Project Review Comments

Back to List


Project Name
Owl Marketplace Fil. No 1
Description
Final plat replat of one (1) residential lot into five (5) commercial lots
Location
Parcels
5301001015 5301001015
Applicant
DREXEL, BARRELL & CO.
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
Tim McConnell ( TMcConnell@drexelbarrell.com )
(719) 260-0887 x1219
EA Number
EA21191
File Number
VR2321
Project Manager
Kylie Bagley
Status
Active
Created
5/17/2022 1:26:28 PM

View: Project Documents



Review Comments (108)

Link Agency Comment
County Attorney - Water
12/6/2024 1:16:25 PM
A recommendation for water sufficiency was made on November 12, 2024. Please see the additional comments uploaded on that date, as well as the Requirements section of the water review, for administrative items that need to be addressed before the plat is recorded. 12/6/2024 1:16:25 PM
View PCD Project Manager
12/5/2024 3:37:04 PM
Minor comments on Final Plat. Can schedule for hearing once a finding of water sufficiency is made. 12/5/2024 3:37:04 PM
View EPC Health Department
12/5/2024 12:43:49 PM
12/5/2024 12:43:49 PM
View County Attorney - Water
11/12/2024 2:12:34 PM
See attached Water Supply Review and Recommendations. Additionally:
1. Please remove the WSIS uploaded on 9/14/24 from the file.
2. Please remove the Water Resource Report uploaded 10/24/24 from the file, and please upload the September 2024 Water Resource Report in that slot.
Thanks!
11/12/2024 2:12:34 PM
PCD Project Manager
11/12/2024 9:49:14 AM
Minor comment on final plat 11/12/2024 9:49:14 AM
View PCD Engineering Division
11/8/2024 9:58:55 PM
No additional comments on the engineering documents. Please see minor comments on the attached final plat regarding the BFE's shown and coordinate with the floodplain administrator. Please also see any minor comments on the plat from planning.

Engineering documents will be routed for approval by the ECM administrator.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
11/8/2024 9:58:55 PM
EPC Stormwater Review
11/5/2024 7:27:47 AM
EPC DPW Stormwater has no further comments.

Reviewed by:
Christina Prete, P.E.
Stormwater Manager
ChristinaPrete@elpasoco.com
11/5/2024 7:27:47 AM
RBD Floodplain
10/25/2024 1:30:12 PM
parcel is only 4.61 acres and does not meet the minimum 5 acres or 50 lots to trigger floodplain easement and tract requirements. Draft model backed BFEs for this area have been developed as part of Phase 1 for the ongoing El Paso County, CO, Risk MAP Project”. The data has been reviewed and approved through FEMA’s QA/QC process (May 11, 2022)
BFE lines on this plat are accurate according to the aforementioned study.

Note 1 calls the floodplain zone x which is not accurate , it should read zone A, please revise.
10/25/2024 1:30:12 PM
View PCD Engineering Division
9/30/2024 8:37:39 PM
Review 7 comments on the following documents will be uploaded:
-Final Plat: Previous review comments have not been addressed.
-FAE: Please have the owner sign the document.

Deviation for wider driveway is in review with the ECM administrator.

Kylie: a 7-day turnaround is sufficient.

reviewed by:
Daniel Torres, P.E.
danieltorres@elpasoco.com
719-208-6783
9/30/2024 8:37:39 PM
PCD Project Manager
9/30/2024 3:05:24 PM
Planning department has no comments at this time. Please address County Attorney comments and the State of Colorado's comments regarding water. Application cannot be scheduled for hearing until outstanding comments are addressed. 9/30/2024 3:05:24 PM
EPC Stormwater Review
9/24/2024 2:13:17 PM
No further comments by EPC DPW Stormwater.

