2
Please Address Comments on the following forms:
Financial Assurance
Grading & Erosion Control Checklist, Plan
Storm Water Management Plan
Site Development Plan
Drainage Report
9/12/2023 6:40:31 AM
PCD Engineering Division
9/7/2023 2:29:06 PM
Engineering Review Ver.2

Please see engineer comments on the following documents

-Site Plan V2. Remove GEC Plan signature blocks
-Drainage Letter V2. Update with signature blocks
-Address Stormwater comment for final approval submission

PCD Planner program for a 5-day re-review.

A driveway access permit will be required.
Sidewalk to be installed 5 inch thick at entrance.
Road Impact fees apply.

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/
9/7/2023 2:29:06 PM
Mountain View Electric Association, Inc.
9/7/2023 9:42:51 AM
See comment letter dated June 1, 2023. No additional comments at this time. 9/7/2023 9:42:51 AM
View Falcon Fire Protection District
9/6/2023 9:47:20 AM
9/6/2023 9:47:20 AM
View Falcon Fire Protection District
9/6/2023 9:46:44 AM
9/6/2023 9:46:44 AM
EPC Stormwater Review
9/7/2023 1:43:54 PM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents (to be uploaded by project manager):
- FAE
- GEC Plan
- GEC Checklist
- SWMP

EPC DPW Stormwater comments have been resolved on the following documents:
- Drainage Letter
- ESQCP
- Landscape Plan
- PBMP
- SWMP Checklist

Please provide signatures on the following documents:
- PBMP
- SWMP Checklist

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
9/7/2023 1:43:54 PM
Pikes Peak Regional Building Department
9/6/2023 6:44:25 AM
1. When submitting plans to RBD, do not use the address on the title block on the development plan, 9985 Towner Ave (okay to leave on the dp). The address that should be used is 10102 Keynes Drive.
2. Please email me with the answers to my questions; Are the utilities active for the utility shed, that is intended to be removed? What address was used to issue a permit for the shed with RBD? What is the address used for the electrical panel that will be removed & equipment to utility building? Amy@pprbd.org


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
9/6/2023 6:44:25 AM
911 Authority - El Paso/Teller County
8/30/2023 7:20:57 AM
No action for E911 on this submittal.
Thank you.
Justin
8/30/2023 7:20:57 AM
View EPC Stormwater Review
6/15/2023 3:56:41 PM
SWMP Checklist 6/15/2023 3:56:41 PM
View EPC Stormwater Review
6/15/2023 3:56:14 PM
SWMP 6/15/2023 3:56:14 PM
View EPC Stormwater Review
6/15/2023 3:55:53 PM
PBMP 6/15/2023 3:55:53 PM
View EPC Stormwater Review
6/15/2023 3:55:36 PM
Landscape Plan 6/15/2023 3:55:36 PM
View EPC Stormwater Review
6/15/2023 3:55:13 PM
GEC Checklist 6/15/2023 3:55:13 PM
View EPC Stormwater Review
6/15/2023 3:54:44 PM
GEC Plan 6/15/2023 3:54:44 PM
View EPC Stormwater Review
6/15/2023 3:54:23 PM
FAE 6/15/2023 3:54:23 PM
View EPC Stormwater Review
6/15/2023 3:51:55 PM
ESQCP 6/15/2023 3:51:55 PM
View EPC Stormwater Review
6/15/2023 3:47:10 PM
Drainage Letter 6/15/2023 3:47:10 PM
EPC Stormwater Review
6/15/2023 3:45:12 PM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- Drainage Letter......(uploaded with Development Services comments)
- ESQCP
- FAE.......................(re-uploaded with Development Services comments)
- GEC Plan...............(uploaded with Development Services comments)
- GEC Checklist
- Landscape Plan
- PBMP
- SWMP
- SWMP Checklist

Reviewed by:
Mikayla Hartford
Stormwater Engineer I
MikaylaHartford@elpasoco.com
6/15/2023 3:45:12 PM
View PCD Project Manager
6/6/2023 3:08:11 PM
6/6/2023 3:08:11 PM
View PCD Project Manager
6/6/2023 3:07:31 PM
6/6/2023 3:07:31 PM
View Mountain View Electric Association, Inc.
6/1/2023 4:21:02 PM
See attached comments 6/1/2023 4:21:02 PM
PCD Engineering Division
6/1/2023 7:48:34 AM
Note: Road impact fees will apply at the last land use application, which will be at building permit.

A driveway permit is not on file. Apply for a driveway permit through EDARP.

Comments on the following will be uploaded by the project manager:

-Site Plan
-FAE

Reviewed By:
Lupe Packman
lupepackman@elpasoco.com
6/1/2023 7:48:34 AM
911 Authority - El Paso/Teller County
5/25/2023 8:17:12 AM
No action for E911 on this submittal.
Thank you.
Justin.
5/25/2023 8:17:12 AM
Pikes Peak Regional Building Department
5/24/2023 8:53:51 AM
1. The leg of what is tract B of Paint Brush Hills Filing No 14 is the access to tract A of Paint Brush Hills filing No 12, tract A will be the location of the pump house. The address to utilize for the pump house is 10102 Keynes Drive.
2. Are there utilities active for the utility shed that is intended to be removed? A wrecking permit will be required through Regional Building Department (RBD) for this shed. What address was used to permit this shed with RBD?
3. What is the address used for the electrical panel that will also be removed?
4. RBD shows the address to the well services as 9924 Rockingham Drive. This was also confirmed with MVEA.


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
5/24/2023 8:53:51 AM
View Falcon Fire Protection District
5/19/2023 1:17:09 PM
5/19/2023 1:17:09 PM
Paint Brush Hills Metro
5/19/2023 1:04:26 PM
We do not have any comments at this time. This is our project and we are overseeing this as needed. It was also noted that the drainage letter had a comment referring to the letter submitted for Scenic View Storm Water Pond. Pump House 6 is no where near Scenic View so we are not sure why this would matter. 5/19/2023 1:04:26 PM