PCD Engineering Division
10/17/2022 3:39:51 PM |
Review 3: No additional PCD engineering comments. The engineering documents will be uploaded onto EDARP once approved by the ECM administrator. reviewed by: Daniel Torres danieltorres@elpasoco.com |
10/17/2022 3:39:51 PM | |
EPC Stormwater Review
10/17/2022 3:40:10 PM |
Review 3: EPC Stormwater comments have been resolved on the following documents: - Drainage Report - FAE - GEC Plan EPC Stormwater has no further comments at this time. Thanks. Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
10/17/2022 3:40:10 PM | |
View |
PCD Engineering Division
7/12/2022 11:54:28 AM |
GEC Plan redlines | 7/12/2022 11:54:28 AM |
View |
PCD Engineering Division
7/12/2022 11:53:24 AM |
FAE redlines | 7/12/2022 11:53:24 AM |
PCD Engineering Division
7/12/2022 12:02:48 PM |
Review 2 Comments on the following documents will be uploaded: -FAE -GEC plan Please address the review 1 comments provided on the drainage report with the final plat application SF2216. reviewed by: Daniel Torres danieltorres@elpasoco.com |
7/12/2022 12:02:48 PM | |
EPC Stormwater Review
7/8/2022 3:25:05 PM |
Review 2: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...(awaiting resubmittal of revised FDR with SF2216, since a duplicate FDR was not uploaded with EGP223) - FAE......................(to be uploaded by PM with PCD comments) - GEC Plan.............(to be uploaded by PM with PCD comments) EPC Stormwater comments have been resolved on the following documents: - ESQCP (please sign and date the last page and re-submit) - GEC Checklist (please sign and date the last page and re-submit) - PBMP Applicability Form (please sign and date the last page and re-submit) - SWMP - SWMP Checklist (please sign and date the last page and re-submit) Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
7/8/2022 3:25:05 PM | |
Bent Grass Metro
6/1/2022 3:35:03 PM |
Bent Grass Metropolitan District Fees Mill Levy 30 debt service 8.641 O&M Traffic Signal Fee: - Residential - $1000/ACRE Commercial - $10,000/ACRE Platting Fees: Commercial- $5500/ACRE Residential- $5500/ACRE Building Permit Fees: Commercial- Commercial/Industrial/Other non-residential- $1.00/SQUARE FOOT Residential- Single Family- $500/UNIT Multi Family- $350/UNIT |
6/1/2022 3:35:03 PM | |
View |
PCD Engineering Division
5/26/2022 2:40:00 PM |
Drainage Report redlines | 5/26/2022 2:40:00 PM |
View |
PCD Engineering Division
5/26/2022 2:38:20 PM |
ESQCP redlines | 5/26/2022 2:38:20 PM |
View |
PCD Engineering Division
5/26/2022 2:37:56 PM |
GEC plan redlines | 5/26/2022 2:37:56 PM |
View |
PCD Engineering Division
5/26/2022 2:37:06 PM |
FAE redlines | 5/26/2022 2:37:06 PM |
PCD Engineering Division
5/26/2022 2:36:36 PM |
Review 1 comments on the following documents will be uploaded: -FAE -GEC plan -ESQCP -Drainage report: (these comments have also been provided on project SF2216) reviewed by: Daniel Torres danieltorres@elpasoco.com |
5/26/2022 2:36:36 PM | |
Colorado Springs Utilities, Dev, Svc.(includes water resources)
5/26/2022 1:16:35 PM |
No comments. Approval can be recommended. ____________________________________________________ Corey Masoumi | Engineering Support Coordinator Utilities Development Services | Colorado Springs Utilities 1521 S Hancock Expy Colorado Springs, CO 80903 O: 719-668-1856 | Main: 719-668-8259 cmasoumi@csu.org | www.csu.org |
5/26/2022 1:16:35 PM | |
View |
EPC Stormwater Review
5/26/2022 9:27:15 AM |
SWMP Checklist | 5/26/2022 9:27:15 AM |
View |
EPC Stormwater Review
5/26/2022 9:26:53 AM |
SWMP | 5/26/2022 9:26:53 AM |
View |
EPC Stormwater Review
5/26/2022 9:25:37 AM |
PBMP Applicability Form | 5/26/2022 9:25:37 AM |
View |
EPC Stormwater Review
5/26/2022 9:25:21 AM |
GEC Checklist | 5/26/2022 9:25:21 AM |
EPC Stormwater Review
5/26/2022 9:24:56 AM |
Review 1: EPC Stormwater comments have been provided (in orange text boxes) on the following uploaded documents: - Drainage Report...(see comments on SF2216, since a duplicate DR was not uploaded with EGP223) - ESQCP..................(to be uploaded by PM with PCD comments) - FAE.......................(to be uploaded by PM with PCD comments) - GEC Plan...............(to be uploaded by PM with PCD comments) - GEC Checklist - PBMP Applicability Form - SWMP - SWMP Checklist In general, the comments on EGP223 are copy/pasted from SF2216. But a couple on the GEC Plan and FAE are unique to EGP223. Reviewed by: Glenn Reese, P.E. Stormwater Engineer II glennreese@elpasoco.com |
5/26/2022 9:24:56 AM | |
PCD Project Manager
5/25/2022 12:07:41 PM |
Engineering will upload their comments | 5/25/2022 12:07:41 PM | |
Mountain View Electric Association, Inc.
5/23/2022 3:52:29 PM |
No comment on grading | 5/23/2022 3:52:29 PM |