-Glenn Reese
9/24/2024 2:13:17 PM
County Attorney - Water
9/24/2024 12:16:14 PM
1. There are now 2 WSIS forms in the file. Assuming that the one uploaded 9/14/24 is the correct one, please remove the one uploaded 6/23/24. The current WSIS must separate the residential uses from the commercial uses and identify the water supply source(s) in Section 10.
2. The new WSIS estimates a total annual demand for the subdivision of 10.06 AF. The Water Resource Report discusses a demand of 4.88 AF/year for commercial and a presumed 0.5 AF/year for residential (based on the maximum annual withdrawal in the well permit). The commitment letter commits to providing 4.88 AF/year to the commercial lots. Please reconcile.
3. The SEO letter does not render an opinion regarding adequacy of the water supply. Please address their comments and obtain an updated letter.
9/24/2024 12:16:14 PM
View Colorado Division of Water Resources
9/20/2024 2:00:33 PM
9/20/2024 2:00:33 PM
View PCD Engineering Division
7/22/2024 3:54:20 PM
FAE comments 7/22/2024 3:54:20 PM
PCD Project Manager
7/22/2024 3:54:17 PM
Planning department has no comments at this time. Please address County Attorney comments regarding water and Engineering comments. Application cannot be scheduled for hearing until outstanding comments are addressed. 7/22/2024 3:54:17 PM
View PCD Engineering Division
7/22/2024 3:53:53 PM
Final Plat comments 7/22/2024 3:53:53 PM
PCD Engineering Division
7/22/2024 3:50:35 PM
Review 6 comments on the following documents will be uploaded:
-Final Plat: Please address previous comments.
-FAE: Minor comments

Please note that FAE may need to be revised if a separate CDR application is processed for ovelot grading and construction of the Box culvert.

reviewed by:
Daniel Torres, P.E.
danieltorres@elpasoco.com
719-208-6783
7/22/2024 3:50:35 PM
County Attorney - Development Review
7/19/2024 3:10:55 PM
No further comments on SIA. 7/19/2024 3:10:55 PM
EPC Stormwater Review
7/16/2024 12:35:38 PM
No further comments by EPC DPW Stormwater.

-Glenn Reese
7/16/2024 12:35:38 PM
County Attorney - Water
7/15/2024 2:55:29 PM
Please upload the court decree for the residential lot's water rights and proof of ownership of those rights (such as a deed to the current owner conveying the water rights necessary for a 300-year supply). Once the ownership paperwork has been uploaded and an updated letter from the Colorado Division of Water Resources has been received addressing all 5 lots in the subdivision, the County Attorney's office can begin review. 7/15/2024 2:55:29 PM
PCD Project Manager
6/14/2024 3:18:25 PM
The Planning Department has no further comments at this time. 6/14/2024 3:18:25 PM
PCD Engineering Division
6/14/2024 8:32:54 AM
Review 5 comments on the following documents will be uploaded:
-Plat

Please submit deviation request for Meridian Park Drive cross section and turn lanes per previous comments.

Please submit the following documents signed by owner/developer for approval:
Final Drainage Report
Construction Drawings
FAE
GEC
ESQCP
Deviation Request
Development Agreement: sent to Galloway via email


reviewed by:
Daniel Torres
danieltorres@elpasoco.com

&

Hao Vo
haovo@elpasoco.com
6/14/2024 8:32:54 AM
County Attorney - Water
6/13/2024 4:19:05 PM
1. Please provide a single WSIS that includes the both the demand for the 4 commercial lots and the demand for the 1 residential lot. It must identify the aquifer from which the residential lot gets its supply and the relevant water court decree.
2. The Water Resource Report must address the estimated demand and the water supply for the residential lot, as well as the commercial lots. Please include a copy of the court decree for the residential lot’s water rights and proof of ownership of those rights (such as a deed to the current owner conveying the water rights necessary for a 300-year supply).
3. Please provide an updated SEO letter that addresses all 5 lots in the subdivision.
4. Note that the WSIS has an estimated demand for the 4 commercial lots of 12 acre-feet, while the commitment letter and Water Resource Report both use 4.88 acre-feet. Please reconcile.

Lori Seago
719-520-7371
6/13/2024 4:19:05 PM
County Attorney - Development Review
6/13/2024 12:57:37 PM
Requested edits to SIA from 11/9/23 remain unaddressed. 6/13/2024 12:57:37 PM
RBD Floodplain
6/6/2024 12:56:34 PM
we had a meeting on this site 6/3/24, 4:00pm , the applicant was going to look into options/reconfigure to address floodplain requirements of plating the floodplain into tracts or no build easements. 6/6/2024 12:56:34 PM
EPC Stormwater Review
6/6/2024 8:01:05 AM
When Daniel's comments have been addressed please sign, stamp, and resubmit the following documents:
- CDs
- ESQCP
- FAE
- FDR
- GEC Plan

