Project Review Comments

Back to List


Project Name
Lorson Ranch Commercial
Description
Rezone from PUD Commercial (conceptual) to Commercial Service
Location
Fontaine Blvd. and Marksheffel
Parcels
5522104050 5522104050
Applicant
Matrix Design Group, Inc.
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609
Jason Alwine ( jason_alwine@matrixdesigngroup.com )
(719) 457-5609
EA Number
EA2243
File Number
P2211
Project Manager
Kari Parsons
Status
Active
Created
3/8/2022 7:35:17 AM

View: Project Documents



Review Comments (23)

Link Agency Comment
View Traffic Review Consultant
11/15/2022 5:36:33 PM
Refer to attached comment letter and comments uploaded into the associated Bluebeam session. 11/15/2022 5:36:33 PM
PCD Engineering Division
11/14/2022 10:17:06 AM
Review 2 redline comments to the following documents will be uploaded as separate comments by the project manager.

- Traffic Impact Study

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
11/14/2022 10:17:06 AM
Colorado Springs Public Works
11/9/2022 9:27:01 AM
EDRD has the following comment:
Marksheffel Blvd is controlled by The City of Colorado Springs and the proposed development is required to install public C&G, sidewalk/trial and asphalt (if necessary) along Marksheffel adjacent to the site. The sidewalk/trail will be detached from the curb and the sidewalk width will be 6 feet or 10 feet.
A street improvement construction plan and financial assurance are required for the new C&G, sidewalk/Trail and asphalt (if necessary). The construction plan shall be submitted for review and approval to Engineering Development Review Division (EDRD) and Traffic Engineering via our electronic review system called ProjectDox. A user manual for submitting documents can be found on the Stormwater Enterprise web page. (https://coloradosprings.gov/stormwater/planreview?mlid=49646.)
The financial assurance shall be posted with the City prior to the approval of the construction plans.
The concrete installation with in Marksheffel Blvd right-of-way requires the contractor to have a City of Colorado Springs concrete license, concrete permits and inspected by the EDRD inspection team.

Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
11/9/2022 9:27:01 AM
View PCD Project Manager
11/17/2022 8:03:04 AM
Traffic Impact Study Redlines 11/17/2022 8:03:04 AM
Colorado Springs Public Works
11/10/2022 10:29:40 AM
Traffic Engineering is fine with rezoning; however, access points location will be further discussed with reviewing future development plans.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
11/10/2022 10:29:40 AM
View PCD Project Manager
7/27/2022 12:51:37 PM
Zoning Map Redlines 7/27/2022 12:51:37 PM
View PCD Project Manager
7/27/2022 12:51:11 PM
Traffic Impact Study Redlines 7/27/2022 12:51:11 PM
View PCD Project Manager
7/27/2022 12:50:46 PM
Letter of Intent Redlines 7/27/2022 12:50:46 PM
View PCD Project Manager
7/27/2022 12:50:23 PM
Deviation Fontaine Blvd Redlines 7/27/2022 12:50:23 PM
View EPC Health Department
7/23/2022 10:25:41 PM
7/23/2022 10:25:41 PM
View PCD Project Manager
7/27/2022 12:49:58 PM
Adjacent Property Owner Notifications Redlines 7/27/2022 12:49:58 PM
View Traffic Review Consultant
7/12/2022 1:54:20 PM
The traffic review has been completed. We recommend resubmittal of the TIS and disapproval of the variance request for a site access along Fontaine Boulevard. Refer to the attached letter and comments uploaded to the related Bluebeam session. 7/12/2022 1:54:20 PM
PCD Engineering Division
7/11/2022 1:28:17 PM
Review 1 redline comments to the following documents will be uploaded as separate comments by the project manager.

-Traffic Impact Study
-Deviation Request (Fontaine Blvd)

Reviewed by:
Charlene Durham, PE
charlenedurham@elpasoco.com
7/11/2022 1:28:17 PM
Mountain View Electric Association, Inc.
7/11/2022 11:29:53 AM
Mountain View Electric Association has no objection to the rezone plan 7/11/2022 11:29:53 AM
Colorado Springs Public Works
7/8/2022 10:31:30 AM
Engineering Development Review will require all public improvements to be built to full City Standards if this is chosen for pre-annexation per the IGA.

Joel Dagnillo, P.E.
Engineer III
Engineering Development Review
City of Colorado Springs
(719)385-5412
Joel.dagnillo@coloradosprings.gov
7/8/2022 10:31:30 AM
View EPC Parks Department
7/6/2022 8:57:51 AM
See attached administrative comments on behalf of El Paso County Parks. The El Paso County Parks Master Plan identifies several regional trail and bicycle routes immediately adjacent to the site. This includes the Fontaine Boulevard Bicycle Route and Crews Gulch Regional Trail along Fontaine Boulevard, and the South Marksheffel Bicycle Route along South Marksheffel Road. Parks staff encourages the applicant to provide the necessary bicycle and pedestrian access points, i.e., bicycle lanes and sidewalks, into the commercial development. 7/6/2022 8:57:51 AM
View Widefield SD 3
6/27/2022 3:36:02 PM
6/27/2022 3:36:02 PM
View El Paso County Conservation Dist
6/23/2022 8:57:31 PM
EPCCD grass seed native shotgun mix info attached as a .jpg. 6/23/2022 8:57:31 PM
View El Paso County Conservation Dist
6/23/2022 8:55:19 PM
EPCCD brief comments attached as a .docx. 6/23/2022 8:55:19 PM
Central Marksheffel Metro
6/23/2022 1:59:10 PM
This proposed project is not located in the Central Marksheffel Metropolitan District and is not subject to their fees or property taxes. 6/23/2022 1:59:10 PM
Colorado Springs Public Works
6/22/2022 10:44:57 AM
Traffic Engineering has the following comment:

Traffic Engineering will require all public improvements to be built to full City Standards if this site is chosen for pre-annexation.

Zaker Alazzeh, P.E.
Traffic Engineering Manager/Deputy City Traffic Engineer
City of Colorado Springs
(719) 385-5468
Zaker.Alazzeh@coloradosprings.gov
6/22/2022 10:44:57 AM
Fountain
6/22/2022 9:08:09 AM
No comments on proposed rezone. 6/22/2022 9:08:09 AM
View EPC Environmental Services
6/21/2022 11:17:02 AM
6/21/2022 11:17:02 AM