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
6/6/2024 8:01:05 AM
County Attorney - Water
5/16/2024 10:09:11 AM
I apologize for failing to recognize this issue before now. Because Lot 14, Falcon Ranchettes is being replatted as part of this subdivision, it must be included in the analysis of water supply sufficiency. The estimated demand for this lot must be included in the WSIS, and the demand and supply must be addressed in the Water Resources Report and letter from the State Engineer’s Office. Please also note that the WSIS in the file and the WSIS attached to the Water Resources Report are different; please make sure they are the same to avoid confusion. 5/16/2024 10:09:11 AM
County Attorney - Development Review
5/15/2024 1:33:12 PM
Edits to SIA from 11/9/23 remain unaddressed. 5/15/2024 1:33:12 PM
View PCD Engineering Division
5/14/2024 7:52:06 AM
Final drainage report redlines 5/14/2024 7:52:06 AM
View PCD Engineering Division
5/14/2024 7:51:30 AM
Turn movement exhibit redlines 5/14/2024 7:51:30 AM
View PCD Engineering Division
5/14/2024 7:50:53 AM
Roundabout exhibit redlines 5/14/2024 7:50:53 AM
View PCD Engineering Division
5/14/2024 7:50:26 AM
Final Plat redlines 5/14/2024 7:50:26 AM
View PCD Engineering Division
5/14/2024 7:49:59 AM
CD's redlines 5/14/2024 7:49:59 AM
PCD Engineering Division
5/14/2024 7:54:42 AM
Review 4 comments on the following documents will be uploaded:
-CD's
-Plat
-Roundabout exhibit
-Turn movements exhibit
-FDR

Please submit deviation request for Meridian Park Drive cross section and turn lanes per previous comments.

reviewed by:
Daniel Torres
danieltorres@elpasoco.com
5/14/2024 7:54:42 AM
PCD Project Manager
5/13/2024 4:07:12 PM
Add landscaping to the FAE 5/13/2024 4:07:12 PM
PCD Project Manager
5/13/2024 1:03:44 PM
The Planning Department has no further comments at this time 5/13/2024 1:03:44 PM
EPC Stormwater Review
4/29/2024 5:54:55 PM
Review 4: EPC DPW Stormwater comments have been resolved on the following documents:
- CDs
- FAE
- FDR

Please sign and resubmit the following document:
- PBMP Applicability Form

EPC DPW Stormwater has no further comments. Planner: no re-review necessary.

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
4/29/2024 5:54:55 PM
View PCD Engineering Division
3/28/2024 5:50:24 PM
Turn Movements document redlines 3/28/2024 5:50:24 PM
View PCD Engineering Division
3/28/2024 5:49:48 PM
GEC plan redlines 3/28/2024 5:49:48 PM
View PCD Engineering Division
3/28/2024 5:49:23 PM
Letter of intent redlines 3/28/2024 5:49:23 PM
View PCD Engineering Division
3/28/2024 5:48:59 PM
Plat redlines 3/28/2024 5:48:59 PM
View PCD Engineering Division
3/28/2024 5:56:45 PM
Final Drainage Report redlines 3/28/2024 5:56:45 PM
View PCD Engineering Division
3/28/2024 5:47:59 PM
FAE redlines 3/28/2024 5:47:59 PM
View PCD Engineering Division
3/28/2024 5:47:36 PM
Traffic Impact Study redlines 3/28/2024 5:47:36 PM
View PCD Engineering Division
3/28/2024 5:54:14 PM
Construction Drawings redlines 3/28/2024 5:54:14 PM
PCD Engineering Division
3/28/2024 5:51:49 PM
Review 3 comments on the following documents will be uploaded:
-Construction Drawings
-TIS
-FAE
-Final Drainage Report (minor comments)
-PLAT
-LOI (see comments from planner)
-GEC Plan (Minor comment)
-Turn Movements document

reviewed by:
Daniel Torres, P.E.
Senior Engineer
El Paso County Department of Public Works
2880 International Circle
Colorado Springs, CO 80910
719.520.6305 (Office) | 719.208.6783 (Cell)
https://planningdevelopment.elpasoco.com/
3/28/2024 5:51:49 PM
View PCD Project Manager
3/26/2024 3:52:52 PM
Water Resources Report Redlines 3/26/2024 3:52:52 PM
PCD Project Manager
3/26/2024 3:47:44 PM
The planning department has outstanding comments on the following documents

-Letter of Intent
-Water Supply Information
-Final Plat

Water sufficiency is needed for all lots within the subdivision, this does include Lot 5. No final plat shall receive a recommendation of approval by the Planning Commission or be approved by the approving authority without a finding that the proposed water supply is sufficient in terms of quality, quantity and dependability for the proposed subdivision.
3/26/2024 3:47:44 PM
EPC Stormwater Review
3/25/2024 3:55:06 PM
Review 3: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs..............(to be uploaded by PM)
- FAE..............(to be uploaded by PM)
- FDR..............(to be uploaded by PM)

EPC DPW Stormwater comments have been resolved on the following documents:
- ESQCP
- GEC Plan

Unresolved previous comment:
Please sign and resubmit the following document:
- PBMP Applicability Form

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
3/25/2024 3:55:06 PM
View EPC Environmental Services
3/20/2024 12:15:24 PM
3/20/2024 12:15:24 PM
County Attorney - Water
3/20/2024 8:53:11 AM
Comments from 1/18/2024 remain unaddressed. 3/20/2024 8:53:11 AM
County Attorney - Development Review
3/19/2024 2:36:57 PM
Comments from 11/9/23 remain unaddressed. 3/19/2024 2:36:57 PM
Pikes Peak Regional Building Department
3/12/2024 3:36:03 PM
1. A wrecking permit to remove the current home/mobile is required through RBD. The El Paso County Assessor’s database shows the address 11745 Owl Place but the permit history is with the address of 7750 Meridian Road. I am contact the Assessor’s office to correct the address, so that the records match up.

2. Standard Final Plat comments:
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only).
c. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org
d. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
3/12/2024 3:36:03 PM
View PCD Project Manager
1/25/2024 8:02:54 AM
GEC Plan 1/25/2024 8:02:54 AM
View PCD Project Manager
1/25/2024 7:57:27 AM
Traffic Impact Study Redlines 1/25/2024 7:57:27 AM
View PCD Project Manager
1/25/2024 7:57:02 AM
Financial Assurance Form Redlines 1/25/2024 7:57:02 AM
View PCD Project Manager
1/25/2024 7:56:26 AM
Drainage Report Redlines 1/25/2024 7:56:26 AM
View PCD Project Manager
1/25/2024 7:55:03 AM
Construction Drawing Redlines 1/25/2024 7:55:03 AM
View PCD Project Manager
1/25/2024 7:51:20 AM
Water Supply Information Redlines 1/25/2024 7:51:20 AM
View PCD Project Manager
1/25/2024 7:50:54 AM
Final Plat Redlines 1/25/2024 7:50:54 AM
View PCD Project Manager
1/25/2024 7:50:25 AM
Letter of Intent Redlines 1/25/2024 7:50:25 AM
PCD Project Manager
1/25/2024 7:58:06 AM
The planning department has comments on the following documents (comments made in green):
-Letter of Intent
-Financial Assurance Forms
-Plat
-Water Supply Information Summary

Kylie Bagley
Planner III
1/25/2024 7:58:06 AM
PCD Engineering Division
1/24/2024 2:52:11 PM
Review 2 comments on the following documents will be uploaded by the project manager:
-CDs
-TIS
-FAE
-FDR
-PLAT
-LOI

reviewed by:
Daniel Torres, P.E.
Senior Engineer
El Paso County Department of Public Works
2880 International Circle
Colorado Springs, CO 80910
719.520.6305 (Office) | 719.208.6783 (Cell)
https://planningdevelopment.elpasoco.com/
1/24/2024 2:52:11 PM
View Colorado Geological Survey
1/22/2024 10:50:55 AM
See attached comments 1/22/2024 10:50:55 AM
RBD Floodplain
1/18/2024 3:45:49 PM
CLOMR 22-08-0669R was issued 12/21/2022.
Prior to ground breaking please coordinate the local floodplain permit with :
Keith Curtis, PE, CFM, LEED AP
Floodplain Administrator
Pikes Peak Regional Building Department
2880 International Circle
Colorado Springs CO, 80910
O: 719-327-2898 E: keith@pprbd.org W: pprbd.org

PLAT CAN ONLY BE PROCESSED AFTER THE POST PROJECT LOMR BECOMES EFFECTIVE. SUGGEST MOVING ON THE POST PROJECT LOMR AS SOON AS FINAL LOMR CONDITIONS ARE ABLE TO BE RECORDED AS BUILT. LOMRS ARE TYPICALLY TAKING ONE YEAR TO GET THROUGH FEMA FOLLOWED BY A 4.5 MONTH APPEALS PERIOD PRIOR TO BECOMING EFFECTIVE.
1/18/2024 3:45:49 PM
County Attorney - Water
1/18/2024 11:40:23 AM
1. The water supply documents must either separate irrigation demand from commercial use demand or specifically identify whether irrigation is included in the total estimated commercial use demand.
2. Please upload an updated letter from WHMD that commits to an amount in acre-feet after this property has been included into the WHMD service area per their July 24, 2023 letter.
3. Thank you for the detailed info in the WRR about WHMD’s total available water supply and the annual total demand for the last few years. Please also include a short discussion of the total amount of water that has been committed by WHMD to past developments, so that this Office can determine the amount of uncommitted water supply available to the District.
4. In the WRR, please include a short discussion of how WHMD has come to establish an SFE equivalent for commercial uses of 3 SFE/acre of commercial land.
5. Please ensure that all documents are updated to contain consistent estimated demand amounts. The SEO letter and WRR estimate total subdivision demand at 4.88 annual AF. The most recent WSIS estimates 12 annual AF. The WHMD letter commits to 31 SFEs, which according to the info in the WRR would equate to 10.9 AF (31 x 0.353).
1/18/2024 11:40:23 AM
View EPC Stormwater Review
1/18/2024 10:07:38 AM
ESQCP 1/18/2024 10:07:38 AM
Pikes Peak Regional Building Department
1/17/2024 1:59:32 PM
1. The following structures need to be removed via a wrecking permit, 7750 N Meridian Road, (although, the Assessors states 11745 Owl Place), and 11685 Owl Place.
2. After conversations with Kate Varnum and El Paso-teller 9-1-1 Authority, it is agreed to keep Meridian Market Drive as the street name for this development.
3. Add the addresses to the plat that were received. Address to lot 5 will be 7886 Meridian Park Drive but is preliminary and is subject to change base on the unknown development.
4. I am not seeing comments from the Floodplain Administrator, Keith Curtis, has he seen this project? keith@pprbd.org
5. Standard Final Plat comments:
a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only).
c. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org
d. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt


Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
1/17/2024 1:59:32 PM
County Attorney - Development Review
1/9/2024 4:43:16 PM
Comments from 11/9/23 remain unaddressed. 1/9/2024 4:43:16 PM
EPC Stormwater Review
1/18/2024 10:08:33 AM
Review 2: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs..............(to be uploaded by PM)
- ESQCP
- FAE..............(to be uploaded by PM)
- FDR..............(to be uploaded by PM)
- GEC Plan.....(to be uploaded by PM)

EPC DPW Stormwater comments have been resolved on the following documents:
- GEC Checklist
- Letter of Intent
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Please sign and resubmit the following documents:
- GEC Checklist
- PBMP Applicability Form
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
1/18/2024 10:08:33 AM
911 Authority - El Paso/Teller County
1/9/2024 8:19:30 AM
Regarding the confusion surrounding Meridian Park Dr on past comments:

With the adjacent development of Meridian Storage to the North of Owl Marketplace Filing 1, Meridian Park Dr will become an acceptable logical continuation through Owl Marketplace to the point where it meets with Falcon Market Pl at the roundabout.

Meridian Park Dr is approved for Owl Marketplace Filing 1

Thank you.
Justin
1/9/2024 8:19:30 AM
View PCD Project Manager
11/27/2023 3:21:58 PM
TIS Redlines 11/27/2023 3:21:58 PM
View PCD Project Manager
11/27/2023 3:16:29 PM
Subdivision Summary Redlines 11/27/2023 3:16:29 PM
View PCD Project Manager
11/27/2023 3:15:31 PM
Letter of Intent Redlines 11/27/2023 3:15:31 PM
View PCD Project Manager
11/27/2023 3:14:31 PM
GEC Plan Redlines 11/27/2023 3:14:31 PM
View PCD Project Manager
11/27/2023 3:13:29 PM
Final Drainage Report Redlines 11/27/2023 3:13:29 PM
View PCD Project Manager
11/27/2023 3:12:04 PM
ESQCP Redlines 11/27/2023 3:12:04 PM
View PCD Project Manager
11/27/2023 3:11:13 PM
Construction Drawing Redlines 11/27/2023 3:11:13 PM
View PCD Project Manager
11/27/2023 3:09:16 PM
Final Plat Redlines 11/27/2023 3:09:16 PM
View PCD Project Manager
11/27/2023 3:08:18 PM
Water Supply Information Summary 11/27/2023 3:08:18 PM
View PCD Project Manager
11/27/2023 3:07:23 PM
Financial Assurance Form Redlines 11/27/2023 3:07:23 PM
View PCD Project Manager
11/22/2023 11:00:21 AM
Title Commitment Redlines 11/22/2023 11:00:21 AM
View PCD Project Manager
11/22/2023 10:58:55 AM
Fire Protection Report Redlines 11/22/2023 10:58:55 AM
View PCD Project Manager
11/22/2023 10:58:31 AM
Application Redlines 11/22/2023 10:58:31 AM
View PCD Project Manager
11/22/2023 10:57:20 AM
Wastewater Commitment Letter Redlines 11/22/2023 10:57:20 AM
View PCD Project Manager
11/22/2023 10:56:43 AM
Water Commitment Letter Redlines 11/22/2023 10:56:43 AM
PCD Project Manager
11/27/2023 3:04:41 PM
The planning department has comments on the following documents.

- Water Commitment Letter
- Wastewater Commitment Letter
- Final Plat
- Application
- Letter of Intent
- Fire Protection Report
- Title Commitment
11/27/2023 3:04:41 PM
PCD Engineering Division
11/27/2023 12:45:48 PM
Engineering Review Ver.1

Please see engineering comments on the following documents:
CLOMR Report_V1
CD_V1
TIS_V1- Will require updating.
FAE_V1
FDR_V1
PLAT_V1
GEC PLAN_V1
LOI_V1
ESQCP_V1
Subdivision Summary_V1
Water Supply Summary_V1

Due to volume and complexity of comments provided additional comments should be expected on the subsequent submittal. A 21-day review period will be required similar to the first submittal.

Edward Schoenheit, Engineer I
E.P.C. Dept. of Public Works
2880 International Circle
Colorado Springs, CO. 80910
Office: 719.520.6813
Cell: 719.502.9659
https://planningdevelopment.elpasoco.com/

Daniel Torres, P.E.
Senior Engineer
El Paso County Department of Public Works
2880 International Circle
Colorado Springs, CO 80910
719.520.6305 (Office) | 719.208.6783 (Cell)
https://planningdevelopment.elpasoco.com/
11/27/2023 12:45:48 PM
View Colorado Geological Survey
11/21/2023 1:45:15 PM
See attached comments 11/21/2023 1:45:15 PM
Mountain View Electric Association, Inc.
11/21/2023 11:31:12 AM
MVEA has no objection to the vacate and replat of Lot 15 11/21/2023 11:31:12 AM
View EPC Stormwater Review
11/21/2023 8:20:40 AM
SWMP Checklist 11/21/2023 8:20:40 AM
View EPC Stormwater Review
11/21/2023 8:20:20 AM
SWMP 11/21/2023 8:20:20 AM
View EPC Stormwater Review
11/21/2023 8:19:53 AM
PBMP Applicability Form 11/21/2023 8:19:53 AM
View EPC Stormwater Review
11/21/2023 8:19:32 AM
GEC Checklist 11/21/2023 8:19:32 AM
View EPC Stormwater Review
11/21/2023 8:18:15 AM
ESQCP 11/21/2023 8:18:15 AM
EPC Stormwater Review
11/21/2023 8:14:35 AM
Review 1: EPC DPW Stormwater comments have been provided (in orange text boxes) on the following uploaded documents:
- CDs.......................(to be uploaded with Development Services comments)
- ESQCP
- FAE........................(to be uploaded with Development Services comments)
- FDR.......................(to be uploaded with Development Services comments)
- GEC Plan...............(to be uploaded with Development Services comments)
- GEC Checklist
- Letter of Intent........(to be uploaded with Development Services comments)
- PBMP Applicability Form
- SWMP
- SWMP Checklist

Reviewed by:
Glenn Reese, P.E.
Stormwater Engineer III
GlennReese@elpasoco.com
11/21/2023 8:14:35 AM
Colorado Springs Utilities, Dev, Svc.(includes water resources)
11/15/2023 9:56:13 AM
CSU UDS does not have any comments.

Coordinate with CSU Field Engineering for Gas service 719-668-4985
11/15/2023 9:56:13 AM
911 Authority - El Paso/Teller County
11/15/2023 7:08:02 AM
Please disregard my previous comments.
The public ROW depicted on the plan drawings should be considered a logical continuation of existing Falcon Market Pl, please adjust the name on the drawings accordingly.
Thank you.
Justin.
11/15/2023 7:08:02 AM
Pikes Peak Regional Building Department
11/14/2023 11:25:39 AM
1. A wrecking permit to remove the current home/mobile home is required through Regional Building Department. The El Paso County Assessor’s database shows the address 11745 Owl Place but the permit history is with the address of 7750 N Meridian Road.
2. Enumerations has not seen the development plan. What is projected for these lots?
3. A logical continuation of a street name should be with what it is attaching to now, what is existing. Meridian Market Drive is not clearly attaching at this time. Please change the street name to Falcon Market Place.
4. Standard Development plan comments;
a. For assignment of addressing for lots and tracts, place addressing marker (xxx) where they are intended to be utilized. Addressing marker for lots should be front door.
b. Provide a 100 scale copy or larger of the entire APPROVED development plan (d.p.) to this department so that addressing can be assigned. Once received, the development plan will be placed on a list to be addressed. Development plans that are not yet approved may be addressed, however additional plan review fees will accrue if changes are made to the D.P. after initial addressing.
c. If underground service is needed prior to plat, submit a Utilities Addressing Plan (UAP), to Colorado Springs Utilities via the related link at https://www.csu.org/Pages/GISMapping.aspx For more information contact: Jade Swan jswan@csu.org



Amy Vanderbeek
Enumerations Plans Examiner
Pikes Peak Regional Building Department
O: 719-327-2930 E: Amy@pprbd.org
11/14/2023 11:25:39 AM
View EPC Parks Department
11/14/2023 10:07:36 AM
See final Parks comments attached. 11/14/2023 10:07:36 AM
Colorado Parks and Wildlife
11/9/2023 7:50:29 PM
Colorado Parks and Wildlife (CPW) has reviewed the plans for the Owl Place Vacate/Replat in El Paso County. Colorado Parks and Wildlife (CPW) is familiar with the site. Based both on the location and type of action that has been taken CPW anticipates that the impacts to the wildlife resource from this project would be negligible.

We appreciate being allowed to comment. Please feel free to contact District Wildlife Manager, Aaron Berscheid, should you have any questions or require additional information at 719-439-9601 or via email at aaron.berscheid@state.co.us
11/9/2023 7:50:29 PM
View County Attorney - Development Review
11/9/2023 3:33:41 PM
Edits to SIA attached. 11/9/2023 3:33:41 PM
View EPC Environmental Services
11/9/2023 10:53:51 AM
11/9/2023 10:53:51 AM
Upper Black Squirrel Creek GWMD
11/8/2023 2:22:02 PM
The Upper Black Squirrel Creek GWMD does not have any comments at this time but respectfully reserves the right to comment on any future submittals. Thank you. 11/8/2023 2:22:02 PM
View Falcon Fire Protection District
11/8/2023 1:34:26 PM
11/8/2023 1:34:26 PM
View Colorado Division of Water Resources
11/8/2023 11:22:32 AM
11/8/2023 11:22:32 AM
County Attorney - Water
11/7/2023 2:59:26 PM
County Attorney’s Office will review for water sufficiency following receipt of findings from the Colorado Division of Water Resources. Thank you. 11/7/2023 2:59:26 PM
911 Authority - El Paso/Teller County
11/6/2023 10:34:53 AM
Meridian Park Dr exists in line with this development to the north approximately 200 m.
This is a logical continuation under the assumption that this area will continue to develop, and these will merge in the near future.

No action required by E911 on this submittal.

Thank you.
Justin
11/6/2023 10:34:53 AM